HomeMy WebLinkAbout2021-2025CIPCITY OF OSHKOSH
2021
CAPITAL IMPROVEMENT PROGRAM
CIP Projects by Department
City of Oshkosh, Wisconsin
PROJECTS BY DEPARTMENT
2021 2025thru
Total20212022202320242025DepartmentProject #
0130 - Facilities
00A FURN RPL 50,00010,000 10,000 10,000 10,000 10,000GS: Office Furniture Replacement
00A HVAC/RF 2,500,000500,000 500,000 500,000 500,000 500,000GS: HVAC/Roofing Replacement Program
21 ADA AUDIT 60,00060,000GS: Complete ADA Audit of all City buildings
22 CTYHALSEC 75,00075,000GS: City Hall Security Improvements
22 SB ELEVS 250,000250,000GS: Safety Building Elevator 1-2 Modernizations
23 CTYHAL2ND 20,00020,000GS: City Hall 2nd Floor Hallway Tile Replacement
23 FAC VEH1 35,00035,000GS: 3/4 Ton Van (repl #003 '97 GMC)
25 FAC VEH1 45,00045,000GS: 3/4 Ton Pickup (repl #002 '08 Ford)
3,035,000570,000 835,000 565,000 510,000 555,0000130 - Facilities Total
0211 - Police
21 PD RENO 150,000150,000POLC: Renovations to Vacant Ofc Space North End
21 PD SWT TR 200,000200,000POLC: SWAT Team Truck Replacement
350,000350,0000211 - Police Total
0230 - Fire
00 PRKG LT18 127,20083,600 43,600FIRE: Parking Lot Program Station 18
21 FIRE BTS 49,50049,500FIRE: Turn Out Gear Boots
21 FIRE GEAR 109,22540,000 32,100 12,800 24,325FIRE: Turn Out Gear Pants & Coats
21 FIRE HELM 29,8575,000 1,740 4,659 18,458FIRE: Turn Out Gear Helmets
21 FIRE VEH1 44,30044,300FIRE: Replace '94 Ford Expl with 1 Ton pickup
21 FIRE VEH2 45,70045,700FIRE: Replacement of '99 Chevrolet Suburban
22 FIRE VEH2 927,000927,000FIRE: Replace 3 Ambulances from '12
22 GEN ST16 60,00060,000FIRE: Replace Generator Station 16
22 HOSE REPL 66,57066,570FIRE: New Hose to Replace Obsolete Hose
23 FIRE ENG1 627,000627,000FIRE: Replace '06 Fire Engine
23 FIRE VEH1 47,00047,000FIRE: Replace '98 Chevy 3500
23 TRNG CTR 3,798,7803,798,780FIRE: Fire Training Center
5,932,132184,500 1,085,670 4,570,920 72,584 18,4580230 - Fire Total
0410 - Utility Infrastructure
21-01 OMRO 300,000300,000DPW: Omro Road Reconstruction
21-03 FDL SS 5,400,4005,400,400ENG: Fond du Lac Sanitary Sewer
21-03 OREGON 10,504,2003,100,600 4,030,700 3,372,900DPW: Oregon Street Interceptor Sewer
21-04 W 9TH 7,211,1007,211,100DPW: West 9th Avenue Reconstruction
21-05 CEAPE 6,040,5006,040,500DPW: Ceape Avenue Reconstruction
21-06A REHAB 4,440,000888,000 888,000 888,000 888,000 888,000SDWK: Rehabilitation & Reconstruction Program
21-06B NWSID 350,00070,000 70,000 70,000 70,000 70,000SDWK: New Walk Ordered In
21-06CSUBSID 150,00030,000 30,000 30,000 30,000 30,000SDWK: Subdivision Agreements
21-07 KNAPP 3,709,6003,709,600ENG: Knapp Street Area Water Main Replacements
21-08 WESTOW 985,000800,000 185,000ENG: Westowne Area Detention Basin
21-11 LEAKS 6,000,0001,000,000 1,000,000 1,000,000 1,500,000 1,500,000ENG: Inflow/Infiltration Removal
21-12 BRADLY 1,894,400100,000 1,794,400ENG: Bradley Street Asphalt Paving
Thursday, April 15, 2021Page 12021 - 2025 CIP Projects by Department
Total20212022202320242025DepartmentProject #
21-13 ANCHOR 3,272,000100,000 2,179,000 993,000ENG: Anchorage Watershed RR-Libbey Storm Sewer
21-14 JOHNAV 3,685,000500,000 3,000,000 185,000ENG: Glatz Cr/Gallups-Merritts/Johnson Av Wtrsheds
21-15 SAWYR 6,800,0001,500,000 300,000 5,000,000ENG: Sawyer Creek Watershed Detention Basin
21-20 STRLAT 3,375,000675,000 675,000 675,000 675,000 675,000ENG: Mini Storm Sewers/Storm Laterals
21-90 CONCRT 1,223,000233,000 235,000 285,000 235,000 235,000ENG: Concrete Pavement Repairs (Annual)
21-91 ENVIR 1,825,000365,000 365,000 365,000 365,000 365,000ENG:20-91 Up-Front Engineering Services
21-93 LEAD 500,000100,000 100,000 100,000 100,000 100,000ENG: Misc. Utility-Owned Lead Service Repl.
22 ALGOMA 9,766,7009,766,700DPW: Algoma Boulevard Reconstruction
22 E LINCOLN 3,249,8003,249,800DPW: East Lincoln Avenue Reconstruction
22 GRAND ST 2,223,3002,223,300DPW: Grand Street Reconstruction
22 ROSALIA 3,032,6003,032,600DPW: Rosalia St WtrMn RPLCMT/Asphalt Paving
22 W 9TH IMP 850,000300,000 550,000ENG: West 9th Ave Gateway Corridor Improvements
23 VEGET 264,00095,000 169,000ENG: Vegetation Planting
23 ASPHALT 1,425,000475,000 475,000 475,000ENG: Asphalt Program (Annual)
23 ENG FRNAU 5,400,00050,000 350,000 5,000,000ENG: Fernau Watershed Detention Basin (Hoffmaster)
23 MCKINLEY 1,087,4001,087,400DPW: McKinley St Reconst
23 MOCKBIRD 103,000103,000ENG: Mockingbird Way Traffic Calming
23 S MAIN 9,275,3009,275,300DPW: S Main St Reconstruction
23 STRING 4,419,000400,000 4,019,000ENG: Stringham Watershed Box Culvert-Phase 2
23 W LINCOLN 3,678,6003,678,600DPW: W Lincoln Ave Reconst
24 CENTRAL 3,709,2003,709,200DPW: Central St Reconst
24 CHERRY 5,456,3005,456,300DPW: Cherry St Reconst
24 MILL ST 1,265,2001,265,200DPW: Mill St Reconst
24 WAUGOO 5,751,1005,751,100DPW: Waugoo Ave Reconst
25 ARTHUR 2,303,4002,303,400DPW: Arthur Ave Reconst
25 BAY SHORE 2,168,0002,168,000DPW: Bay Shore Dr Reconst
25 BOWEN ST 2,978,7002,978,700DPW: Bowen St Reconst
25 RIPON LN 903,100903,100DPW: Ripon Ln Utility Install & Asphalt Patching
25 WEST 15TH 6,260,4006,260,400DPW: W 15th Ave Reconst
143,235,30032,123,200 33,424,500 27,943,200 25,623,800 24,120,6000410 - Utility Infrastructure Total
0420 - Engineering
21 ENG VEH1 37,00037,000ENG: #389, 4-Wheel Drive 1/2-Ton Pickup Truck
24 ENG VEH1 37,00037,000ENG: #386, 4-Wheel Drive 1/2-Ton Pickup Truck
74,00037,000 37,0000420 - Engineering Total
0430 - Street Dept
21 STR VEH01 225,000225,000STR: #67, Tandem-Axle Plow Truck
21 STR VEH02 40,00040,000STR: #33, 3/4-Ton 4WD Pickup Truck
21 STR VEH04 210,000210,000STR: #140, Motor Grader
21 STR VEH05 80,00080,000STR: #122, Skid Steer and Router
21 STR VEH06 25,00025,000STR: #262, Walk-Behind Router
21 STR VEH07 44,00044,000STR: #22, 1-Ton 4WD Pickup Truck
21 STR VEH09 10,00010,000STR: #238, Single-Axle Trailer
22 STR EQP1 10,00010,000STR: #256, Rock Drill
22 STR VEH03 204,000204,000STR: #50 Single-Axle Plow Truck
22 STR VEH08 225,000225,000STR: #68, Tandem-Axle Plow Truck
22 STR VEH1 235,000235,000STR: #69, Tandem-Axle Plow Truck
22 STR VEH10 100,000100,000STR: #24, Flat Bed Truck
22 STR VEH11 100,000100,000STR: #104, Concrete Breaker
22 STR VEH2 65,00065,000STR: #244, Leaf Blower
22 STR VEH3 45,00045,000STR: #34, 1-Ton 4WD Crew Cab Pickup Truck
22 STR VEH4 204,000204,000STR: #53, Single-Axle Plow Truck
22 STR VEH5 160,000160,000STR: #106, Rubber-Tire Backhoe
22 STR VEH6 135,500135,500STR: #110, Sidewalk Tractor
Thursday, April 15, 2021Page 22021 - 2025 CIP Projects by Department
Total20212022202320242025DepartmentProject #
22 STR VEH7 225,000225,000STR: #70, Tandem-Axle Plow Truck
22 STR VEH8 100,000100,000STR: #93, Semi-Tractor
22 STR VEH9 85,00085,000STR: #239 and #246, Stainless Tanker Semi-Trailer
23 STR EQP1 30,00030,000STR: #200, Road Saw
23 STR VEH1 225,000225,000STR: #71, Tandem-Axle Plow Truck
23 STR VEH2 204,000204,000STR: #40, Single-Axle Area Plow Truck
23 STR VEH3 90,00090,000STR: #26, 1-Ton 4WD Dump Truck
23 STR VEH4 50,00050,000STR: #260, Crack Filler
23 STR VEH5 40,00040,000STR: #264, Tar Kettle Trailer Unit
23 STR VEH6 42,50042,500STR: #32, 3/4-Ton 4WD Pickup Truck
23 STR VEH7 52,00052,000STR: #163, Asphalt Roller
23 STR VEH8 295,000295,000STR: #116, Articulated Loader
23 STR VEH9 220,000220,000STR: #54 and #20, Hook Lift Trucks
24 STR EQP1 65,00065,000STR: #108, Floor Scrubber
24 STR EQP2 30,00030,000STR: #218, Trailered Air Compressor
24 STR VEH1 225,000225,000STR: #72, Tandem-Axle Dump Truck
24 STR VEH2 204,000204,000STR: #41, Single-Axle Area Plow Truck
24 STR VEH3 105,000105,000STR: #92, Semi-Tractor
24 STR VEH4 10,00010,000STR: #230, 5-Ton Tandem-Axle Trailer
24 STR VEH5 120,000120,000STR: #36, 4WD Single-Axle Truck
24 STR VEH6 215,000215,000STR: #174, Utility Tractor
24 STR VEH7 10,00010,000STR: #105, Zero-Turn Mower
25 STR VEH1 235,000235,000STR: #73, Tandem-Axle Plow Truck
25 STR VEH2 65,00065,000STR: #241, Leaf Blower
25 STR VEH3 204,000204,000STR: #44, Single-Axle Area Plow Truck
25 STR VEH4 180,000180,000STR: #172, 114" Snow Blower
25 STR VEH5 295,000295,000STR: #117, Articulated Loader
25 STR VEH6 175,000175,000STR: #168, Paver
25 STR VEH7 20,00020,000STR: #240, Tandem-Axle Equipment Trailer
25 STR VEH8 35,00035,000STR: #37, Supervisor's Pickup Truck
5,969,000634,000 1,893,500 1,248,500 984,000 1,209,0000430 - Street Dept Total
0470 - Sanitation
21 SANI VEH1 300,000300,000SAN: #218, Automated Side-Load Refuse Truck
21 SANI VEH2 300,000300,000SAN: #217, Automated Side-Load Refuse Truck
22 SANI VEH1 300,000300,000SAN: #219, Automated Side-Load Refuse Truck
22 SANI VEH2 35,00035,000SAN: #201, 4WD Supervisor's Pickup Truck
23 SANI VEH1 200,000200,000SAN: #206, Rear-Load Refuse Truck
24 SANI VEH1 200,000200,000SAN: #207, Rear-Load Refuse Truck
25 SANI VEH1 200,000200,000SAN: #212, Rear-Load Refuse Truck
1,535,000600,000 335,000 200,000 200,000 200,0000470 - Sanitation Total
0480 - Recycling
22 RECY VEH1 150,000150,000REC: #221, Hook-Lift Roll-Off Container Truck
22 RECY VEH2 55,00055,000REC: #202, 1-Ton 4WD Pickup Truck
23 RECY VEH1 300,000300,000REC: #210, Automated Side-Load Refuse Truck
24 RECY VEH1 300,000300,000REC: #209, Automated Side-Load Refuse Truck
25 RECY VEH1 250,000250,000REC: #111, Articulated Loader
1,055,000205,000 300,000 300,000 250,0000480 - Recycling Total
0610 - Park Dept -General 0100
21 PRKS BLDG 6,400,0001,500,000 3,000,000 1,900,000Parks: New Building Construction
21 PRKS VEH1 60,00060,000Parks: Replace '01 Ford Workhorse Step Van #401
21 PRKS VEH4 28,00028,000Parks: Replace '89 Topsoil Screener
Thursday, April 15, 2021Page 32021 - 2025 CIP Projects by Department
Total20212022202320242025DepartmentProject #
22 PRK VEH02 60,00060,000Parks: Replace '06 Vermeer BC 1000 XL Chipper #471
22 PRK VEH03 40,00040,000Parks: Replace '07 Ford F-250 #418
22 PRKS VEH1 50,00050,000Parks: Replace '07 Dodge Ram 3500 1 Tn #492
22 PRKS VEH2 60,00060,000Parks: Replace'12 Toro 7200 Grndmstr Zero Trn #455
22 PRKS VEH3 110,000110,000Parks: Replace '09 Ford F-450 #481
23 PRKS VEH1 30,00030,000Parks: Replace '11 John Deere Gator #499
23 PRKS VEH2 65,00065,000Parks: Replace'13 Toro 7200 Grndmstr Zero Trn #454
23 PRKS VEH3 45,00045,000Parks: Replace '08 Ford F-250 #493
23 PRKS VEH4 50,00050,000Parks: Replace '09 Chevrolet 3500 HD #486
23 PRKS VEH5 30,00030,000Parks: Replace '08 Ford Econoline Van #409
23 PRKS VEH6 40,00040,000Parks: Replace '07 Ford Ranger Ext Cab #417
23 PRKS VEH7 40,00040,000Parks: Replace '08 Ford F-350 1 Ton Truck #416
24 PRKS VEH1 65,00065,000Parks: Replace'14 Toro 7200 Grndmstr Zero Trn #456
24 PRKS VEH2 75,00075,000Parks: Replace '12 CNG Dump Truck #412
24 PRKS VEH3 30,00030,000Parks: Replace '09 Leaf Picker/Vacuum #031
25 PRKS TRLR 12,00012,000Parks: Replace Enclosed Trailer #428
25 PRKS VEH1 70,00070,000Parks: Replace'15 Toro 7200 Grndmstr Zero Trn #457
25 PRKS VEH2 23,00023,000Parks: Replace '12 Smithco Athletic Field Grmr P12
25 TRN MOWR1 15,00015,000Parks: Replace '14 Skag Zero Turn Mower #1
25 TRN MOWR2 15,00015,000Parks: Replace '14 Skag Zero Turn Mower #2
25 TRN MOWR3 15,00015,000Parks: Replace '14 Skag Zero Turn Mower #3
25 TRN MOWR4 15,00015,000Parks: Replace '14 Skag Zero Turn Mower #4
7,443,0001,588,000 3,320,000 2,200,000 170,000 165,0000610 - Park Dept -General 0100 Total
0650 - Cemetery
00A CEM RDS 75,00025,000 25,000 25,000Parks: Riverside Cemetery Roads Repaving
75,00025,000 25,000 25,0000650 - Cemetery Total
0740 - Community Development
00A BKE PED 250,00050,000 50,000 50,000 50,000 50,000CD: Bicycle and Pedestrian Infrastructure
00A BLGT RM1 2,000,000250,000 250,000 500,000 500,000 500,000CD: Blight Removal Scattered Sites
00A BLGT RM2 1,250,000250,000 250,000 250,000 250,000 250,000CD: Gateway Blight Elimination
00A G NHOODS 1,050,000175,000 175,000 200,000 250,000 250,000CD: Great Neighborhoods Initiative
00A GATE IMP 500,00050,000 50,000 100,000 100,000 200,000CD: Gateway Improvements
00A RW SIGNS 200,00025,000 25,000 50,000 50,000 50,000CD: Riverwalk Signage and Banners
21 JSC PH1 60,00060,000CD: Jackson St Corridor SftyStdy ImplementationPH1
21 MM TRL RB 585,300585,300CD: Multimodal Trail Rainbow Park
21 RW CONST1 1,100,0001,100,000CD: Riverwalk Construction S. Main St to RR Tracks
21 S MAIN AQ 1,000,000250,000 500,000 250,000CD: South Main Acquisition
22 9TH AVE 6,500,0003,000,000 3,500,000CD: 9th Avenue Extension East to Main Street
22 JSC PH2 210,000210,000CD: Jackson St Corridor SftyStdy ImplementationPH2
22 SANI DEMO 200,000200,000CD: Former Sanitation Garage Demo
14,905,3002,795,300 4,710,000 4,900,000 1,200,000 1,300,0000740 - Community Development Total
0760 - Senior Center
22 OSC FDESK 10,00010,000GS: Seniors Center (North) Front Desk Replacement
23 OSC FLOOR 30,00030,000GS: Seniors Center Flooring Replacement
40,00010,000 30,0000760 - Senior Center Total
0801 - Traffic/Lighting
00A SGNL HD 50,00010,000 10,000 10,000 10,000 10,000TR: LED Traffic Signal Head Equipment
00A ST POLES 125,00025,000 25,000 25,000 25,000 25,000TR: Purchase Streetlighting Poles
00A STR LGHT 50,00010,000 10,000 10,000 10,000 10,000TR: LED Streetlighting Upgrades
Thursday, April 15, 2021Page 42021 - 2025 CIP Projects by Department
Total20212022202320242025DepartmentProject #
00A TR SGNL 225,00045,000 45,000 45,000 45,000 45,000TR: Traffic Signal Equipment
22 TRSIGNAL1 175,000175,000TR: Traffic Signal Westhaven Dr & 9th Avenue
22 VEH ELEC1 50,00050,000TR: Electrical Supervisor Truck (repl 2008)
