HomeMy WebLinkAbout31433 / 81-41A D D E N D U M
J�e 18, 1981
•r �. � r. • •i� � •
� a�► : • •� r:a�� � ia�
# 41 RESOI,UfION
BE IT E�SOLVED by the Cotmm� Cow-icil of the City of Oshkosh that the
following Ciiange Order to Prec�ur Construction Co�any Contract for
general construction of the Menacrinee Park CcmLfor,t Station is her�y
at%r�ved.
CEIANGE ORDER 81-04A - ADDING Tf� ANDtINT OF $2,300.00
PREOJUR CODISTRCJCTIOPI GDMPANY
7818 Staiss Road
Oshkash, FTI 5490i
Purpose: Add to General Construction of MP�ominee Park
Comfort Station
Delete two overhead doors on south storage area and add
the follaaing:
West side of storage room: close o�ning w/conc. block to
coimter height, install strvnless steel wimter & rolling
shutter c�or. Width to be the sa� as existing overhead
door o�ning.
East Side: close exi.sting overhead door opening w/conc.
block. Add in the masonxy area a 3'0" hollva metal. door
and f.rame canolete w/ne�ssary harcbaa�. Painted as ner
specifications. Door and fratce shall ba_ as per specifi-
cations.
ADD $2,300.00
BE IT FU1ZPfiER RESOLVED by the Con[ron Coimcil of the City of Oshk�h that
the afore�ntioned change order is hereby appmved; a copy of which is
attached to this resolution.
SU3?;SI'l;r�?` �i'
; �%b'` �Co�E��
- 41 -
�
T0: precour Construction Company
7818 Swiss Road
Oshkosh, WI 54901
�
CHANGE OADER N0. 1
DATED: Sune 17, 1981
Your present contract with the City of Oshkosh, Contract No. 81-04A ,
is hereby amended and changed as follows:
(insert here work and/or materials to be added or eliminated and
the unit and/or lump sum price to be added to or deducted from the
contract.)
Add to General Consttuction of Menominee Park Comfort Station
Delete two overhead doors on south storage azea & add the following:
West side of storage room:close opening w/conc.block to counter
height, install stainless steel counter & rolling shuttei door.
Width to be the same as existing overhead door opening.
East side: close existing overhead door opening w/conc.block.Add
in the masonry area a 3'0" hollow metal door and frame complete
w/necessary hardware. Painted as per specifications. Door and frame
shall be as per specifications
Recommended;
Director of Public 'r!orks
Total Added by Change Order $2,300.00
CITY OF OSHK03H
By:
City :�ianager
City CLerk
Approved and accepted:
Contractor
I certify that provision has been made to pay the liabillty that
will accrue to the City of Oshkosh, Wisconsin, under the within
Change Order.
Comptroller
Approved as to forma
City Attorney
�
�
�
�
�
�
�
�,
0
�
ao
�
�v
�
U
N �
> ti
o • �-
�+ �s +>
f-L� R� m
a o o a�
«i 1 �d �,
� � 6
O o�
� O
J� H �d
G U v
O cd •,-�
�i S. S.
J-� N i�
� S.' � td
rl O O U
O U H
t� 1�
N O O
R'. 1� �
�
�
°i � x
c,
N
� �
�
�
� U