Loading...
HomeMy WebLinkAbout17-18_Bid_TabContract 17-18 - Water Filtration Plant Clearwells (#9940989) Owner: Oshkosh WI, City of Solicitor: Jacobs Engineering Group, Inc. Bid Opening: 01/22/2026 11:00 AM CST Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Base Bid $47,629,600.00 $49,257,000.00 1 Caterpillar emergency generators and emergency generator switchgear Lump Sum 1.00 $5,199,302.00 $5,199,302.00 $5,200,000.00 $5,200,000.00 2 Schneider Square D electric motor control center Lump Sum 1.00 $551,227.00 $551,227.00 $540,000.00 $540,000.00 3 Two hundred (200) linear feet total of concrete crack repair in CT/BWS Basin in accordance with the Contract Documents Lump Sum 1.00 $25,000.00 $25,000.00 $30,000.00 $30,000.00 4 All demolition and new Work in accordance with the Contract Documents Lump Sum 1.00 $41,854,071.00 $41,854,071.00 $43,487,000.00 $43,487,000.00 Section 2: Optional $0.00 $0.00 A1 Alternate A1; Add/Deduct; Other emergency generator and generator switch gear Lump Sum 1.00 $0.00 $0.00 $0.00 $0.00 A2 Alternate A2; Add/Deduct; Other motor control centers Lump Sum 1.00 $0.00 $0.00 $0.00 $0.00 Bid Total:$47,629,600.00 $49,257,000.00 C.D. Smith Construction Staab Construction Corporation 125 Camelot Drive Fond du Lac, WI 54935 C:\Users\tracyt\Downloads\BidWorksheet_9940989_Eval Page 1 of 2 1/22/2026 Contract 17-18 - Water Filtration Plant Clearwells (#9940989) Owner: Oshkosh WI, City of Solicitor: Jacobs Engineering Group, Inc. Bid Opening: 01/22/2026 11:00 AM CST Section Title Item Code Item Description UofM Quantity Section 1: Base Bid 1 Caterpillar emergency generators and emergency generator switchgear Lump Sum 1.00 2 Schneider Square D electric motor control center Lump Sum 1.00 3 Two hundred (200) linear feet total of concrete crack repair in CT/BWS Basin in accordance with the Contract Documents Lump Sum 1.00 4 All demolition and new Work in accordance with the Contract Documents Lump Sum 1.00 Section 2: Optional A1 Alternate A1; Add/Deduct; Other emergency generator and generator switch gear Lump Sum 1.00 A2 Alternate A2; Add/Deduct; Other motor control centers Lump Sum 1.00 Bid Total: Unit Price Extension Unit Price Extension $50,312,061.00 $55,739,000.00 $5,634,124.00 $5,634,124.00 $5,356,000.00 $5,356,000.00 $597,331.00 $597,331.00 $621,500.00 $621,500.00 $19,082.00 $19,082.00 $30,000.00 $30,000.00 $44,061,524.00 $44,061,524.00 $49,731,500.00 $49,731,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50,312,061.00 $55,739,000.00 Miron Construction Co., Inc.Mid City Corporation C:\Users\tracyt\Downloads\BidWorksheet_9940989_Eval Page 2 of 2 1/22/2026