22 VEH ELEC3 60,00060,000TR: Electric Div Service Truck (repl 2008)
24 VEH ELEC1 200,000200,000TR: Electric Division Truck (repl 2003)
935,00090,000 375,000 90,000 290,000 90,0000801 - Traffic/Lighting Total
0810 - Sign Dept
21 VEH SIGN1 90,00090,000TR: Sign Service Truck 1 to 1 1/2 Tn (repl 2004)
90,00090,0000810 - Sign Dept Total
1020 - Grand Opera House
21 GOH SIGNS 75,00075,000GS: Grand Opera House Signage Updates
21 GOH STAGE 35,00035,000GS: Grand Opera House Stage Floor Replacement
22 GOH DIMMR 75,00075,000GS: Grand Opera House Dimmer Rack Replacement
23 GOH CH LF 40,00040,000GS: Grand Opera House Wheelchair Lift Replacement
24 GOH SEATS 100,00050,000 50,000GS: Grand Opera House Seat Replacement Program
25 GOH PLUMB 65,00065,000GS: Grand Opera House Plumbing Improvements
25 GOH PUMP 25,00025,000GS: Grand Opera House Fire Pump Controller Repl
25 GOH WALL 20,00020,000GS: Grand Opera House Wallpaper Replacement Prog
435,000110,000 75,000 40,000 50,000 160,0001020 - Grand Opera House Total
1040 - TIF Improvements
21 TIF14GRV 400,000200,000 200,000CD: TIF 14 Grove St Infrastructure
21 TIF19 SIG 20,00020,000CD: TIF19 Industrial Park Signs
21 TIF20 SS 2,000,000400,000 400,000 400,000 400,000 400,000CD: TIF20 South Shore & Sawdust Dist Redevelopment
22 TIF38RVRW 1,000,0001,000,000CD: TIF 38 Riverwalk E of RR Tracks-Pioneer Dr
22 TIF38RWLK 8,000,0002,000,000 4,000,000 2,000,000CD: TIF38 Riverwalk-Pioneer Island & Marina
23 TIF33RVR 350,000175,000 175,000CD: TIF33 Riverway Dr Trail to Riverwalk
11,770,000620,000 3,600,000 4,575,000 2,575,000 400,0001040 - TIF Improvements Total
1040C - Convention Center
21 OCC AHU 200,000200,000GS: Conv CTR Air Handler Unit (Mezzanine) Rplcmnt
23 OCC WALLS 40,00040,000GS: OCC Moveable Walls Wallpaper Replacement
240,000200,000 40,0001040C - Convention Center Total
1060 - Library
21 LIB GENER 40,60040,600LIB: Replace Emergency Electric Generator Sys
22 LIB ALARM 71,10071,100LIB: Fire Alarm System
22 LIB ELEV1 115,500115,500LIB: Elevator #1 Modernization Upgrades
23 LIB ELEV2 105,100105,100LIB: Elevator #2 Modernization Upgrades
24 LIB ELEV3 117,300117,300LIB: Elevator #3 Modernization Upgrades
449,60040,600 186,600 105,100 117,3001060 - Library Total
1070 - Museum
21 DP ROOTS 1,000,000100,000 100,000 800,000MUSM: Deep Roots, Growing City Exhibition
22 CAMERAS 85,00085,000MUSM: Replace Security Camera Systems
22 ELEVATOR 125,000125,000MUSM: Elevator Modernization
22 MASONRY 200,000200,000MUSM: Masonry Overhaul
22 PAINTING 75,00075,000MUSM: Exterior Painting
23 BLDG MODS 800,000800,000MUSM: Building Modifications
Thursday, April 15, 2021Page 52021 - 2025 CIP Projects by Department
Total20212022202320242025DepartmentProject #
23 DBL DOORS 75,00075,000MUSM: Creation of Access Doors
23 MEMORIES 300,000300,000MUSM: Memories Dreams Gallery Refurbishment
23 MUSM LOTS 600,000600,000MUSM: Parking Lot Improvements
25 LANDSCAPE 300,000300,000MUSM: Implement Landscape Plan
3,560,000100,000 585,000 2,575,000 300,0001070 - Museum Total
1717 - Parking Utility
00A PRKG LOT 2,500,000500,000 500,000 500,000 500,000 500,000TR: Parking Lot Improvements
2,500,000500,000 500,000 500,000 500,000 500,0001717 - Parking Utility Total
1728 - Transit
00A TR STPIM 50,00010,000 10,000 10,000 10,000 10,000TR: Transit Stop Improvements
21 AUT WHLCH 180,000180,000TR: Automated Wheelchair Securement Sys 12 buses
21 TR BUSES 2,600,0002,600,000TR: 2 hybrid & 2 clean diesel buses (repl 2010's)
21 TR FRKLFT 35,00035,000TR: Forklift (repl 1993 Komatsu FD 25VT-11 Diesel)
21 TRAN FARE 200,000200,000TR: Electronic Fare Readers/Farebox for Buses
21 TRANS CTR 2,320,0002,320,000TR: Downtown Transit Center
22 LAWNMOWER 20,00020,000TR: Riding Lawnmower (repl 2005 Toro Z Master)
22 TRAN VEH1 40,00040,000TR: Supervisor Pickup Truck (repl 2012)
22 TRAN VEH2 40,00040,000TR: Driver Shuttle Vehicle (repl 2011 Honda Civic)
25 2ELEC BUS 2,000,0002,000,000TR: 2 Elec Buses (repl 2013's) & 1 Charging Infras
25 TR HOIST 100,000100,000TR: Replace Go Transit Hoist in maintenance garage
7,585,0005,345,000 110,000 10,000 10,000 2,110,0001728 - Transit Total
1810 - Water
21 WD ST BDG 440,00090,000 350,000WD: Heated Storage Building
21 WD VEH1 44,00044,000WD: #830, 3/4-Ton CNG Full-Size Van
21 WF CLRWLL 22,000,00010,000,000 8,000,000 4,000,000WFP: Clearwell Replacement
21 WF M BAY 2,300,000300,000 2,000,000WFP: 36" Intake Miller's Bay Bypass
21 WF TWR FE 1,200,00075,000 1,125,000WFP: Re-Paint Fernau Water Tower and Add Mixing
21 WF TWR WS 1,100,0001,100,000WFP: Re-Paint Washburn Water Tower and Add Mixing
21 WF VEH1 50,00050,000WFP: #891, 3/4-Ton 4x4 Pickup Truck
22 WD VEH02 150,000150,000WD: New Step Service Van
22 WD VEH1 150,000150,000WD: #815, Backhoe/Front End Loader
22 WD VEH2 85,00085,000WD: #819, Mini Dump Truck
22 WF GENER 4,500,000400,000 4,100,000WFP: Replace Ozone Generators
22 WF MEDIA 2,465,00065,000 1,200,000 1,200,000WFP: Dual Media Filter Repairs/Replacements
22 WF OZONE 1,550,000130,000 1,420,000WFP: Replace Ozone Liquid Oxygen System
22 WF ROOF 225,000225,000WFP: Water Filtration Plant Membrane Roof Repl.
23 WD VEH1 49,00049,000WD: #801, 3/4-Ton CNG 4x4 Pickup Truck
23 WD VEH2 60,00060,000WD: #821, 3/4-Ton Pickup Truck
23 WF LL PMP 1,271,0001,271,000WFP: Replace Low-Lift Pumps and Related Equipment
24 WD VEH1 205,000205,000WD: #835, Replace with Tri-Axle Dump Truck
24 WF F CLNR 20,00020,000WFP: Replace Floor Cleaner
24 WF GAC FT 3,445,000300,000 3,145,000WFP: Repl Granulated Activated Carbon Filter Media
24 WF PUMP 2,135,000135,000 2,000,000WFP: Chloramine System/Repl Booster Station Pumps
25 WD VEH1 50,00050,000WD: #809, Trailer-Mounted Dewatering Pump
25 WD VEH2 40,00040,000WD: #829, 3/4-Ton Van
25 WD VEH3 85,00085,000WD: #817, Mini Dump Truck
25 WD VEH4 60,00060,000WD: #827, 3/4-Ton Pickup Truck
25 WF A SCBR 451,000451,000WFP: Ammonia Gas Scrubber
25 WF C SCBR 383,000383,000WFP: Chlorine Gas Scrubber
25 WF SCADA 20,00020,000WFP: Replace SCADA Computers
Thursday, April 15, 2021Page 62021 - 2025 CIP Projects by Department
Total20212022202320242025DepartmentProject #
44,533,00011,659,000 12,680,000 12,100,000 1,860,000 6,234,0001810 - Water Total
1910 - Sewer
21 WW ASSESS 30,00030,000WW: Assessment of WWTP Piping Condition
21 WW BR PS1 15,00015,000WW: Repl Broad St Pump Station Make-up Air Unit #1
21 WW CF SYS 555,000555,000WW: Chlorine Feed System Upgrade
21 WW CLRFRS 900,000450,000 450,000WW: Clarifiers #1, #2, #3, & #4 Floor Replacement
21 WW CONCRT 23,00023,000WW: WWTP Concrete Condition Assessment
21 WW DUMP 2,000,0002,000,000WW: Update/Relocation of Dump Site
21 WW EUSS 7,665,500890,000 2,593,500 4,182,000WW: Replace Electrical Unit Substations
21 WW LADDR 13,00013,000WW: Add Ladder Access in WWTP Pump Room
21 WW PM SYS 420,00050,000 370,000WW: Replace Polymer Mixing System
21 WW PUTERS 25,00025,000WW: Replace Computers and Related Equipment
21 WW VEH1 11,30011,300WW: #172, Zero-Turn Lawn Mower
22 ENG BOWEN 3,744,6003,744,600ENG: Bowen Street Interceptor Sewer
22 WW BR VFD 35,00035,000WW: Repl Dry Weather VFD at Broad St. Pump Station
22 WW VEH1 45,00045,000WW: #970, Pickup Truck
22 WW WTP PR 175,000175,000WW: WWTP Pump Room Repairs
23 WW BOWEN 750,000100,000 650,000WW: Bowen Street Pump Station Upgrades
23 WW CHL PP 242,00050,000 192,000WW: Replace WWTP Chlorinators and Piping
23 WW CL DIG 285,00095,000 95,000 95,000WW: Clean Digesters
23 WW EFF ST 205,000205,000WW: Replace Effluent Strainers
23 WW INSPEC 1,500,000100,000 1,400,000WW: Collection System Inspections
24 WW BAR SC 1,900,0001,900,000WW: Replace WWTP Influent Bar Screens
24 WW D HVAC 150,000150,000WW: Replace Digester Area HVAC
24 WW SHORE 230,00045,000 185,000WW: Replace Shorewood Lift Station Piping & Valves
25 WW HVAC 112,000112,000WW: Replace Wastewater Facility HVAC
25 WW S MAIN 130,000130,000WW: Repl S Main St Pump Station Generator & Equip
25 WW VEH1 9,0009,000WW: #173, Zero-Turn Lawn Mower
21,170,4004,062,300 7,368,100 4,777,000 4,432,000 531,0001910 - Sewer Total
2010 - Storm Water
21 SW VEH1 10,00010,000SW: #100, Zero-Turn Mower
22 SW VEH1 50,00050,000SW: #228, Trailered Water Pump
23 SW VEH1 295,000295,000SW: #157, Street Sweeper
25 SW VEH1 290,000290,000SW: #159, Street Sweeper
645,00010,000 50,000 295,000 290,0002010 - Storm Water Total
6610 - Park Land Imprv 0325
00 RB PRK IP 3,150,000400,000 2,750,000Parks: Rainbow Memorial Park Improvements
21 MP TRL IM 75,00075,000Parks: Menominee Park Trail Improvements/drainage
21 RW BOLRDS 25,00025,000Parks: Riverwalk Light Bollards Replacement
21 SP TEN CT 325,000325,000Parks: South Park Tennis Court Reconstruction
21 WCRL EQUP 200,000200,000Parks: Westhaven Circle Prk Play Equip & Surfacing
22 44P LGHTS 30,00030,000Parks: 44th Parallel Park Lighting Replacement
22 FGL LGHTS 30,00030,000Parks: Fugleberg Park Lighting Replacement
22 LAKESHORE 1,000,000500,000 500,000Parks: Lakeshore Park Phase 1b Development
22 M PRK ZOO 100,000100,000Parks: Menominee Park Zoo Improvements
22 ROE EQUIP 200,000200,000Parks: Roe Park Play Equipment Replacement
22 SP LGHTS 30,00030,000Parks: Stevens Park Lighting Replacement
22 WCRL LGTS 30,00030,000Parks: Westhaven Circle Park Lighting Replacement
23 44P EQUIP 200,000200,000Parks: 44th Parallel Park Play Equip & Surfacing
23 ABY EQUIP 200,000200,000Parks: Abbey Park Play Equipment & Surfacing
23 MP LOT DS 3,350,000350,000 3,000,000Parks: Menominee Prk Prkg Lot & Reetz Flds -Design
Thursday, April 15, 2021Page 72021 - 2025 CIP Projects by Department
Total20212022202320242025DepartmentProject #
23 MP RD CON 1,000,000500,000 500,000Parks: Menominee Park Road Reconstruction
23 QRY BLDG 150,000150,000Parks: Quarry Park Restroom/Shelter Building Reno
23 RB EQUIP 200,000200,000Parks: Rainbow Mem Prk Play Equipment & Surfacing
23 RUSCH DEV 200,000200,000Parks: Rusch Park Development
23 SP EQUIP 200,000200,000Parks: Stevens Park Play Equipment and Surfacing
23 STE A DEV 300,000300,000Parks: Site A Development - Ripple & Oregon
23 STE B DEV 300,000300,000Parks: Site B Development - 9th and Clairville
23 STGBR BLD 200,000200,000Parks: Stoegbauer Park Restrooms/Shelter Constr
23 TEIC TNIS 200,000200,000Parks: Teichmiller Park Tennis Court Reconstruct
24 44P TENIS 200,000200,000Parks: 44th Parallel Park Tennis Court Reconst
24 ABE EQUIP 200,000200,000Parks: Abe Rochlin Park Play Equipment & Surfacing
24 SP TENNIS 100,000100,000Parks: Stevens Park Tennis Court Reconstruction
24 W ALG EQP 200,000200,000Parks: West Algoma Park Play Equipment & Surfacing
24 WHCRL TNS 200,000200,000Parks: Westhaven Circle Prk Tennis Crt Reconstuct
25 ARW EQUIP 200,000200,000Parks: Red Arrow Park Play Equipment
25 ARW LGHTS 40,00040,000Parks: Red Arrow Park Lighting Replacement
25 MP LIGHTS 50,00050,000Parks: Menominee Park Lighting Replacement
25 MP TC LTS 150,000150,000Parks: Menominee Park Tennis Court Lights
25 QURY DOG 100,000100,000Parks: Quarry Park Dog Park Development
25 WHCRL PAD 400,000400,000Parks: Westhaven Circle Park - Splash Pad
13,535,000625,000 890,000 3,530,000 4,800,000 3,690,0006610 - Park Land Imprv 0325 Total
GRAND TOTAL 291,096,73262,358,900 72,238,370 70,619,720 43,731,684 42,148,058
Thursday, April 15, 2021Page 82021 - 2025 CIP Projects by Department
CIP Projects by Funding Source
City of Oshkosh, Wisconsin
PROJECTS BY FUNDING SOURCE
2021 2025thru
TotalSourceProject #2021 2022 2023 2024 2025
1000-Operations
21 DP ROOTS 1,000,000100,000 100,000 800,000MUSM: Deep Roots, Growing City Exhibition
22 RECY VEH1 140,000140,000REC: #221, Hook-Lift Roll-Off Container Truck
22 RECY VEH2 52,00052,000REC: #202, 1-Ton 4WD Pickup Truck
23 RECY VEH1 275,000275,000REC: #210, Automated Side-Load Refuse Truck
24 RECY VEH1 290,000290,000REC: #209, Automated Side-Load Refuse Truck
25 RECY VEH1 230,000230,000REC: #111, Articulated Loader
1,987,000100,000 292,000 1,075,000 290,000 230,0001000-Operations Total
1300-Cash - Fund Balance
00 RB PRK IP 200,000200,000Parks: Rainbow Memorial Park Improvements
23 MP LOT DS 200,000200,000Parks: Menominee Prk Prkg Lot & Reetz Flds -Design
400,000200,000 200,0001300-Cash - Fund Balance Total
1400-TID Cash
21 TIF20 SS 2,000,000400,000 400,000 400,000 400,000 400,000CD: TIF20 South Shore & Sawdust Dist Redevelopment
2,000,000400,000 400,000 400,000 400,000 400,0001400-TID Cash Total
1414-TID #14 Cash
21 TIF14GRV 400,000200,000 200,000CD: TIF 14 Grove St Infrastructure
400,000200,000 200,0001414-TID #14 Cash Total
1419-TID #19 Cash
21 TIF19 SIG 20,00020,000CD: TIF19 Industrial Park Signs
20,00020,0001419-TID #19 Cash Total
1510-Transit Fund
00A TR STPIM 50,00010,000 10,000 10,000 10,000 10,000TR: Transit Stop Improvements
50,00010,000 10,000 10,000 10,000 10,0001510-Transit Fund Total
1540-Water Utility Fund
21 WD VEH1 42,00042,000WD: #830, 3/4-Ton CNG Full-Size Van
21 WF TWR FE 1,200,00075,000 1,125,000WFP: Re-Paint Fernau Water Tower and Add Mixing
21 WF TWR WS 1,100,0001,100,000WFP: Re-Paint Washburn Water Tower and Add Mixing
21 WF VEH1 47,00047,000WFP: #891, 3/4-Ton 4x4 Pickup Truck
21-90 CONCRT 75,00015,000 15,000 15,000 15,000 15,000ENG: Concrete Pavement Repairs (Annual)
21-91 ENVIR 250,00050,000 50,000 50,000 50,000 50,000ENG:20-91 Up-Front Engineering Services
Wednesday, April 21, 2021Page 12021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
21-93 LEAD 500,000100,000 100,000 100,000 100,000 100,000ENG: Misc. Utility-Owned Lead Service Repl.
