Loading...
HomeMy WebLinkAbout31433 / 81-41A D D E N D U M J�e 18, 1981 •r �. � r. • •i� � • � a�► : • •� r:a�� � ia� # 41 RESOI,UfION BE IT E�SOLVED by the Cotmm� Cow-icil of the City of Oshkosh that the following Ciiange Order to Prec�ur Construction Co�any Contract for general construction of the Menacrinee Park CcmLfor,t Station is her�y at%r�ved. CEIANGE ORDER 81-04A - ADDING Tf� ANDtINT OF $2,300.00 PREOJUR CODISTRCJCTIOPI GDMPANY 7818 Staiss Road Oshkash, FTI 5490i Purpose: Add to General Construction of MP�ominee Park Comfort Station Delete two overhead doors on south storage area and add the follaaing: West side of storage room: close o�ning w/conc. block to coimter height, install strvnless steel wimter & rolling shutter c�or. Width to be the sa� as existing overhead door o�ning. East Side: close exi.sting overhead door opening w/conc. block. Add in the masonxy area a 3'0" hollva metal. door and f.rame canolete w/ne�ssary harcbaa�. Painted as ner specifications. Door and fratce shall ba_ as per specifi- cations. ADD $2,300.00 BE IT FU1ZPfiER RESOLVED by the Con[ron Coimcil of the City of Oshk�h that the afore�ntioned change order is hereby appmved; a copy of which is attached to this resolution. SU3?;SI'l;r�?` �i' ; �%b'` �Co�E�� - 41 - � T0: precour Construction Company 7818 Swiss Road Oshkosh, WI 54901 � CHANGE OADER N0. 1 DATED: Sune 17, 1981 Your present contract with the City of Oshkosh, Contract No. 81-04A , is hereby amended and changed as follows: (insert here work and/or materials to be added or eliminated and the unit and/or lump sum price to be added to or deducted from the contract.) Add to General Consttuction of Menominee Park Comfort Station Delete two overhead doors on south storage azea & add the following: West side of storage room:close opening w/conc.block to counter height, install stainless steel counter & rolling shuttei door. Width to be the same as existing overhead door opening. East side: close existing overhead door opening w/conc.block.Add in the masonry area a 3'0" hollow metal door and frame complete w/necessary hardware. Painted as per specifications. Door and frame shall be as per specifications Recommended; Director of Public 'r!orks Total Added by Change Order $2,300.00 CITY OF OSHK03H By: City :�ianager City CLerk Approved and accepted: Contractor I certify that provision has been made to pay the liabillty that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to forma City Attorney � � � � � � � �, 0 � ao � �v � U N � > ti o • �- �+ �s +> f-L� R� m a o o a� «i 1 �d �, � � 6 O o� � O J� H �d G U v O cd •,-� �i S. S. J-� N i� � S.' � td rl O O U O U H t� 1� N O O R'. 1� � � � °i � x c, N � � � � � U