22 WD VEH02 150,000150,000WD: New Step Service Van
22 WF MEDIA 65,00065,000WFP: Dual Media Filter Repairs/Replacements
3,429,0001,429,000 1,505,000 165,000 165,000 165,0001540-Water Utility Fund Total
1550-Sewer Utility Fund
21 WW ASSESS 30,00030,000WW: Assessment of WWTP Piping Condition
21 WW BR PS1 15,00015,000WW: Repl Broad St Pump Station Make-up Air Unit #1
21 WW CONCRT 23,00023,000WW: WWTP Concrete Condition Assessment
21 WW LADDR 13,00013,000WW: Add Ladder Access in WWTP Pump Room
21 WW PUTERS 25,00025,000WW: Replace Computers and Related Equipment
21-11 LEAKS 2,500,000500,000 500,000 500,000 500,000 500,000ENG: Inflow/Infiltration Removal
21-90 CONCRT 95,00015,000 20,000 20,000 20,000 20,000ENG: Concrete Pavement Repairs (Annual)
21-91 ENVIR 975,000195,000 195,000 195,000 195,000 195,000ENG:20-91 Up-Front Engineering Services
23 WW CL DIG 285,00095,000 95,000 95,000WW: Clean Digesters
25 WW VEH1 8,1508,150WW: #173, Zero-Turn Lawn Mower
3,969,150816,000 715,000 810,000 810,000 818,1501550-Sewer Utility Fund Total
1560-Storm Water Utility Fund
21-20 STRLAT 3,125,000625,000 625,000 625,000 625,000 625,000ENG: Mini Storm Sewers/Storm Laterals
21-90 CONCRT 375,00075,000 75,000 75,000 75,000 75,000ENG: Concrete Pavement Repairs (Annual)
21-91 ENVIR 450,00090,000 90,000 90,000 90,000 90,000ENG:20-91 Up-Front Engineering Services
23 ENG FRNAU 350,000350,000ENG: Fernau Watershed Detention Basin (Hoffmaster)
4,300,000790,000 790,000 790,000 1,140,000 790,0001560-Storm Water Utility Fund Total
2000-Trade-In
21 ENG VEH1 500500ENG: #389, 4-Wheel Drive 1/2-Ton Pickup Truck
21 FIRE VEH2 500500FIRE: Replacement of '99 Chevrolet Suburban
21 PRKS VEH1 2,5002,500Parks: Replace '01 Ford Workhorse Step Van #401
21 PRKS VEH4 500500Parks: Replace '89 Topsoil Screener
21 SANI VEH1 10,00010,000SAN: #218, Automated Side-Load Refuse Truck
21 SANI VEH2 10,00010,000SAN: #217, Automated Side-Load Refuse Truck
21 STR VEH01 15,00015,000STR: #67, Tandem-Axle Plow Truck
21 STR VEH02 2,5002,500STR: #33, 3/4-Ton 4WD Pickup Truck
21 STR VEH04 15,00015,000STR: #140, Motor Grader
21 STR VEH05 7,0007,000STR: #122, Skid Steer and Router
21 STR VEH06 500500STR: #262, Walk-Behind Router
21 STR VEH07 2,5002,500STR: #22, 1-Ton 4WD Pickup Truck
21 WD VEH1 2,0002,000WD: #830, 3/4-Ton CNG Full-Size Van
21 WF VEH1 3,0003,000WFP: #891, 3/4-Ton 4x4 Pickup Truck
21 WW VEH1 1,5001,500WW: #172, Zero-Turn Lawn Mower
22 PRK VEH02 2,0002,000Parks: Replace '06 Vermeer BC 1000 XL Chipper #471
22 PRK VEH03 3,0003,000Parks: Replace '07 Ford F-250 #418
22 PRKS VEH1 1,0001,000Parks: Replace '07 Dodge Ram 3500 1 Tn #492
22 PRKS VEH2 3,5003,500Parks: Replace'12 Toro 7200 Grndmstr Zero Trn #455
22 PRKS VEH3 1,0001,000Parks: Replace '09 Ford F-450 #481
22 RECY VEH1 10,00010,000REC: #221, Hook-Lift Roll-Off Container Truck
22 RECY VEH2 3,0003,000REC: #202, 1-Ton 4WD Pickup Truck
22 SANI VEH1 10,00010,000SAN: #219, Automated Side-Load Refuse Truck
22 SANI VEH2 1,0001,000SAN: #201, 4WD Supervisor's Pickup Truck
22 STR VEH03 15,00015,000STR: #50 Single-Axle Plow Truck
Wednesday, April 21, 2021Page 22021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
22 STR VEH08 15,00015,000STR: #68, Tandem-Axle Plow Truck
22 STR VEH1 15,00015,000STR: #69, Tandem-Axle Plow Truck
22 STR VEH10 5,0005,000STR: #24, Flat Bed Truck
22 STR VEH11 5,0005,000STR: #104, Concrete Breaker
22 STR VEH3 2,5002,500STR: #34, 1-Ton 4WD Crew Cab Pickup Truck
22 STR VEH4 15,00015,000STR: #53, Single-Axle Plow Truck
22 STR VEH5 15,00015,000STR: #106, Rubber-Tire Backhoe
22 STR VEH6 5,0005,000STR: #110, Sidewalk Tractor
22 STR VEH7 15,00015,000STR: #70, Tandem-Axle Plow Truck
22 STR VEH8 5,0005,000STR: #93, Semi-Tractor
22 STR VEH9 5,0005,000STR: #239 and #246, Stainless Tanker Semi-Trailer
22 SW VEH1 1,0001,000SW: #228, Trailered Water Pump
22 WD VEH1 15,00015,000WD: #815, Backhoe/Front End Loader
22 WD VEH2 7,0007,000WD: #819, Mini Dump Truck
22 WW VEH1 4,0004,000WW: #970, Pickup Truck
23 FAC VEH1 500500GS: 3/4 Ton Van (repl #003 '97 GMC)
23 PRKS VEH1 500500Parks: Replace '11 John Deere Gator #499
23 PRKS VEH2 3,5003,500Parks: Replace'13 Toro 7200 Grndmstr Zero Trn #454
23 PRKS VEH3 1,0001,000Parks: Replace '08 Ford F-250 #493
23 PRKS VEH4 1,0001,000Parks: Replace '09 Chevrolet 3500 HD #486
23 PRKS VEH5 1,0001,000Parks: Replace '08 Ford Econoline Van #409
23 PRKS VEH6 500500Parks: Replace '07 Ford Ranger Ext Cab #417
23 PRKS VEH7 1,5001,500Parks: Replace '08 Ford F-350 1 Ton Truck #416
23 RECY VEH1 25,00025,000REC: #210, Automated Side-Load Refuse Truck
23 SANI VEH1 10,00010,000SAN: #206, Rear-Load Refuse Truck
23 STR EQP1 500500STR: #200, Road Saw
23 STR VEH1 15,00015,000STR: #71, Tandem-Axle Plow Truck
23 STR VEH2 15,00015,000STR: #40, Single-Axle Area Plow Truck
23 STR VEH3 5,0005,000STR: #26, 1-Ton 4WD Dump Truck
23 STR VEH4 5,0005,000STR: #260, Crack Filler
23 STR VEH5 1,0001,000STR: #264, Tar Kettle Trailer Unit
23 STR VEH6 2,5002,500STR: #32, 3/4-Ton 4WD Pickup Truck
23 STR VEH7 1,0001,000STR: #163, Asphalt Roller
23 STR VEH8 20,00020,000STR: #116, Articulated Loader
23 STR VEH9 5,0005,000STR: #54 and #20, Hook Lift Trucks
23 SW VEH1 5,0005,000SW: #157, Street Sweeper
23 WD VEH1 3,0003,000WD: #801, 3/4-Ton CNG 4x4 Pickup Truck
23 WD VEH2 3,0003,000WD: #821, 3/4-Ton Pickup Truck
24 ENG VEH1 500500ENG: #386, 4-Wheel Drive 1/2-Ton Pickup Truck
24 PRKS VEH1 3,5003,500Parks: Replace'14 Toro 7200 Grndmstr Zero Trn #456
24 PRKS VEH2 6,0006,000Parks: Replace '12 CNG Dump Truck #412
24 PRKS VEH3 500500Parks: Replace '09 Leaf Picker/Vacuum #031
24 RECY VEH1 10,00010,000REC: #209, Automated Side-Load Refuse Truck
24 SANI VEH1 10,00010,000SAN: #207, Rear-Load Refuse Truck
24 STR EQP1 5,0005,000STR: #108, Floor Scrubber
24 STR VEH1 15,00015,000STR: #72, Tandem-Axle Dump Truck
24 STR VEH2 15,00015,000STR: #41, Single-Axle Area Plow Truck
24 STR VEH3 5,0005,000STR: #92, Semi-Tractor
24 STR VEH5 10,00010,000STR: #36, 4WD Single-Axle Truck
24 STR VEH6 10,00010,000STR: #174, Utility Tractor
24 WD VEH1 15,00015,000WD: #835, Replace with Tri-Axle Dump Truck
25 FAC VEH1 1,0001,000GS: 3/4 Ton Pickup (repl #002 '08 Ford)
25 PRKS TRLR 1,0001,000Parks: Replace Enclosed Trailer #428
25 PRKS VEH1 3,5003,500Parks: Replace'15 Toro 7200 Grndmstr Zero Trn #457
25 PRKS VEH2 500500Parks: Replace '12 Smithco Athletic Field Grmr P12
Wednesday, April 21, 2021Page 32021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
25 RECY VEH1 20,00020,000REC: #111, Articulated Loader
25 SANI VEH1 10,00010,000SAN: #212, Rear-Load Refuse Truck
25 STR VEH1 15,00015,000STR: #73, Tandem-Axle Plow Truck
25 STR VEH3 15,00015,000STR: #44, Single-Axle Area Plow Truck
25 STR VEH4 5,0005,000STR: #172, 114" Snow Blower
25 STR VEH5 20,00020,000STR: #117, Articulated Loader
25 STR VEH6 10,00010,000STR: #168, Paver
25 STR VEH7 1,0001,000STR: #240, Tandem-Axle Equipment Trailer
25 STR VEH8 2,5002,500STR: #37, Supervisor's Pickup Truck
25 SW VEH1 10,00010,000SW: #159, Street Sweeper
25 TRN MOWR1 500500Parks: Replace '14 Skag Zero Turn Mower #1
25 TRN MOWR2 500500Parks: Replace '14 Skag Zero Turn Mower #2
25 TRN MOWR3 500500Parks: Replace '14 Skag Zero Turn Mower #3
25 TRN MOWR4 500500Parks: Replace '14 Skag Zero Turn Mower #4
25 WD VEH1 5,0005,000WD: #809, Trailer-Mounted Dewatering Pump
25 WD VEH2 2,0002,000WD: #829, 3/4-Ton Van
25 WD VEH3 7,0007,000WD: #817, Mini Dump Truck
25 WD VEH4 3,0003,000WD: #827, 3/4-Ton Pickup Truck
25 WW VEH1 850850WW: #173, Zero-Turn Lawn Mower
617,35073,000 175,000 129,500 105,500 134,3502000-Trade-In Total
3000-Prior Year Funding
21 OCC AHU 200,000200,000GS: Conv CTR Air Handler Unit (Mezzanine) Rplcmnt
21 TR BUSES 209,139209,139TR: 2 hybrid & 2 clean diesel buses (repl 2010's)
21 TRAN FARE 40,00040,000TR: Electronic Fare Readers/Farebox for Buses
22 TRAN VEH2 8,0008,000TR: Driver Shuttle Vehicle (repl 2011 Honda Civic)
23 OCC WALLS 40,00040,000GS: OCC Moveable Walls Wallpaper Replacement
497,139449,139 8,000 40,0003000-Prior Year Funding Total
4100-Levy
00 PRKG LT18 127,20083,600 43,600FIRE: Parking Lot Program Station 18
00A BKE PED 250,00050,000 50,000 50,000 50,000 50,000CD: Bicycle and Pedestrian Infrastructure
00A BLGT RM1 2,000,000250,000 250,000 500,000 500,000 500,000CD: Blight Removal Scattered Sites
00A CEM RDS 75,00025,000 25,000 25,000Parks: Riverside Cemetery Roads Repaving
00A FURN RPL 50,00010,000 10,000 10,000 10,000 10,000GS: Office Furniture Replacement
00A G NHOODS 1,050,000175,000 175,000 200,000 250,000 250,000CD: Great Neighborhoods Initiative
00A GATE IMP 500,00050,000 50,000 100,000 100,000 200,000CD: Gateway Improvements
00A RW SIGNS 200,00025,000 25,000 50,000 50,000 50,000CD: Riverwalk Signage and Banners
00A SGNL HD 50,00010,000 10,000 10,000 10,000 10,000TR: LED Traffic Signal Head Equipment
00A ST POLES 125,00025,000 25,000 25,000 25,000 25,000TR: Purchase Streetlighting Poles
00A STR LGHT 50,00010,000 10,000 10,000 10,000 10,000TR: LED Streetlighting Upgrades
00A TR SGNL 225,00045,000 45,000 45,000 45,000 45,000TR: Traffic Signal Equipment
21 ADA AUDIT 60,00060,000GS: Complete ADA Audit of all City buildings
21 FIRE BTS 49,50049,500FIRE: Turn Out Gear Boots
21 FIRE GEAR 109,22540,000 32,100 12,800 24,325FIRE: Turn Out Gear Pants & Coats
21 FIRE HELM 29,8575,000 1,740 4,659 18,458FIRE: Turn Out Gear Helmets
21 GOH STAGE 25,00025,000GS: Grand Opera House Stage Floor Replacement
21 RW BOLRDS 25,00025,000Parks: Riverwalk Light Bollards Replacement
21 STR VEH09 10,00010,000STR: #238, Single-Axle Trailer
21-06B NWSID 25,0005,000 5,000 5,000 5,000 5,000SDWK: New Walk Ordered In
21-06CSUBSID 12,5002,500 2,500 2,500 2,500 2,500SDWK: Subdivision Agreements
21-20 STRLAT 125,00025,000 25,000 25,000 25,000 25,000ENG: Mini Storm Sewers/Storm Laterals
Wednesday, April 21, 2021Page 42021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
21-90 CONCRT 678,000128,000 125,000 175,000 125,000 125,000ENG: Concrete Pavement Repairs (Annual)
21-91 ENVIR 150,00030,000 30,000 30,000 30,000 30,000ENG:20-91 Up-Front Engineering Services
22 CTYHALSEC 75,00075,000GS: City Hall Security Improvements
22 GEN ST16 60,00060,000FIRE: Replace Generator Station 16
22 GOH DIMMR 75,00075,000GS: Grand Opera House Dimmer Rack Replacement
22 HOSE REPL 66,57066,570FIRE: New Hose to Replace Obsolete Hose
22 OSC FDESK 10,00010,000GS: Seniors Center (North) Front Desk Replacement
22 PRK VEH02 58,00058,000Parks: Replace '06 Vermeer BC 1000 XL Chipper #471
22 SB ELEVS 250,000250,000GS: Safety Building Elevator 1-2 Modernizations
23 CTYHAL2ND 20,00020,000GS: City Hall 2nd Floor Hallway Tile Replacement
23 FAC VEH1 34,50034,500GS: 3/4 Ton Van (repl #003 '97 GMC)
23 FIRE VEH1 47,00047,000FIRE: Replace '98 Chevy 3500
23 GOH CH LF 40,00040,000GS: Grand Opera House Wheelchair Lift Replacement
23 OSC FLOOR 30,00030,000GS: Seniors Center Flooring Replacement
23 TIF33RVR 350,000175,000 175,000CD: TIF33 Riverway Dr Trail to Riverwalk
24 GOH SEATS 100,00050,000 50,000GS: Grand Opera House Seat Replacement Program
25 FAC VEH1 44,00044,000GS: 3/4 Ton Pickup (repl #002 '08 Ford)
25 GOH PLUMB 65,00065,000GS: Grand Opera House Plumbing Improvements
25 GOH PUMP 25,00025,000GS: Grand Opera House Fire Pump Controller Repl
25 GOH WALL 20,00020,000GS: Grand Opera House Wallpaper Replacement Prog
7,371,3521,080,000 1,464,170 1,707,140 1,535,084 1,584,9584100-Levy Total
4260-Grant
21 AUT WHLCH 180,000180,000TR: Automated Wheelchair Securement Sys 12 buses
21 MM TRL RB 255,300255,300CD: Multimodal Trail Rainbow Park
21 RW CONST1 500,000500,000CD: Riverwalk Construction S. Main St to RR Tracks
21 TR BUSES 834,800834,800TR: 2 hybrid & 2 clean diesel buses (repl 2010's)
21 TR FRKLFT 35,00035,000TR: Forklift (repl 1993 Komatsu FD 25VT-11 Diesel)
21 TRAN FARE 160,000160,000TR: Electronic Fare Readers/Farebox for Buses
21 TRANS CTR 520,000520,000TR: Downtown Transit Center
22 LAWNMOWER 20,00020,000TR: Riding Lawnmower (repl 2005 Toro Z Master)
22 TIF38RVRW 500,000500,000CD: TIF 38 Riverwalk E of RR Tracks-Pioneer Dr
22 TIF38RWLK 2,400,000800,000 800,000 800,000CD: TIF38 Riverwalk-Pioneer Island & Marina
22 TRAN VEH1 32,00032,000TR: Supervisor Pickup Truck (repl 2012)
22 TRAN VEH2 32,00032,000TR: Driver Shuttle Vehicle (repl 2011 Honda Civic)
25 2ELEC BUS 1,800,0001,800,000TR: 2 Elec Buses (repl 2013's) & 1 Charging Infras
25 TR HOIST 80,00080,000TR: Replace Go Transit Hoist in maintenance garage
7,349,1002,485,100 1,384,000 800,000 800,000 1,880,0004260-Grant Total
4261-Federal Grant
21 TR BUSES 1,500,0001,500,000TR: 2 hybrid & 2 clean diesel buses (repl 2010's)
21 TRANS CTR 1,800,0001,800,000TR: Downtown Transit Center
3,300,0003,300,0004261-Federal Grant Total
4317-Assessment
21-01 OMRO 268,600268,600DPW: Omro Road Reconstruction
21-03 FDL SS 23,00023,000ENG: Fond du Lac Sanitary Sewer
21-04 W 9TH 993,500993,500DPW: West 9th Avenue Reconstruction
21-05 CEAPE 956,800956,800DPW: Ceape Avenue Reconstruction
21-06A REHAB 2,940,000588,000 588,000 588,000 588,000 588,000SDWK: Rehabilitation & Reconstruction Program
21-06B NWSID 325,00065,000 65,000 65,000 65,000 65,000SDWK: New Walk Ordered In
Wednesday, April 21, 2021Page 52021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
21-06CSUBSID 137,50027,500 27,500 27,500 27,500 27,500SDWK: Subdivision Agreements
21-12 BRADLY 333,400333,400ENG: Bradley Street Asphalt Paving
21-20 STRLAT 125,00025,000 25,000 25,000 25,000 25,000ENG: Mini Storm Sewers/Storm Laterals
22 ALGOMA 1,520,7001,520,700DPW: Algoma Boulevard Reconstruction
22 E LINCOLN 572,100572,100DPW: East Lincoln Avenue Reconstruction
22 GRAND ST 339,400339,400DPW: Grand Street Reconstruction
22 ROSALIA 209,500209,500DPW: Rosalia St WtrMn RPLCMT/Asphalt Paving
23 ASPHALT 450,000150,000 150,000 150,000ENG: Asphalt Program (Annual)
23 MCKINLEY 139,800139,800DPW: McKinley St Reconst
23 S MAIN 1,621,5001,621,500DPW: S Main St Reconstruction
23 STRING 39,00039,000ENG: Stringham Watershed Box Culvert-Phase 2
23 W LINCOLN 529,300529,300DPW: W Lincoln Ave Reconst
24 CENTRAL 540,000540,000DPW: Central St Reconst
24 CHERRY 768,900768,900DPW: Cherry St Reconst
24 MILL ST 156,500156,500DPW: Mill St Reconst
24 WAUGOO 967,300967,300DPW: Waugoo Ave Reconst
25 ARTHUR 387,400387,400DPW: Arthur Ave Reconst
25 BAY SHORE 393,000393,000DPW: Bay Shore Dr Reconst
25 BOWEN ST 392,100392,100DPW: Bowen St Reconst
25 RIPON LN 186,800186,800DPW: Ripon Ln Utility Install & Asphalt Patching
25 WEST 15TH 1,003,1001,003,100DPW: W 15th Ave Reconst
16,319,2002,947,400 3,680,600 3,146,100 3,327,200 3,217,9004317-Assessment Total
4401-Debt
00 RB PRK IP 2,950,000400,000 2,550,000Parks: Rainbow Memorial Park Improvements
00A HVAC/RF 2,500,000500,000 500,000 500,000 500,000 500,000GS: HVAC/Roofing Replacement Program
00A PRKG LOT 2,500,000500,000 500,000 500,000 500,000 500,000TR: Parking Lot Improvements
21 ENG VEH1 36,50036,500ENG: #389, 4-Wheel Drive 1/2-Ton Pickup Truck
21 FIRE VEH1 44,30044,300FIRE: Replace '94 Ford Expl with 1 Ton pickup
21 FIRE VEH2 45,20045,200FIRE: Replacement of '99 Chevrolet Suburban
21 JSC PH1 60,00060,000CD: Jackson St Corridor SftyStdy ImplementationPH1
21 LIB GENER 40,60040,600LIB: Replace Emergency Electric Generator Sys
21 MM TRL RB 330,000330,000CD: Multimodal Trail Rainbow Park
21 MP TRL IM 75,00075,000Parks: Menominee Park Trail Improvements/drainage
21 PD RENO 150,000150,000POLC: Renovations to Vacant Ofc Space North End
21 PD SWT TR 200,000200,000POLC: SWAT Team Truck Replacement
21 PRKS BLDG 6,400,0001,500,000 3,000,000 1,900,000Parks: New Building Construction
21 PRKS VEH1 57,50057,500Parks: Replace '01 Ford Workhorse Step Van #401
21 PRKS VEH4 27,50027,500Parks: Replace '89 Topsoil Screener
21 RW CONST1 600,000600,000CD: Riverwalk Construction S. Main St to RR Tracks
21 S MAIN AQ 1,000,000250,000 500,000 250,000CD: South Main Acquisition
21 SP TEN CT 325,000325,000Parks: South Park Tennis Court Reconstruction
21 STR VEH01 210,000210,000STR: #67, Tandem-Axle Plow Truck
21 STR VEH02 37,50037,500STR: #33, 3/4-Ton 4WD Pickup Truck
21 STR VEH04 195,000195,000STR: #140, Motor Grader
21 STR VEH05 73,00073,000STR: #122, Skid Steer and Router
21 STR VEH06 24,50024,500STR: #262, Walk-Behind Router
21 STR VEH07 41,50041,500STR: #22, 1-Ton 4WD Pickup Truck
21 TR BUSES 56,06156,061TR: 2 hybrid & 2 clean diesel buses (repl 2010's)
21 VEH SIGN1 90,00090,000TR: Sign Service Truck 1 to 1 1/2 Tn (repl 2004)
21 WCRL EQUP 200,000200,000Parks: Westhaven Circle Prk Play Equip & Surfacing
21-01 OMRO 31,40031,400DPW: Omro Road Reconstruction
21-03 OREGON 250,000250,000DPW: Oregon Street Interceptor Sewer
21-04 W 9TH 3,028,2003,028,200DPW: West 9th Avenue Reconstruction
Wednesday, April 21, 2021Page 62021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
21-05 CEAPE 1,530,4001,530,400DPW: Ceape Avenue Reconstruction
21-06A REHAB 1,500,000300,000 300,000 300,000 300,000 300,000SDWK: Rehabilitation & Reconstruction Program
21-12 BRADLY 226,000226,000ENG: Bradley Street Asphalt Paving
22 44P LGHTS 30,00030,000Parks: 44th Parallel Park Lighting Replacement
22 9TH AVE 6,500,0003,000,000 3,500,000CD: 9th Avenue Extension East to Main Street
22 ALGOMA 3,383,9003,383,900DPW: Algoma Boulevard Reconstruction
22 CAMERAS 85,00085,000MUSM: Replace Security Camera Systems
22 E LINCOLN 830,000830,000DPW: East Lincoln Avenue Reconstruction
22 ELEVATOR 125,000125,000MUSM: Elevator Modernization
22 FGL LGHTS 30,00030,000Parks: Fugleberg Park Lighting Replacement
22 FIRE VEH2 927,000927,000FIRE: Replace 3 Ambulances from '12
22 GRAND ST 572,700572,700DPW: Grand Street Reconstruction
22 JSC PH2 210,000210,000CD: Jackson St Corridor SftyStdy ImplementationPH2
22 LAKESHORE 1,000,000500,000 500,000Parks: Lakeshore Park Phase 1b Development
22 LIB ALARM 71,10071,100LIB: Fire Alarm System
22 LIB ELEV1 115,500115,500LIB: Elevator #1 Modernization Upgrades
22 M PRK ZOO 100,000100,000Parks: Menominee Park Zoo Improvements
22 MASONRY 200,000200,000MUSM: Masonry Overhaul
22 PAINTING 75,00075,000MUSM: Exterior Painting
22 PRK VEH03 37,00037,000Parks: Replace '07 Ford F-250 #418
22 PRKS VEH1 49,00049,000Parks: Replace '07 Dodge Ram 3500 1 Tn #492
22 PRKS VEH2 56,50056,500Parks: Replace'12 Toro 7200 Grndmstr Zero Trn #455
22 PRKS VEH3 109,000109,000Parks: Replace '09 Ford F-450 #481
22 ROE EQUIP 200,000200,000Parks: Roe Park Play Equipment Replacement
22 ROSALIA 761,400761,400DPW: Rosalia St WtrMn RPLCMT/Asphalt Paving
22 SANI DEMO 200,000200,000CD: Former Sanitation Garage Demo
22 SANI VEH2 34,00034,000SAN: #201, 4WD Supervisor's Pickup Truck
22 SP LGHTS 30,00030,000Parks: Stevens Park Lighting Replacement
22 STR EQP1 10,00010,000STR: #256, Rock Drill
22 STR VEH03 189,000189,000STR: #50 Single-Axle Plow Truck
22 STR VEH08 210,000210,000STR: #68, Tandem-Axle Plow Truck
22 STR VEH1 220,000220,000STR: #69, Tandem-Axle Plow Truck
22 STR VEH10 95,00095,000STR: #24, Flat Bed Truck
22 STR VEH11 95,00095,000STR: #104, Concrete Breaker
22 STR VEH2 65,00065,000STR: #244, Leaf Blower
22 STR VEH3 42,50042,500STR: #34, 1-Ton 4WD Crew Cab Pickup Truck
22 STR VEH4 189,000189,000STR: #53, Single-Axle Plow Truck
22 STR VEH5 145,000145,000STR: #106, Rubber-Tire Backhoe
22 STR VEH6 130,500130,500STR: #110, Sidewalk Tractor
22 STR VEH7 210,000210,000STR: #70, Tandem-Axle Plow Truck
22 STR VEH8 95,00095,000STR: #93, Semi-Tractor
22 STR VEH9 80,00080,000STR: #239 and #246, Stainless Tanker Semi-Trailer
22 TIF38RVRW 500,000500,000CD: TIF 38 Riverwalk E of RR Tracks-Pioneer Dr
22 TIF38RWLK 5,600,0001,200,000 3,200,000 1,200,000CD: TIF38 Riverwalk-Pioneer Island & Marina
22 TRAN VEH1 8,0008,000TR: Supervisor Pickup Truck (repl 2012)
22 TRSIGNAL1 175,000175,000TR: Traffic Signal Westhaven Dr & 9th Avenue
22 VEH ELEC1 50,00050,000TR: Electrical Supervisor Truck (repl 2008)
22 VEH ELEC3 60,00060,000TR: Electric Div Service Truck (repl 2008)
22 W 9TH IMP 850,000300,000 550,000ENG: West 9th Ave Gateway Corridor Improvements
22 WCRL LGTS 30,00030,000Parks: Westhaven Circle Park Lighting Replacement
23 44P EQUIP 200,000200,000Parks: 44th Parallel Park Play Equip & Surfacing
23 ABY EQUIP 200,000200,000Parks: Abbey Park Play Equipment & Surfacing
23 ASPHALT 450,000150,000 150,000 150,000ENG: Asphalt Program (Annual)
23 BLDG MODS 800,000800,000MUSM: Building Modifications
23 DBL DOORS 75,00075,000MUSM: Creation of Access Doors
Wednesday, April 21, 2021Page 72021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
23 FIRE ENG1 627,000627,000FIRE: Replace '06 Fire Engine
23 LIB ELEV2 105,100105,100LIB: Elevator #2 Modernization Upgrades
23 MCKINLEY 249,100249,100DPW: McKinley St Reconst
23 MEMORIES 300,000300,000MUSM: Memories Dreams Gallery Refurbishment
23 MOCKBIRD 90,00090,000ENG: Mockingbird Way Traffic Calming
23 MP LOT DS 3,150,000350,000 2,800,000Parks: Menominee Prk Prkg Lot & Reetz Flds -Design
23 MP RD CON 1,000,000500,000 500,000Parks: Menominee Park Road Reconstruction
23 MUSM LOTS 600,000600,000MUSM: Parking Lot Improvements
23 PRKS VEH1 29,50029,500Parks: Replace '11 John Deere Gator #499
23 PRKS VEH2 61,50061,500Parks: Replace'13 Toro 7200 Grndmstr Zero Trn #454
23 PRKS VEH3 44,00044,000Parks: Replace '08 Ford F-250 #493
23 PRKS VEH4 49,00049,000Parks: Replace '09 Chevrolet 3500 HD #486
23 PRKS VEH5 29,00029,000Parks: Replace '08 Ford Econoline Van #409
23 PRKS VEH6 39,50039,500Parks: Replace '07 Ford Ranger Ext Cab #417
23 PRKS VEH7 38,50038,500Parks: Replace '08 Ford F-350 1 Ton Truck #416
23 QRY BLDG 150,000150,000Parks: Quarry Park Restroom/Shelter Building Reno
23 RB EQUIP 200,000200,000Parks: Rainbow Mem Prk Play Equipment & Surfacing
23 RUSCH DEV 200,000200,000Parks: Rusch Park Development
23 S MAIN 2,967,0002,967,000DPW: S Main St Reconstruction
23 SANI VEH1 190,000190,000SAN: #206, Rear-Load Refuse Truck
23 SP EQUIP 200,000200,000Parks: Stevens Park Play Equipment and Surfacing
23 STE A DEV 300,000300,000Parks: Site A Development - Ripple & Oregon
23 STE B DEV 300,000300,000Parks: Site B Development - 9th and Clairville
23 STGBR BLD 200,000200,000Parks: Stoegbauer Park Restrooms/Shelter Constr
23 STR EQP1 29,50029,500STR: #200, Road Saw
23 STR VEH1 210,000210,000STR: #71, Tandem-Axle Plow Truck
23 STR VEH2 189,000189,000STR: #40, Single-Axle Area Plow Truck
23 STR VEH3 85,00085,000STR: #26, 1-Ton 4WD Dump Truck
23 STR VEH4 45,00045,000STR: #260, Crack Filler
23 STR VEH5 39,00039,000STR: #264, Tar Kettle Trailer Unit
23 STR VEH6 40,00040,000STR: #32, 3/4-Ton 4WD Pickup Truck
23 STR VEH7 51,00051,000STR: #163, Asphalt Roller
23 STR VEH8 275,000275,000STR: #116, Articulated Loader
23 STR VEH9 215,000215,000STR: #54 and #20, Hook Lift Trucks
23 TEIC TNIS 200,000200,000Parks: Teichmiller Park Tennis Court Reconstruct
23 TRNG CTR 3,798,7803,798,780FIRE: Fire Training Center
23 W LINCOLN 1,053,3001,053,300DPW: W Lincoln Ave Reconst
24 44P TENIS 200,000200,000Parks: 44th Parallel Park Tennis Court Reconst
24 ABE EQUIP 200,000200,000Parks: Abe Rochlin Park Play Equipment & Surfacing
24 CENTRAL 1,033,0001,033,000DPW: Central St Reconst
24 CHERRY 1,197,4001,197,400DPW: Cherry St Reconst
24 ENG VEH1 36,50036,500ENG: #386, 4-Wheel Drive 1/2-Ton Pickup Truck
24 LIB ELEV3 117,300117,300LIB: Elevator #3 Modernization Upgrades
24 MILL ST 424,200424,200DPW: Mill St Reconst
24 PRKS VEH1 61,50061,500Parks: Replace'14 Toro 7200 Grndmstr Zero Trn #456
24 PRKS VEH2 69,00069,000Parks: Replace '12 CNG Dump Truck #412
24 PRKS VEH3 29,50029,500Parks: Replace '09 Leaf Picker/Vacuum #031
24 SANI VEH1 190,000190,000SAN: #207, Rear-Load Refuse Truck
24 SP TENNIS 100,000100,000Parks: Stevens Park Tennis Court Reconstruction
24 STR EQP1 60,00060,000STR: #108, Floor Scrubber
24 STR EQP2 30,00030,000STR: #218, Trailered Air Compressor
24 STR VEH1 210,000210,000STR: #72, Tandem-Axle Dump Truck
24 STR VEH2 189,000189,000STR: #41, Single-Axle Area Plow Truck
24 STR VEH3 100,000100,000STR: #92, Semi-Tractor
24 STR VEH4 10,00010,000STR: #230, 5-Ton Tandem-Axle Trailer
Wednesday, April 21, 2021Page 82021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
24 STR VEH5 110,000110,000STR: #36, 4WD Single-Axle Truck
24 STR VEH6 205,000205,000STR: #174, Utility Tractor
24 STR VEH7 10,00010,000STR: #105, Zero-Turn Mower
24 VEH ELEC1 200,000200,000TR: Electric Division Truck (repl 2003)
24 W ALG EQP 200,000200,000Parks: West Algoma Park Play Equipment & Surfacing
24 WAUGOO 1,641,3001,641,300DPW: Waugoo Ave Reconst
24 WHCRL TNS 200,000200,000Parks: Westhaven Circle Prk Tennis Crt Reconstuct
25 2ELEC BUS 200,000200,000TR: 2 Elec Buses (repl 2013's) & 1 Charging Infras
25 ARTHUR 607,900607,900DPW: Arthur Ave Reconst
25 ARW EQUIP 200,000200,000Parks: Red Arrow Park Play Equipment
25 ARW LGHTS 40,00040,000Parks: Red Arrow Park Lighting Replacement
25 BAY SHORE 634,600634,600DPW: Bay Shore Dr Reconst
25 BOWEN ST 1,070,6001,070,600DPW: Bowen St Reconst
25 LANDSCAPE 300,000300,000MUSM: Implement Landscape Plan
25 MP LIGHTS 50,00050,000Parks: Menominee Park Lighting Replacement
25 MP TC LTS 150,000150,000Parks: Menominee Park Tennis Court Lights
25 PRKS TRLR 11,00011,000Parks: Replace Enclosed Trailer #428
25 PRKS VEH1 66,50066,500Parks: Replace'15 Toro 7200 Grndmstr Zero Trn #457
25 PRKS VEH2 22,50022,500Parks: Replace '12 Smithco Athletic Field Grmr P12
25 QURY DOG 100,000100,000Parks: Quarry Park Dog Park Development
25 RIPON LN 321,200321,200DPW: Ripon Ln Utility Install & Asphalt Patching
25 SANI VEH1 190,000190,000SAN: #212, Rear-Load Refuse Truck
25 STR VEH1 220,000220,000STR: #73, Tandem-Axle Plow Truck
25 STR VEH2 65,00065,000STR: #241, Leaf Blower
25 STR VEH3 189,000189,000STR: #44, Single-Axle Area Plow Truck
25 STR VEH4 175,000175,000STR: #172, 114" Snow Blower
25 STR VEH5 275,000275,000STR: #117, Articulated Loader
25 STR VEH6 165,000165,000STR: #168, Paver
25 STR VEH7 19,00019,000STR: #240, Tandem-Axle Equipment Trailer
25 STR VEH8 32,50032,500STR: #37, Supervisor's Pickup Truck
25 SW VEH1 280,000280,000SW: #159, Street Sweeper
25 TR HOIST 20,00020,000TR: Replace Go Transit Hoist in maintenance garage
25 TRN MOWR1 14,50014,500Parks: Replace '14 Skag Zero Turn Mower #1
25 TRN MOWR2 14,50014,500Parks: Replace '14 Skag Zero Turn Mower #2
25 TRN MOWR3 14,50014,500Parks: Replace '14 Skag Zero Turn Mower #3
25 TRN MOWR4 14,50014,500Parks: Replace '14 Skag Zero Turn Mower #4
25 WEST 15TH 1,539,3001,539,300DPW: W 15th Ave Reconst
25 WHCRL PAD 400,000400,000Parks: Westhaven Circle Park - Splash Pad
82,916,84110,809,161 20,827,100 26,154,780 13,723,700 11,402,1004401-Debt Total
4510-Debt: State Trust Fund Loan
00A BLGT RM2 1,250,000250,000 250,000 250,000 250,000 250,000CD: Gateway Blight Elimination
21 SANI VEH1 290,000290,000SAN: #218, Automated Side-Load Refuse Truck
21 SANI VEH2 290,000290,000SAN: #217, Automated Side-Load Refuse Truck
22 SANI VEH1 290,000290,000SAN: #219, Automated Side-Load Refuse Truck
2,120,000830,000 540,000 250,000 250,000 250,0004510-Debt: State Trust Fund Loan Total
4540 - Water Revenue Bonds
21 WD ST BDG 440,00090,000 350,000WD: Heated Storage Building
21 WF M BAY 2,300,000300,000 2,000,000WFP: 36" Intake Miller's Bay Bypass
21-03 FDL SS 100,000100,000ENG: Fond du Lac Sanitary Sewer
21-04 W 9TH 53,90053,900DPW: West 9th Avenue Reconstruction
Wednesday, April 21, 2021Page 92021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
21-05 CEAPE 1,556,4001,556,400DPW: Ceape Avenue Reconstruction
21-07 KNAPP 3,709,6003,709,600ENG: Knapp Street Area Water Main Replacements
21-12 BRADLY 35,00035,000ENG: Bradley Street Asphalt Paving
22 ALGOMA 1,722,7001,722,700DPW: Algoma Boulevard Reconstruction
22 E LINCOLN 891,400891,400DPW: East Lincoln Avenue Reconstruction
22 GRAND ST 488,800488,800DPW: Grand Street Reconstruction
22 ROSALIA 1,479,7001,479,700DPW: Rosalia St WtrMn RPLCMT/Asphalt Paving
22 WD VEH1 135,000135,000WD: #815, Backhoe/Front End Loader
22 WD VEH2 78,00078,000WD: #819, Mini Dump Truck
22 WF MEDIA 2,400,0001,200,000 1,200,000WFP: Dual Media Filter Repairs/Replacements
22 WF ROOF 225,000225,000WFP: Water Filtration Plant Membrane Roof Repl.
23 ASPHALT 150,00050,000 50,000 50,000ENG: Asphalt Program (Annual)
23 MCKINLEY 331,600331,600DPW: McKinley St Reconst
23 S MAIN 2,041,7002,041,700DPW: S Main St Reconstruction
23 W LINCOLN 773,900773,900DPW: W Lincoln Ave Reconst
23 WD VEH1 46,00046,000WD: #801, 3/4-Ton CNG 4x4 Pickup Truck
23 WD VEH2 57,00057,000WD: #821, 3/4-Ton Pickup Truck
23 WF LL PMP 1,271,0001,271,000WFP: Replace Low-Lift Pumps and Related Equipment
24 CENTRAL 918,700918,700DPW: Central St Reconst
24 CHERRY 1,436,5001,436,500DPW: Cherry St Reconst
24 MILL ST 123,700123,700DPW: Mill St Reconst
24 WAUGOO 1,405,4001,405,400DPW: Waugoo Ave Reconst
24 WD VEH1 190,000190,000WD: #835, Replace with Tri-Axle Dump Truck
24 WF F CLNR 20,00020,000WFP: Replace Floor Cleaner
24 WF GAC FT 3,445,000300,000 3,145,000WFP: Repl Granulated Activated Carbon Filter Media
24 WF PUMP 2,135,000135,000 2,000,000WFP: Chloramine System/Repl Booster Station Pumps
25 ARTHUR 589,400589,400DPW: Arthur Ave Reconst
25 BAY SHORE 494,600494,600DPW: Bay Shore Dr Reconst
25 BOWEN ST 620,500620,500DPW: Bowen St Reconst
25 RIPON LN 176,000176,000DPW: Ripon Ln Utility Install & Asphalt Patching
25 WD VEH1 45,00045,000WD: #809, Trailer-Mounted Dewatering Pump
25 WD VEH2 38,00038,000WD: #829, 3/4-Ton Van
25 WD VEH3 78,00078,000WD: #817, Mini Dump Truck
25 WD VEH4 57,00057,000WD: #827, 3/4-Ton Pickup Truck
25 WEST 15TH 1,364,8001,364,800DPW: W 15th Ave Reconst
25 WF A SCBR 451,000451,000WFP: Ammonia Gas Scrubber
25 WF C SCBR 383,000383,000WFP: Chlorine Gas Scrubber
25 WF SCADA 20,00020,000WFP: Replace SCADA Computers
34,278,3005,809,900 7,405,600 5,771,200 5,779,300 9,512,3004540 - Water Revenue Bonds Total
4545-Safe Drinking Water Loan
21 WF CLRWLL 22,000,00010,000,000 8,000,000 4,000,000WFP: Clearwell Replacement
22 WF GENER 4,500,000400,000 4,100,000WFP: Replace Ozone Generators
22 WF OZONE 1,550,000130,000 1,420,000WFP: Replace Ozone Liquid Oxygen System
28,050,00010,000,000 8,530,000 9,520,0004545-Safe Drinking Water Loan Total
4550-Sewer Revenue Bonds
21 WW CF SYS 555,000555,000WW: Chlorine Feed System Upgrade
21 WW CLRFRS 900,000450,000 450,000WW: Clarifiers #1, #2, #3, & #4 Floor Replacement
21 WW DUMP 1,000,0001,000,000WW: Update/Relocation of Dump Site
21 WW EUSS 7,665,500890,000 2,593,500 4,182,000WW: Replace Electrical Unit Substations
21 WW PM SYS 420,00050,000 370,000WW: Replace Polymer Mixing System
Wednesday, April 21, 2021Page 102021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
21 WW VEH1 9,8009,800WW: #172, Zero-Turn Lawn Mower
21-03 FDL SS 5,227,4005,227,400ENG: Fond du Lac Sanitary Sewer
21-03 OREGON 10,029,2002,775,600 3,955,700 3,297,900DPW: Oregon Street Interceptor Sewer
21-04 W 9TH 1,163,5001,163,500DPW: West 9th Avenue Reconstruction
21-05 CEAPE 1,113,9001,113,900DPW: Ceape Avenue Reconstruction
21-11 LEAKS 3,500,000500,000 500,000 500,000 1,000,000 1,000,000ENG: Inflow/Infiltration Removal
21-12 BRADLY 50,00050,000ENG: Bradley Street Asphalt Paving
22 ALGOMA 1,160,9001,160,900DPW: Algoma Boulevard Reconstruction
22 E LINCOLN 496,300496,300DPW: East Lincoln Avenue Reconstruction
22 ENG BOWEN 3,669,6003,669,600ENG: Bowen Street Interceptor Sewer
22 GRAND ST 286,400286,400DPW: Grand Street Reconstruction
22 ROSALIA 50,00050,000DPW: Rosalia St WtrMn RPLCMT/Asphalt Paving
22 WW BR VFD 35,00035,000WW: Repl Dry Weather VFD at Broad St. Pump Station
22 WW WTP PR 175,000175,000WW: WWTP Pump Room Repairs
23 ASPHALT 150,00050,000 50,000 50,000ENG: Asphalt Program (Annual)
23 MCKINLEY 218,900218,900DPW: McKinley St Reconst
23 MOCKBIRD 3,0003,000ENG: Mockingbird Way Traffic Calming
23 S MAIN 1,139,1001,139,100DPW: S Main St Reconstruction
23 W LINCOLN 570,100570,100DPW: W Lincoln Ave Reconst
23 WW BOWEN 750,000100,000 650,000WW: Bowen Street Pump Station Upgrades
23 WW CHL PP 242,00050,000 192,000WW: Replace WWTP Chlorinators and Piping
23 WW EFF ST 205,000205,000WW: Replace Effluent Strainers
23 WW INSPEC 1,500,000100,000 1,400,000WW: Collection System Inspections
24 CENTRAL 647,500647,500DPW: Central St Reconst
24 CHERRY 874,500874,500DPW: Cherry St Reconst
24 MILL ST 63,80063,800DPW: Mill St Reconst
24 WAUGOO 863,100863,100DPW: Waugoo Ave Reconst
24 WW BAR SC 1,900,0001,900,000WW: Replace WWTP Influent Bar Screens
24 WW D HVAC 150,000150,000WW: Replace Digester Area HVAC
24 WW SHORE 230,00045,000 185,000WW: Replace Shorewood Lift Station Piping & Valves
25 ARTHUR 399,700399,700DPW: Arthur Ave Reconst
25 BAY SHORE 367,800367,800DPW: Bay Shore Dr Reconst
25 BOWEN ST 458,500458,500DPW: Bowen St Reconst
25 RIPON LN 123,100123,100DPW: Ripon Ln Utility Install & Asphalt Patching
25 WEST 15TH 907,200907,200DPW: W 15th Ave Reconst
25 WW HVAC 112,000112,000WW: Replace Wastewater Facility HVAC
25 WW S MAIN 130,000130,000WW: Repl S Main St Pump Station Generator & Equip
49,512,80013,735,200 13,792,400 10,416,000 7,835,900 3,733,3004550-Sewer Revenue Bonds Total
4560-Storm Revenue Bonds
21 SW VEH1 10,00010,000SW: #100, Zero-Turn Mower
21 WW DUMP 1,000,0001,000,000WW: Update/Relocation of Dump Site
21-03 FDL SS 50,00050,000ENG: Fond du Lac Sanitary Sewer
21-03 OREGON 225,00075,000 75,000 75,000DPW: Oregon Street Interceptor Sewer
21-04 W 9TH 1,972,0001,972,000DPW: West 9th Avenue Reconstruction
21-05 CEAPE 883,000883,000DPW: Ceape Avenue Reconstruction
21-08 WESTOW 985,000800,000 185,000ENG: Westowne Area Detention Basin
21-12 BRADLY 1,250,000100,000 1,150,000ENG: Bradley Street Asphalt Paving
21-13 ANCHOR 3,272,000100,000 2,179,000 993,000ENG: Anchorage Watershed RR-Libbey Storm Sewer
21-14 JOHNAV 3,685,000500,000 3,000,000 185,000ENG: Glatz Cr/Gallups-Merritts/Johnson Av Wtrsheds
21-15 SAWYR 6,800,0001,500,000 300,000 5,000,000ENG: Sawyer Creek Watershed Detention Basin
22 ALGOMA 1,978,5001,978,500DPW: Algoma Boulevard Reconstruction
22 E LINCOLN 460,000460,000DPW: East Lincoln Avenue Reconstruction
22 ENG BOWEN 75,00075,000ENG: Bowen Street Interceptor Sewer
Wednesday, April 21, 2021Page 112021 - 2025 CIP Projects by Department
TotalSourceProject #2021 2022 2023 2024 2025
22 GRAND ST 536,000536,000DPW: Grand Street Reconstruction
22 ROSALIA 532,000532,000DPW: Rosalia St WtrMn RPLCMT/Asphalt Paving
22 SW VEH1 49,00049,000SW: #228, Trailered Water Pump
22 WW VEH1 41,00041,000WW: #970, Pickup Truck
23 VEGET 264,00095,000 169,000ENG: Vegetation Planting
23 ASPHALT 225,00075,000 75,000 75,000ENG: Asphalt Program (Annual)
23 ENG FRNAU 5,050,00050,000 5,000,000ENG: Fernau Watershed Detention Basin (Hoffmaster)
23 MCKINLEY 148,000148,000DPW: McKinley St Reconst
23 MOCKBIRD 10,00010,000ENG: Mockingbird Way Traffic Calming
23 S MAIN 1,506,0001,506,000DPW: S Main St Reconstruction
23 STRING 4,380,000400,000 3,980,000ENG: Stringham Watershed Box Culvert-Phase 2
23 SW VEH1 290,000290,000SW: #157, Street Sweeper
23 W LINCOLN 752,000752,000DPW: W Lincoln Ave Reconst
24 CENTRAL 570,000570,000DPW: Central St Reconst
24 CHERRY 1,179,0001,179,000DPW: Cherry St Reconst
24 MILL ST 497,000497,000DPW: Mill St Reconst
24 WAUGOO 874,000874,000DPW: Waugoo Ave Reconst
25 ARTHUR 319,000319,000DPW: Arthur Ave Reconst
25 BAY SHORE 278,000278,000DPW: Bay Shore Dr Reconst
25 BOWEN ST 437,000437,000DPW: Bowen St Reconst
25 RIPON LN 96,00096,000DPW: Ripon Ln Utility Install & Asphalt Patching
25 WEST 15TH 1,446,0001,446,000DPW: W 15th Ave Reconst
42,124,5006,990,000 10,519,500 9,435,000 7,360,000 7,820,0004560-Storm Revenue Bonds Total
4950-Donations
21 GOH SIGNS 75,00075,000GS: Grand Opera House Signage Updates
21 GOH STAGE 10,00010,000GS: Grand Opera House Stage Floor Replacement
85,00085,0004950-Donations Total
291,096,73262,358,900 72,238,370 70,619,720 43,731,684 42,148,058GRAND TOTAL
Wednesday, April 21, 2021Page 122021 - 2025 CIP Projects by Department
Capital Improvements Program
City of Oshkosh, Wisconsin Contact General Services Manager
Data in Year 2021 Department 0130 - Facilities
Description
General Services coordinates office furniture replacements for all departments except Utilities and OPL. Replacements of office furniture (chairs,
tables, workstations, file cabinets, etc.) are based on wear and tear and/or for approved office reconfigur
Project #00A FURN RPL
Justification
Professional office areas require durable and ergonomically designed office furniture to promote an efficient, healthy and productive work
environment.
Useful Life 15 years
Project Name GS: Office Furniture Replacement Category 7202 - Office Equipment
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$50,000
MUNIS PROJ#:65025 ANNUAL
MUNIS Acct #:0323-0130
Status Active
Total20212022202320242025Expenditures2026
50,00010,000 10,000 10,000 10,000 10,0007202 - Office Equipment
10,000 10,000 10,000 10,000 10,000 50,000Total
Total20212022202320242025Funding Sources 2026
50,00010,000 10,000 10,000 10,000 10,0004100-Levy
10,000 10,000 10,000 10,000 10,000 50,000Total
Tuesday, January 19, 2021Page 12021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact General Services Manager
Data in Year 2021 Department 0130 - Facilities
Description
General Services coordinates the HVAC/Roofing replacement program schedule for all City buildings (with the exception of Utility buildings)
based on age/condition and service life expectancy. Each year the program prioritizes HVAC/Roofing projects and ov
Project #00A HVAC/RF
Justification
Regular updates/replacements of outdated, inefficient or failing HVAC/roofing will ensure City buildings will extend their service life and allow
operations to properly achieve their missions.
Useful Life 20 years
Project Name GS: HVAC/Roofing Replacement Program Category 7214 - Buildings
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:65/200
Total Project Cost:$2,500,000
MUNIS PROJ#:63035 ANNUAL
MUNIS Acct #:0323-0130
Status Active
Total20212022202320242025Expenditures2026
2,500,000500,000 500,000 500,000 500,000 500,0007214 - Building Improvements
500,000 500,000 500,000 500,000 500,000 2,500,000Total
Total20212022202320242025Funding Sources 2026
2,500,000500,000 500,000 500,000 500,000 500,0004401-Debt
500,000 500,000 500,000 500,000 500,000 2,500,000Total
Tuesday, January 19, 2021Page 22021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact General Services Manager
Data in Year 2021 Department 0130 - Facilities
Description
Complete an ADA audit of all City buildings.
Project #21 ADA AUDIT
Justification
Title II of the ADA prohibits discrimination by government entities, including cities, on the basis of disability. Part of ensuring compliance by the
City is to conduct a facility audit to determine the current level of compliance with ADA standards in C
Useful Life
Project Name GS: Complete ADA Audit of all City buildings Category 6401 - Contractual Services
Type Other
PASER Rating:
CIP Proj. Score:
Total Project Cost:$60,000
MUNIS PROJ#:63100
MUNIS Acct #:0323-0130
Status Active
Total20212022202320242025Expenditures2026
60,00060,0006401 - Planning
60,000 60,000Total
Total20212022202320242025Funding Sources 2026
60,00060,0004100-Levy
60,000 60,000Total
Tuesday, January 19, 2021Page 32021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Police Chief
Data in Year 2021 Department 0211 - Police
Description
Renovations to vacant office space in the north end of Safety Building
Project #21 PD RENO
Justification
Renovation of the vacant space is necessary to accommodate expansion of the Administrative Bureau (Professional Standards and Support Services
Divisions). This will improve our workflow efficiency and customer service. Preliminary work has already been do
Useful Life 15 years
Project Name POLC: Renovations to Vacant Ofc Space North End Category 7214 - Buildings
Type Other
PASER Rating:
CIP Proj. Score:75/200
Total Project Cost:$150,000
MUNIS PROJ#:06818
MUNIS Acct #:0323-0211
Status Active
Total20212022202320242025Expenditures2026
150,000150,0007214 - Building Improvements
150,000 150,000Total
Total20212022202320242025Funding Sources 2026
150,000150,0004401-Debt
150,000 150,000Total
Tuesday, January 19, 2021Page 42021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Police Chief
Data in Year 2021 Department 0211 - Police
Description
SWAT Team Truck Replacement: The current SWAT Truck is a 1997 and is 23 years old and now requires more maintenance/repairs.
Project #21 PD SWT TR
Justification
The SWAT team uses this vehicle as the primary means of transporting equipment and personnel to the scenes of SWAT operations. SWAT
personnel also operate out of this vehicle from the command post near incident scenes. The SWAT team conducts operation p
Useful Life 20 years
Project Name POLC: SWAT Team Truck Replacement Category 7210 - Vehicles
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:n/a
Total Project Cost:$200,000
MUNIS PROJ#:66115
MUNIS Acct #:0323-0211
Status Active
Total20212022202320242025Expenditures2026
200,000200,0007210 - Vehicles
200,000 200,000Total
Total20212022202320242025Funding Sources 2026
200,000200,0004401-Debt
200,000 200,000Total
Tuesday, January 19, 2021Page 52021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Fire Chief
Data in Year 2021 Department 0230 - Fire
Description
This request is for Bunker Boots for 108 firefighters. An example of the boot can be found here: https://globe.msasafety.com/arctic-grip-boots
Project #21 FIRE BTS
Justification
Our existing boots are a safety issue. They are past service life and do not provide firefighters with other forms of protection. The NFPA 1851
Standard on Selection, Care, & Maintenance of Protective Ensembles for Structural Fire Fighting & Proximity F
Useful Life 10 years
Project Name FIRE: Turn Out Gear Boots Category 7204 - Machinery & Equip
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:
Total Project Cost:$49,500
MUNIS PROJ#:66105
MUNIS Acct #:0323-0230
Status Active
Total20212022202320242025Expenditures2026
49,50049,5007204 - Equipment/Machinery
49,500 49,500Total
Total20212022202320242025Funding Sources 2026
49,50049,5004100-Levy
49,500 49,500Total
Tuesday, January 19, 2021Page 62021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Fire Chief
Data in Year 2021 Department 0230 - Fire
Description
Turnout gear is a firefighter's protective clothing that is comprised of three distinct layers: the thermal liner, the moisture barrier & the outer shell.
Each serves specific multiple functions. The thermal liner is the most critical component in turnout
Project #21 FIRE GEAR
Justification
NFPA 1851 Standard on Selection, Care, and Maintenance of Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting
requires that structural turnout gear shall be retired when the garment is beyond repair and no longer able to pass an
Useful Life 10 years
Project Name FIRE: Turn Out Gear Pants & Coats Category 7204 - Machinery & Equip
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:
Total Project Cost:$109,225
MUNIS PROJ#:66105
MUNIS Acct #:0323-0230
Status Active
Total20212022202320242025Expenditures2026
109,22540,000 32,100 12,800 24,3257204 - Equipment/Machinery
40,000 32,100 12,800 24,325 109,225Total
Total20212022202320242025Funding Sources 2026
109,22540,000 32,100 12,800 24,3254100-Levy
40,000 32,100 12,800 24,325 109,225Total
Tuesday, January 19, 2021Page 72021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Fire Chief
Data in Year 2021 Department 0230 - Fire
Description
Turnout Gear: Bullard Helmets with shields and nametags. See an example: https://www.bullard.com/fire-helmets
Project #21 FIRE HELM
Justification
Over time, heat exposure can impact the fire helmet by blistering, bubbling and general degradation. NFPA 1851, Standard on Selection, Care,
and Maintenance of Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting, requires that s
Useful Life 10 years
Project Name FIRE: Turn Out Gear Helmets Category 7204 - Machinery & Equip
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:
Total Project Cost:$29,857
MUNIS PROJ#:66105
MUNIS Acct #:0323-0230
Status Active
Total20212022202320242025Expenditures2026
29,8575,000 1,740 4,659 18,4587204 - Equipment/Machinery
5,000 1,740 4,659 18,458 29,857Total
Total20212022202320242025Funding Sources 2026
29,8575,000 1,740 4,659 18,4584100-Levy
5,000 1,740 4,659 18,458 29,857Total
Tuesday, January 19, 2021Page 82021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Fire Chief
Data in Year 2021 Department 0230 - Fire
Description
Replacement of 1994 Ford Explorer
Project #21 FIRE VEH1
Justification
The existing vehicle has reached the end of its service life. We will replace it with a pick up truck that will allow for more versatility. A new
vehicle will be able to tow other OFD assets such as rescue boat, trailers of hazardous material, equipment
Useful Life 10 years
Project Name FIRE: Replace '94 Ford Expl with 1 Ton pickup Category 7210 - Vehicles
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$44,300
MUNIS PROJ#:66002
MUNIS Acct #:0323-0230
Status Active
Total20212022202320242025Expenditures2026
44,30044,3007210 - Vehicles
44,300 44,300Total
Total20212022202320242025Funding Sources 2026
44,30044,3004401-Debt
44,300 44,300Total
Tuesday, January 19, 2021Page 92021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Fire Chief
Data in Year 2021 Department 0230 - Fire
Description
The existing vehicle has reached the end of its service life with close to 95,000 miles (as of 3/31/20). We will replace it with a Suburban pick up
truck that will allow for more versatility. A new vehicle will be able to tow other OFD assets such as re
Project #21 FIRE VEH2
Justification
Replace 1999 Chevrolet Surburban with 4 door, 1 ton Suburban
Useful Life 10 years
Project Name FIRE: Replacement of '99 Chevrolet Suburban Category 7210 - Vehicles
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$45,700
MUNIS PROJ#:66106
MUNIS Acct #:0323-0230
Status Active
Total20212022202320242025Expenditures2026
45,70045,7007210 - Vehicles
45,700 45,700Total
Total20212022202320242025Funding Sources 2026
5005002000-Trade-In
45,20045,2004401-Debt
45,700 45,700Total
Tuesday, January 19, 2021Page 102021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
The Town of Algoma and the City are working together to perform a full reconstruction and urbanization of the street, including public utilities and
laterals, from Leonard Point Road to Brooks Lane. The City will be sharing the costs with the Town of Alg
Project #21-01 OMRO
Justification
Intergovernmental agreement with the Town of Algoma for costs associated with the properties on this road that are in the City.
Age of Infrastructure:
Street Pavement - 2001
Document/Study/Planning Document: Bicycle and Pedestrian Master Plan 2019
Useful Life 30+ years
Project Name DPW: Omro Road Reconstruction Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:7
CIP Proj. Score:90/200
Total Project Cost:$300,000
MUNIS PROJ#:04101
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
256,400256,4006801 - Street
43,60043,6006806 - Sidewalk
300,000 300,000Total
Total20212022202320242025Funding Sources 2026
268,600268,6004317-Assessment
31,40031,4004401-Debt
300,000 300,000Total
Tuesday, January 19, 2021Page 112021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
3,900' of sanitary sewer will be relayed on Fond du Lac Road, from the West 28th Avenue Pump Station to the Waukau Avenue Pump Station.
The sanitary sewer will be increased in size from 15" to 21". This project will eliminate the Waukau Avenue Pump Stat
Project #21-03 FDL SS
Justification
This project will aid in reducing the occurrence of basement backups in the area.
Document/Study/Planning Document: Sanitary Sewer System 2050 Planning Study (2017)
Useful Life 75-100 years
Project Name ENG: Fond du Lac Sanitary Sewer Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:110/200
Total Project Cost:$5,400,400
MUNIS PROJ#:04103
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
50,00050,0006804 - Storm
5,244,4005,244,4006802 - Sanitary
100,000100,0006803 - Water
6,0006,0006810 - Admin
5,400,400 5,400,400Total
Total20212022202320242025Funding Sources 2026
23,00023,0004317-Assessment
100,000100,0004540 - Water Revenue Bonds
5,227,4005,227,4004550-Sewer Revenue Bonds
50,00050,0004560-Storm Revenue Bonds
5,400,400 5,400,400Total
Tuesday, January 19, 2021Page 122021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
In 2021, 2,000' of 36" interceptor sewer will be constructed on Oregon Street, from West 28th Avenue to West Waukau Avenue. In 2022, 2,900'
of 36" interceptor sewer will be constructed on Oregon Street, from West Waukau Avenue to West 35th Avenue. In 20
Project #21-03 OREGON
Justification
This interceptor line construction started in 2018 and, once complete, will service development for the Aviation Industrial Park, as well as
additional development at West Ripple Avenue and Oregon Street. Ultimately, this will also serve development alon
Useful Life 75-100 years
Project Name DPW: Oregon Street Interceptor Sewer Category 7206 - Capital Construction
Type Infrastructure - New
PASER Rating:4, 5, 6
CIP Proj. Score:130/200
Total Project Cost:$10,504,200
MUNIS PROJ#:04103
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
250,000250,0006801 - Street
225,00075,000 75,000 75,0006804 - Storm
10,029,2002,775,600 3,955,700 3,297,9006802 - Sanitary
3,100,600 4,030,700 3,372,900 10,504,200Total
Total20212022202320242025Funding Sources 2026
10,029,2002,775,600 3,955,700 3,297,9004550-Sewer Revenue Bonds
225,00075,000 75,000 75,0004560-Storm Revenue Bonds
250,000250,0004401-Debt
3,100,600 4,030,700 3,372,900 10,504,200Total
Tuesday, January 19, 2021Page 132021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This project includes the reconstruction of West 9th Avenue, from Oakwood Road to Linden Oaks Drive. Proposed 3,370' length of 48' concrete
in 80' right-of-way. New storm sewer will be installed and existing storm sewer from South Oakwood Road to Sawyer
Project #21-04 W 9TH
Justification
Age of Infrastructure:
Sanitary - 1990 and 1994
Water - 1990 and 1994
Storm - None present and 1992
Street Pavement - 1980
Document/Study/Plannning Document: Bicycle and Pedestrian Master Plan 2019, Southwest Area Sanitary Sewer Study (2002), and
Useful Life 30+ years
Project Name DPW: West 9th Avenue Reconstruction Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:4
CIP Proj. Score:85/200
Total Project Cost:$7,211,100
MUNIS PROJ#:04104
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
3,183,2003,183,2006801 - Street
2,005,5002,005,5006804 - Storm
1,271,0001,271,0006802 - Sanitary
63,40063,4006803 - Water
182,000182,0006806 - Sidewalk
500,000500,0006809 - Traffic
6,0006,0006810 - Admin
7,211,100 7,211,100Total
Total20212022202320242025Funding Sources 2026
993,500993,5004317-Assessment
53,90053,9004540 - Water Revenue Bonds
1,163,5001,163,5004550-Sewer Revenue Bonds
1,972,0001,972,0004560-Storm Revenue Bonds
3,028,2003,028,2004401-Debt
7,211,100 7,211,100Total
Tuesday, January 19, 2021Page 142021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
Full reconstruction of the street, including public utilities and laterals, from Bowen Street to Lake Street. Proposed 2,510' length of 32' concrete
pavement in 60' right-of-way. Existing storm sewer from Bowen Street to Lake Street will be upsized. Si
Project #21-05 CEAPE
Justification
Age of Infrastructure:
Sanitary - 1936 and 1938
Water - Pre-1920's
Storm - 1969 and 1978
Street Pavement - 1979
Document/Study/Planning Document: Bicycle and Pedestrian Master Plan 2019 and Water Distribution System Hydraulic Model and Planning St
Useful Life 30+ years
Project Name DPW: Ceape Avenue Reconstruction Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:2, 4
CIP Proj. Score:105/200
Total Project Cost:$6,040,500
MUNIS PROJ#:04105
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
1,617,5001,617,5006801 - Street
945,500945,5006804 - Storm
1,401,1001,401,1006802 - Sanitary
1,554,9001,554,9006803 - Water
135,500135,5006806 - Sidewalk
380,000380,0006809 - Traffic
6,0006,0006810 - Admin
6,040,500 6,040,500Total
Total20212022202320242025Funding Sources 2026
956,800956,8004317-Assessment
1,556,4001,556,4004540 - Water Revenue Bonds
1,113,9001,113,9004550-Sewer Revenue Bonds
883,000883,0004560-Storm Revenue Bonds
1,530,4001,530,4004401-Debt
6,040,500 6,040,500Total
Tuesday, January 19, 2021Page 152021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This program rotates through the City on a 10-year cycle to repair defective sidewalk squares. This program also includes citizen complaint
locations. Handicap ramps are installed at intersections currently without ramps. Program also fixes deteriorate
Project #21-06A REHAB
Justification
The program cycles through the City on approximately a 10-year cycle.
Useful Life 10 years
Project Name SDWK: Rehabilitation & Reconstruction Program Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:90/200
Total Project Cost:$8,880,000
MUNIS PROJ#:04006 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
5,328,000888,000 888,000 888,000 888,000 888,0006806 - Sidewalk 888,000
888,000 888,000 888,000 888,000 888,000 5,328,000Total888,000
Future
3,552,000
Total
Total20212022202320242025Funding Sources 2026
3,528,000588,000 588,000 588,000 588,000 588,0004317-Assessment 588,000
1,800,000300,000 300,000 300,000 300,000 300,0004401-Debt 300,000
888,000 888,000 888,000 888,000 888,000 5,328,000Total888,000
Future
3,552,000
Total
Tuesday, January 19, 2021Page 162021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This project installs new sidewalk along street segments without sidewalk.
Project #21-06B NWSID
Justification
Selection to be coordinated through Bicycle and Pedestrian Advisory Committee.
Useful Life 10 years
Project Name SDWK: New Walk Ordered In Category 7206 - Capital Construction
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:85/200
Total Project Cost:$700,000
MUNIS PROJ#:04126 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
420,00070,000 70,000 70,000 70,000 70,0006806 - Sidewalk 70,000
70,000 70,000 70,000 70,000 70,000 420,000Total70,000
Future
280,000
Total
Total20212022202320242025Funding Sources 2026
390,00065,000 65,000 65,000 65,000 65,0004317-Assessment 65,000
30,0005,000 5,000 5,000 5,000 5,0004100-Levy 5,000
70,000 70,000 70,000 70,000 70,000 420,000Total70,000
Future
280,000
Total
Tuesday, January 19, 2021Page 172021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This project installs sidewalks at various locations within newer subdivisions.
Project #21-06CSUBSID
Justification
Sidewalk needs to be installed in subdivisions with vacant lots. This portion will clean up subdivisions that have gaps in the sidewalk.
Useful Life 10 years
Project Name SDWK: Subdivision Agreements Category 7206 - Capital Construction
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:75/200
Total Project Cost:$300,000
MUNIS PROJ#:04127 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
180,00030,000 30,000 30,000 30,000 30,0006806 - Sidewalk 30,000
30,000 30,000 30,000 30,000 30,000 180,000Total30,000
Future
120,000
Total
Total20212022202320242025Funding Sources 2026
165,00027,500 27,500 27,500 27,500 27,5004317-Assessment 27,500
15,0002,500 2,500 2,500 2,500 2,5004100-Levy 2,500
30,000 30,000 30,000 30,000 30,000 180,000Total30,000
Future
120,000
Total
Tuesday, January 19, 2021Page 182021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
Replace 5,190' of existing 6" water mains with 8" water mains on Knapp Street, from Osborn Avenue to West 18th Avenue; Erie Avenue, from
Knapp Street to Rugby Street; Florida Avenue, from Knapp Street to Sanders Street; Rugby Street, from West South Park
Project #21-07 KNAPP
Justification
The existing water mains have had large amounts of breaks and their replacements were requested by the Water Distribution Division.
Age of Infrastructure:
Water - 1948, 1950, 1951, 1954, and 1964
Useful Life 75+ years
Project Name ENG: Knapp Street Area Water Main Replacements Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:90/200
Total Project Cost:$3,709,600
MUNIS PROJ#:04107
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
3,709,6003,709,6006803 - Water
3,709,600 3,709,600Total
Total20212022202320242025Funding Sources 2026
3,709,6003,709,6004540 - Water Revenue Bonds
3,709,600 3,709,600Total
Tuesday, January 19, 2021Page 192021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This project is for construction to expand the limits of the current City-owned wet detention basin at the intersection of Westowne Avenue and
North Washburn Street. Planting of the detention basin is planned for 2022.
Project #21-08 WESTOW
Justification
The Westowne Watershed is the 4th highest generator of pollutants (total suspended solids/acre) in the City, and increasing the detention basin size
increases the removal of the total suspended solids in this watershed from 12% to 73%.
Useful Life 100+ years
Project Name ENG: Westowne Area Detention Basin Category 7206 - Capital Construction
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:90/200
Total Project Cost:$1,235,000
MUNIS PROJ#:04009
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
985,000800,000 185,0006804 - Storm
800,000 185,000 985,000Total
Prior
250,000
Total
Total20212022202320242025Funding Sources 2026
985,000800,000 185,0004560-Storm Revenue Bonds
800,000 185,000 985,000Total
Prior
250,000
Total
Tuesday, January 19, 2021Page 202021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
The program rotates through the City to repair or replace leaking sanitary sewer infrastructure. The program also includes areas where problems
are identified through regular inspections. Work includes identification and elimination of clear water enter
Project #21-11 LEAKS
Justification
This work helps to remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a significant problem. The
sanitary sewer system is not designed to handle these flows, which may result in sanitary sewer backups into res
Useful Life 75-100 years
Project Name ENG: Inflow/Infiltration Removal Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:120/200
Total Project Cost:$13,500,000
MUNIS PROJ#:04011 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
7,500,0001,000,000 1,000,000 1,000,000 1,500,000 1,500,0006802 - Sanitary 1,500,000
1,000,000 1,000,000 1,000,000 1,500,000 1,500,000 7,500,000Total1,500,000
Future
6,000,000
Total
Total20212022202320242025Funding Sources 2026
3,000,000500,000 500,000 500,000 500,000 500,0001550-Sewer Utility Fund 500,000
4,500,000500,000 500,000 500,000 1,000,000 1,000,0004550-Sewer Revenue Bonds 1,000,000
1,000,000 1,000,000 1,000,000 1,500,000 1,500,000 7,500,000Total1,500,000
Future
6,000,000
Total
Tuesday, January 19, 2021Page 212021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
In 2022, this project will replace proposed length of 2,050' of asphalt paving on Bradley Street, from West 28th Avenue to West Waukau Avenue.
The culvert will be re-installed. A structure will be constructed to cross Gallups-Merritts Creek. In 2021, t
Project #21-12 BRADLY
Justification
Age of Infrastructure:
Sanitary - 1966
Water - 1966
Storm - None Present
Street Pavement - 1977
Useful Life 12+ years
Project Name ENG: Bradley Street Asphalt Paving Category 7218 - Road Improvements
Type Infrastructure - Replacement
PASER Rating:2
CIP Proj. Score:80/200
Total Project Cost:$1,894,400
MUNIS PROJ#:04112
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
559,400559,4006801 - Street
1,250,000100,000 1,150,0006804 - Storm
50,00050,0006802 - Sanitary
35,00035,0006803 - Water
100,000 1,794,400 1,894,400Total
Total20212022202320242025Funding Sources 2026
333,400333,4004317-Assessment
35,00035,0004540 - Water Revenue Bonds
50,00050,0004550-Sewer Revenue Bonds
1,250,000100,000 1,150,0004560-Storm Revenue Bonds
226,000226,0004401-Debt
100,000 1,794,400 1,894,400Total
Tuesday, January 19, 2021Page 222021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This project is for storm sewer construction from East Nevada Avenue to East Murdock Avenue and from East Murdock Avenue to the Libbey
Channel along the eastern side of CN's railroad tracks. In 2021, acquisition of the land and/or easements for the storm
Project #21-13 ANCHOR
Justification
Age of Infrastructure:
Storm - 1931
Document/Study/Planning Document: Anchorage Basin H&H Analysis Update Memorandum Addendum
Useful Life 100+ years
Project Name ENG: Anchorage Watershed RR-Libbey Storm Sewer Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:95/200
Total Project Cost:$3,272,000
MUNIS PROJ#:04113
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
3,272,000100,000 2,179,000 993,0006804 - Storm
100,000 2,179,000 993,000 3,272,000Total
Total20212022202320242025Funding Sources 2026
3,272,000100,000 2,179,000 993,0004560-Storm Revenue Bonds
100,000 2,179,000 993,000 3,272,000Total
Tuesday, January 19, 2021Page 232021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
These southside watersheds have a long history of flooding that has been validated by computer models of the drainage systems. This project will
target key areas where flooding is most acute and where development could occur once flooding is brought unde
Project #21-14 JOHNAV
Justification
Gallups-Merritts Creek Watershed is in need of flood control assistance. This project will construct a floodplain storage area to assist downstream
flooding.
Document/Study/Planning Document: Glatz Creek Storm Water Study, Gallups-Merritts Creek Wate
Useful Life 100+ years
Project Name ENG: Glatz Cr/Gallups-Merritts/Johnson Av Wtrsheds Category 7206 - Capital Construction
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:95/200
Total Project Cost:$3,685,000
MUNIS PROJ#:04114
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
3,685,000500,000 3,000,000 185,0006804 - Storm
500,000 3,000,000 185,000 3,685,000Total
Total20212022202320242025Funding Sources 2026
3,685,000500,000 3,185,0004560-Storm Revenue Bonds
500,000 3,185,000 3,685,000Total
Tuesday, January 19, 2021Page 242021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This project involves constructing a detention basin that will be capable of capturing approximately 300 - 400 acre-feet of flood water from Sawyer
Creek. The property currently has an agricultural land use and is located south of West 20th Avenue and we
Project #21-15 SAWYR
Justification
This basin will be designed to reduce flood risks to homes, businesses, and public utilities downstream in the City of Oshkosh and will make some
properties more suitable for development.
Document/Study/Planning Document: Sawyer Creek Storm Water Mana
Useful Life 100+ years
Project Name ENG: Sawyer Creek Watershed Detention Basin Category 7206 - Capital Construction
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:100/200
Total Project Cost:$6,800,000
MUNIS PROJ#:04115
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
6,800,0001,500,000 300,000 5,000,0006804 - Storm
1,500,000 300,000 5,000,000 6,800,000Total
Total20212022202320242025Funding Sources 2026
6,800,0001,500,000 300,000 5,000,0004560-Storm Revenue Bonds
1,500,000 300,000 5,000,000 6,800,000Total
Tuesday, January 19, 2021Page 252021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
This project will provide mini storm sewers and laterals to property owners that had requested them.
Project #21-20 STRLAT
Justification
The laterals allow property owners to connect to the storm sewer system without discharging water over the sidewalk.
Useful Life 100+ years
Project Name ENG: Mini Storm Sewers/Storm Laterals Category 7206 - Capital Construction
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:90/200
Total Project Cost:$6,750,000
MUNIS PROJ#:04020 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
150,00025,000 25,000 25,000 25,000 25,0006801 - Street 25,000
3,900,000650,000 650,000 650,000 650,000 650,0006804 - Storm 650,000
675,000 675,000 675,000 675,000 675,000 4,050,000Total675,000
Future
2,700,000
Total
Total20212022202320242025Funding Sources 2026
3,750,000625,000 625,000 625,000 625,000 625,0001560-Storm Water Utility Fund 625,000
150,00025,000 25,000 25,000 25,000 25,0004317-Assessment 25,000
150,00025,000 25,000 25,000 25,000 25,0004100-Levy 25,000
675,000 675,000 675,000 675,000 675,000 4,050,000Total675,000
Future
2,700,000
Total
Tuesday, January 19, 2021Page 262021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
Spot repairs to deteriorated panels of concrete pavement will be made on various arterial, collector, and local streets. Some work will be done in
coordination with other construction projects, such as the sanitary manhole rehabilitation project.
Project #21-90 CONCRT
Justification
Work for areas of pavement that have deteriorated but full reconstruction is not needed at this time.
Useful Life 30+ years
Project Name ENG: Concrete Pavement Repairs (Annual)Category 7218 - Road Improvements
Type Other
PASER Rating:Varies
CIP Proj. Score:75/200
Total Project Cost:$2,398,000
MUNIS PROJ#:04090 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
803,000128,000 125,000 175,000 125,000 125,0006801 - Street 125,000
450,00075,000 75,000 75,000 75,000 75,0006804 - Storm 75,000
115,00015,000 20,000 20,000 20,000 20,0006802 - Sanitary 20,000
90,00015,000 15,000 15,000 15,000 15,0006803 - Water 15,000
233,000 235,000 285,000 235,000 235,000 1,458,000Total235,000
Future
940,000
Total
Total20212022202320242025Funding Sources 2026
450,00075,000 75,000 75,000 75,000 75,0001560-Storm Water Utility Fund 75,000
115,00015,000 20,000 20,000 20,000 20,0001550-Sewer Utility Fund 20,000
90,00015,000 15,000 15,000 15,000 15,0001540-Water Utility Fund 15,000
803,000128,000 125,000 175,000 125,000 125,0004100-Levy 125,000
233,000 235,000 285,000 235,000 235,000 1,458,000Total235,000
Future
940,000
Total
Tuesday, January 19, 2021Page 272021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
Environmental Assessment, Subsurface Exploration, and Storm and Sanitary Sewer Televising services to help in the design of yearly CIP projects.
Project #21-91 ENVIR
Justification
Work done to assist in the design of CIP projects.
Useful Life 1 year
Project Name ENG:20-91 Up-Front Engineering Services Category 7206 - Capital Construction
Type Other
PASER Rating:n/a
CIP Proj. Score:60/200
Total Project Cost:$3,650,000
MUNIS PROJ#:04091 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
180,00030,000 30,000 30,000 30,000 30,0006801 - Street 30,000
540,00090,000 90,000 90,000 90,000 90,0006804 - Storm 90,000
1,170,000195,000 195,000 195,000 195,000 195,0006802 - Sanitary 195,000
300,00050,000 50,000 50,000 50,000 50,0006803 - Water 50,000
365,000 365,000 365,000 365,000 365,000 2,190,000Total365,000
Future
1,460,000
Total
Total20212022202320242025Funding Sources 2026
540,00090,000 90,000 90,000 90,000 90,0001560-Storm Water Utility Fund 90,000
1,170,000195,000 195,000 195,000 195,000 195,0001550-Sewer Utility Fund 195,000
300,00050,000 50,000 50,000 50,000 50,0001540-Water Utility Fund 50,000
180,00030,000 30,000 30,000 30,000 30,0004100-Levy 30,000
365,000 365,000 365,000 365,000 365,000 2,190,000Total365,000
Future
1,460,000
Total
Tuesday, January 19, 2021Page 282021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0410 - Utility Infrastructure
Description
As utility-owned lead water services are discovered, these services will be replaced under the Lead Service Replacement Program.
Project #21-93 LEAD
Justification
EPA is mandating all lead water services be removed from the system.
Useful Life 75-100 years
Project Name ENG: Misc. Utility-Owned Lead Service Repl.Category 7206 - Capital Construction
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:105/200
Total Project Cost:$1,000,000
MUNIS PROJ#:04093 ANNUAL
MUNIS Acct #:0321-0410
Status Active
Total20212022202320242025Expenditures2026
600,000100,000 100,000 100,000 100,000 100,0006803 - Water 100,000
100,000 100,000 100,000 100,000 100,000 600,000Total100,000
Future
400,000
Total
Total20212022202320242025Funding Sources 2026
600,000100,000 100,000 100,000 100,000 100,0001540-Water Utility Fund 100,000
100,000 100,000 100,000 100,000 100,000 600,000Total100,000
Future
400,000
Total
Tuesday, January 19, 2021Page 292021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0420 - Engineering
Description
This will replace #389, a 1997 GMC Suburban, with a 4-wheel drive, 1/2-ton pickup truck with a cap.
Project #21 ENG VEH1
Justification
Vehicle #389 currently has 151,706 miles on it. The body is rusting and the engine runs poorly. Once replaced, this truck will become a primary
vehicle, and will move an older truck into a backup role.
Useful Life 10-15 years
Project Name ENG: #389, 4-Wheel Drive 1/2-Ton Pickup Truck Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$37,000
MUNIS PROJ#:66901
MUNIS Acct #:0323-0420
Status Active
Total20212022202320242025Expenditures2026
37,00037,0007210 - Vehicles
37,000 37,000Total
Total20212022202320242025Funding Sources 2026
5005002000-Trade-In
36,50036,5004401-Debt
37,000 37,000Total
Tuesday, January 19, 2021Page 302021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0430 - Street Dept
Description
This will replace #67, a 2007 International, with a tandem-axle plow truck with stainless steel box, wing, and tailgate spreader.
Project #21 STR VEH01
Justification
It has 102,664 miles on it. The hydraulic tank and engine leak oil. The unit has an older Force plow control system that is obsolete and the unit
does not have salt prewetting capabilities. The new unit will have salt prewet capabilities. The plow and
Useful Life 10 years
Project Name STR: #67, Tandem-Axle Plow Truck Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$225,000
MUNIS PROJ#:66022
MUNIS Acct #:0323-0430
Status Active
Total20212022202320242025Expenditures2026
225,000225,0007210 - Vehicles
225,000 225,000Total
Total20212022202320242025Funding Sources 2026
15,00015,0002000-Trade-In
210,000210,0004401-Debt
225,000 225,000Total
Tuesday, January 19, 2021Page 312021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0430 - Street Dept
Description
This will replace #33, a 2005 GMC, with a 3/4-ton 4-wheel drive extended cab pickup truck with liftgate.
Project #21 STR VEH02
Justification
It has 41,898 miles on it. This unit has the mobile refueling tank mounted in it. The dispenser on the fuel tank is getting weak. The body and
undercarriage are rusting. The inside of the cab is showing its age.
Useful Life 10 years
Project Name STR: #33, 3/4-Ton 4WD Pickup Truck Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$40,000
MUNIS PROJ#:66023
MUNIS Acct #:0323-0430
Status Active
Total20212022202320242025Expenditures2026
40,00040,0007210 - Vehicles
40,000 40,000Total
Total20212022202320242025Funding Sources 2026
2,5002,5002000-Trade-In
37,50037,5004401-Debt
40,000 40,000Total
Tuesday, January 19, 2021Page 322021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0430 - Street Dept
Description
This will replace #140, a 2002 Volvo grader with plow and wing.
Project #21 STR VEH04
Justification
It has 5,250 hours on it. The unit has had repeated problems with the moldboard turntable. Recently, it has had issues with the front and rear
drive. The clutch is out on it now and will cost over $10,000 to replace. The engine has been losing power.
Useful Life 10 years
Project Name STR: #140, Motor Grader Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$210,000
MUNIS PROJ#:66917
MUNIS Acct #:0323-0430
Status Active
Total20212022202320242025Expenditures2026
210,000210,0007204 - Equipment/Machinery
210,000 210,000Total
Total20212022202320242025Funding Sources 2026
15,00015,0002000-Trade-In
195,000195,0004401-Debt
210,000 210,000Total
Tuesday, January 19, 2021Page 332021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0430 - Street Dept
Description
This will replace #122, a 2005 Bobcat, with a rubber-tire skid steer with steerable axles, broom, and router.
Project #21 STR VEH05
Justification
It has 1,736 hours on it. The glass for the cab is prone to breaking. The bucket and wheels are worn out.
Useful Life 10 years
Project Name STR: #122, Skid Steer and Router Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$80,000
MUNIS PROJ#:66110
MUNIS Acct #:0323-0430
Status Active
Total20212022202320242025Expenditures2026
80,00080,0007204 - Equipment/Machinery
80,000 80,000Total
Total20212022202320242025Funding Sources 2026
7,0007,0002000-Trade-In
73,00073,0004401-Debt
80,000 80,000Total
Tuesday, January 19, 2021Page 342021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0430 - Street Dept
Description
This will replace #262, a 1996 Craftco walk-behind router. This unit is used to clean out the cracks in concrete and asphalt pavement prior to
sealing them.
Project #21 STR VEH06
Justification
It has 5,015 hours on it. Various components of this unit have been rebuilt and replaced to extend its useful life, such as the lifting actuator, wiring
harness, and cutting wheel drive systems. The engine will need replacement soon. The new unit will
Useful Life 10 years
Project Name STR: #262, Walk-Behind Router Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$25,000
MUNIS PROJ#:66111
MUNIS Acct #:0323-0430
Status Active
Total20212022202320242025Expenditures2026
25,00025,0007204 - Equipment/Machinery
25,000 25,000Total
Total20212022202320242025Funding Sources 2026
5005002000-Trade-In
24,50024,5004401-Debt
25,000 25,000Total
Tuesday, January 19, 2021Page 352021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0430 - Street Dept
Description
This will replace #22, a 2008 Ford, with a 1-ton 4-wheel drive regular cab pickup truck with liftgate.
Project #21 STR VEH07
Justification
It has 40,884 miles on it. The undercarriage and liftgate are rusting. The inside of the cab is showing its age.
Useful Life 10 years
Project Name STR: #22, 1-Ton 4WD Pickup Truck Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$44,000
MUNIS PROJ#:66021
MUNIS Acct #:0323-0430
Status Active
Total20212022202320242025Expenditures2026
44,00044,0007210 - Vehicles
44,000 44,000Total
Total20212022202320242025Funding Sources 2026
2,5002,5002000-Trade-In
41,50041,5004401-Debt
44,000 44,000Total
Tuesday, January 19, 2021Page 362021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0430 - Street Dept
Description
This will replace #238, a 1999 Loadmaster, with a single-axle trailer.
Project #21 STR VEH09
Justification
It is used for hauling the concrete saw. It is showing signs of age. The suspension is wearing out. The metal it is built with is fatigued.
Useful Life 10 years
Project Name STR: #238, Single-Axle Trailer Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$10,000
MUNIS PROJ#:66025
MUNIS Acct #:0323-0430
Status Active
Total20212022202320242025Expenditures2026
10,00010,0007204 - Equipment/Machinery
10,000 10,000Total
Total20212022202320242025Funding Sources 2026
10,00010,0004100-Levy
10,000 10,000Total
Tuesday, January 19, 2021Page 372021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0470 - Sanitation
Description
This will replace #218, a 2013 Labrie automated side-load refuse truck.
Project #21 SANI VEH1
Justification
It has 64,783 miles on it. The dash recently quit working on this unit. The arm chains have no more adjustment and they need to be changed. The
hopper, packer, and gripper are showing signs of wear.
Useful Life 10 years
Project Name SAN: #218, Automated Side-Load Refuse Truck Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$300,000
MUNIS PROJ#:66017
MUNIS Acct #:0323-0470
Status Active
Total20212022202320242025Expenditures2026
300,000300,0007210 - Vehicles
300,000 300,000Total
Total20212022202320242025Funding Sources 2026
290,000290,0004510-Debt: State Trust Fund
Loan
10,00010,0002000-Trade-In
300,000 300,000Total
Tuesday, January 19, 2021Page 382021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 0470 - Sanitation
Description
This will replace #217, a 2013 Labrie automated side-load refuse truck.
Project #21 SANI VEH2
Justification
It has 52,554 miles on it. The speedometer recently quit on this unit. The hopper, packer, and gripper are showing signs of wear.
Useful Life 10 years
Project Name SAN: #217, Automated Side-Load Refuse Truck Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$300,000
MUNIS PROJ#:66017
MUNIS Acct #:0323-0470
Status Active
Total20212022202320242025Expenditures2026
300,000300,0007210 - Vehicles
300,000 300,000Total
Total20212022202320242025Funding Sources 2026
290,000290,0004510-Debt: State Trust Fund
Loan
10,00010,0002000-Trade-In
300,000 300,000Total
Tuesday, January 19, 2021Page 392021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 0610 - Park Dept -General 010
Description
Parks Department New Building. Begin construction of a new parks administration/operations facility necessary to support current and future Parks
Department operations. Construction would begin in 2021 and continue into 2022 as would the phased borrowing
Project #21 PRKS BLDG
Justification
The existing facility from the 1960s was a former technical college building. The city undertook a facilities assessment and this building was
identified as the top priority for needs. It was not designed for municipal operations so it is not efficient
Useful Life 40 years
Project Name Parks: New Building Construction Category 7214 - Buildings
Type Facility - Replacement
PASER Rating:
CIP Proj. Score:
Total Project Cost:$6,400,000
MUNIS PROJ#:63115
MUNIS Acct #:0323-0610
Status Active
Total20212022202320242025Expenditures2026
6,400,0001,500,000 3,000,000 1,900,0007214 - Building Improvements
1,500,000 3,000,000 1,900,000 6,400,000Total
Total20212022202320242025Funding Sources 2026
6,400,0001,500,000 3,000,000 1,900,0004401-Debt
1,500,000 3,000,000 1,900,000 6,400,000Total
Tuesday, January 19, 2021Page 402021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 0610 - Park Dept -General 010
Description
Replace 2001 Ford Workhouse Step Van. #401 equipment number.
Project #21 PRKS VEH1
Justification
This unit provides efficient operations in our fleet by housing tools and providing work space while on the job site. The vehicle is utilized by staff
throughout all seasons. Current unit has 39,000 miles and faulty mechanicals along with chasis deterior
Useful Life 10 years
Project Name Parks: Replace '01 Ford Workhorse Step Van #401 Category 7210 - Vehicles
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$60,000
MUNIS PROJ#:66112
MUNIS Acct #:0323-0610
Status Active
Total20212022202320242025Expenditures2026
60,00060,0007210 - Vehicles
60,000 60,000Total
Total20212022202320242025Funding Sources 2026
2,5002,5002000-Trade-In
57,50057,5004401-Debt
60,000 60,000Total
Tuesday, January 19, 2021Page 412021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 0610 - Park Dept -General 010
Description
Replace 1989 Topsoil Screener with 1,224 hours.
Project #21 PRKS VEH4
Justification
The Topsoil Screener is used frequently to process soil for department projects, grave restoration at cemeteries and stump grinding restoration. The
current unit has been used extensively by several departments and is in poor condition. It is well beyon
Useful Life 15 years
Project Name Parks: Replace '89 Topsoil Screener Category 7210 - Vehicles
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$28,000
MUNIS PROJ#:66113
MUNIS Acct #:0323-0610
Status Active
Total20212022202320242025Expenditures2026
28,00028,0007204 - Equipment/Machinery
28,000 28,000Total
Total20212022202320242025Funding Sources 2026
5005002000-Trade-In
27,50027,5004401-Debt
28,000 28,000Total
Tuesday, January 19, 2021Page 422021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 0650 - Cemetery
Description
Riverside Cemetery Roads Repaving. Repave deteriorating roads in Riverside Cemetery.
Project #00A CEM RDS
Justification
Roads within Riverside Cemetery continue to need repaving. Funds for repaving various portions of the roads is an expense requested by the
Department every other year. These funds pay for the materials and the Streets Division staff complete the paving.
Useful Life 25 years
Project Name Parks: Riverside Cemetery Roads Repaving Category 7218 - Road Improvements
Type Infrastructure - Replacement
PASER Rating:
CIP Proj. Score:65/200
Total Project Cost:$75,000
MUNIS PROJ#:63915 ANNUAL
MUNIS Acct #:0323-0650
Status Active
Total20212022202320242025Expenditures2026
75,00025,000 25,000 25,0007218 - Road Imprvmts
25,000 25,000 25,000 75,000Total
Total20212022202320242025Funding Sources 2026
75,00025,000 25,000 25,0004100-Levy
25,000 25,000 25,000 75,000Total
Tuesday, January 19, 2021Page 432021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Bike and Pedestrian Infrastructure. Provide designated funds for bicycle and pedestrian infrastructure improvements. Primary improvements will be
bicycle lane stripping and symbol, sharrow installation and bike facility signage for existing and future rou
Project #00A BKE PED
Justification
With the completion of the Tribal/WIOUWASH Trial over Lake Butte Des Morts, the ongoing Riverwalk developments and increases in
alternative transportation, we are experiencing an increase in bicycle users that do not have safe designated facilities. With
Useful Life 10 years
Project Name CD: Bicycle and Pedestrian Infrastructure Category 7218 - Road Improvements
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:90/200
Total Project Cost:$250,000
MUNIS PROJ#:61008 ANNUAL
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
250,00050,000 50,000 50,000 50,000 50,0007218 - Road Imprvmts
50,000 50,000 50,000 50,000 50,000 250,000Total
Total20212022202320242025Funding Sources 2026
250,00050,000 50,000 50,000 50,000 50,0004100-Levy
50,000 50,000 50,000 50,000 50,000 250,000Total
Tuesday, January 19, 2021Page 442021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Blight Removal Scattered Sites. Acquisition, demolition, and remediation with WDNR permitting/site closure. Oshkosh Avenue/Sawyer is one
location planned, funding was used for Buckstaff demo in 2017-2018. These sites would then be resold for private devel
Project #00A BLGT RM1
Justification
Implementation of the Healthy Neighborhoods through Acquisition/Demolition. Redevelopment of the sites could include commercial and
residential infill projects. Collaboration with local housing providers such as GO-HNI, Habitat for Humanity and Oshkosh Ho
Useful Life >50 years
Project Name CD: Blight Removal Scattered Sites Category 7216 - Land Improvements
Type Other
PASER Rating:n/a
CIP Proj. Score:90/200
Total Project Cost:$2,000,000
MUNIS PROJ#:63020 ANNUAL
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
2,000,000250,000 250,000 500,000 500,000 500,0006401 - Planning
250,000 250,000 500,000 500,000 500,000 2,000,000Total
Total20212022202320242025Funding Sources 2026
2,000,000250,000 250,000 500,000 500,000 500,0004100-Levy
250,000 250,000 500,000 500,000 500,000 2,000,000Total
Tuesday, January 19, 2021Page 452021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Gateway Blight Elimination. Acquisition and demolition of blighted structures along corridors to the City which include South Park Avenue and
9th Avenue.
Project #00A BLGT RM2
Justification
Blight removal is necessary to improve the appearance of these gateway corridors. South Park Avenue, 9th Avenue Corridor Plans and Imagine
Oshkosh indicate blight removal is necessary to improve the gateway corridors.
Useful Life >50 years
Project Name CD: Gateway Blight Elimination Category 7216 - Land Improvements
Type Other
PASER Rating:n/a
CIP Proj. Score:65/200
Total Project Cost:$1,250,000
MUNIS PROJ#:63020 ANNUAL
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
1,250,000250,000 250,000 250,000 250,000 250,0006401 - Planning
250,000 250,000 250,000 250,000 250,000 1,250,000Total
Total20212022202320242025Funding Sources 2026
1,250,000250,000 250,000 250,000 250,000 250,0004510-Debt: State Trust Fund
Loan
250,000 250,000 250,000 250,000 250,000 1,250,000Total
Tuesday, January 19, 2021Page 462021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Great Neighborhoods Initiative. Construct or plan neighborhood improvements that support the Healthy Neighborhood Initiative in concert with
Neighborhood Associations and neighborhood improvement partners. Projects are located in the right-of-way or on p
Project #00A G NHOODS
Justification
Implementation of the Healthy Neighborhoods Initiative, the City's Community Development Block Grant Program goals, the Housing Element of
the 2018 Comprehensive Plan, and the City Strategic Plan regarding redevelopment and revitalization of the existing
Useful Life >50 years
Project Name CD: Great Neighborhoods Initiative Category 7216 - Land Improvements
Type Other
PASER Rating:
CIP Proj. Score:95/200
Total Project Cost:$1,050,000
MUNIS PROJ#:63016 ANNUAL
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
1,050,000175,000 175,000 200,000 250,000 250,0007216 - Land Improvement
175,000 175,000 200,000 250,000 250,000 1,050,000Total
Total20212022202320242025Funding Sources 2026
1,050,000175,000 175,000 200,000 250,000 250,0004100-Levy
175,000 175,000 200,000 250,000 250,000 1,050,000Total
Tuesday, January 19, 2021Page 472021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Gateway improvements identified in Corridor Plans for 9th Avenue and South Park Avenue that include: Streetscape improvements such as street
markings/crossings, lighting signage, removing or undergrounding overhead utilities, landscaping and other right o
Project #00A GATE IMP
Justification
Visitors to the Central City would use one of these gateway corridors and public input and comments support improvements to the appearance of
these gateway corridors
Useful Life >50 years
Project Name CD: Gateway Improvements Category 7218 - Road Improvements
Type Infrastructure - Upkeep
PASER Rating:n/a
CIP Proj. Score:100/200
Total Project Cost:$1,000,000
MUNIS PROJ#:63021 ANNUAL
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
700,00050,000 50,000 100,000 100,000 200,0006401 - Planning 200,000
50,000 50,000 100,000 100,000 200,000 700,000Total200,000
Future
300,000
Total
Total20212022202320242025Funding Sources 2026
700,00050,000 50,000 100,000 100,000 200,0004100-Levy 200,000
50,000 50,000 100,000 100,000 200,000 700,000Total200,000
Future
300,000
Total
Tuesday, January 19, 2021Page 482021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Purchase and install riverwalk signage and banners, way-finding signage, kiosks, and signs bearing park regulations.
Document/Study/Planning Document: Riverwalk Corridor Design Guidelines
Project #00A RW SIGNS
Justification
The Fox River Corridor Riverwalk Plan identified the general design and location of wayfinding signs and kiosks in the riverwalk area. The sign
will direct travelers and boaters to the various businesses and points of interst along the riverwalk.
Useful Life 10 years
Project Name CD: Riverwalk Signage and Banners Category 7216 - Land Improvements
Type Asset - New
PASER Rating:n/a
CIP Proj. Score:70/200
Total Project Cost:$200,000
MUNIS PROJ#:63014 ANNUAL
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
200,00025,000 25,000 50,000 50,000 50,0006542 - Signage
25,000 25,000 50,000 50,000 50,000 200,000Total
Total20212022202320242025Funding Sources 2026
200,00025,000 25,000 50,000 50,000 50,0004100-Levy
25,000 25,000 50,000 50,000 50,000 200,000Total
Tuesday, January 19, 2021Page 492021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Jackson Street Corridor Safety Study Implementation. Based on the study completed in 2020, this project is implementing Phase 1 of reccomended
improvements to reduce speeding and increase safety along the Jackson Street corridor. The project cost include
Project #21 JSC PH1
Justification
Engineering and Planning Consultants worked closely with city staff and community groups to analyze and understand unique traffic and
pedestrian needs along the Jackson Corridor. FHWA makes a general statement that speed feedback signs have been effectiv
Useful Life 25 years
Project Name CD: Jackson St Corridor SftyStdy ImplementationPH1 Category 7218 - Road Improvements
Type Infrastructure - Replacement
PASER Rating:
CIP Proj. Score:80/200
Total Project Cost:$60,000
MUNIS PROJ#:63072
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
60,00060,0007216 - Land Improvement
60,000 60,000Total
Total20212022202320242025Funding Sources 2026
60,00060,0004401-Debt
60,000 60,000Total
Tuesday, January 19, 2021Page 502021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Construct a multimodal trail through Rainbow Park connecting Oshkosh Avenue to the City's riverwalk west to the Tribal Heritage Crossing Trail
and the Lakeshore Trail.
Project #21 MM TRL RB
Justification
The multimodal trail through Rainbow Park will create a looped local trail system that will help connect with the regional Wiouwash Trail system
and Sawyer Street bike lanes.
Useful Life 50 years
Project Name CD: Multimodal Trail Rainbow Park Category 7216 - Land Improvements
Type Infrastructure - New
PASER Rating:
CIP Proj. Score:120/200
Total Project Cost:$585,300
MUNIS PROJ#:63071
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
585,300585,3007216 - Land Improvement
585,300 585,300Total
Total20212022202320242025Funding Sources 2026
255,300255,3004260-Grant
330,000330,0004401-Debt
585,300 585,300Total
Tuesday, January 19, 2021Page 512021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
Riverwalk Construction S. Main St to Railroad Tracks. Build river walk and associated infrastructure necessary for the installation of the trail
including, but not limited to, river walk concrete, boardwalk, dredging, bank stabilization, seawall reconstru
Project #21 RW CONST1
Justification
Project is part of South Shore Redevelopment District Plan and the adopted Riverwalk Plan that calls for development of a riverfront trail on the
south side of the Fox River. Development of a riverfront trail east of S. Main and the removal of street imp
Useful Life 50 years
Project Name CD: Riverwalk Construction S. Main St to RR Tracks Category 7216 - Land Improvements
Type Infrastructure - New
PASER Rating:
CIP Proj. Score:100/200
Total Project Cost:$1,100,000
MUNIS PROJ#:63073
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
1,100,0001,100,0007216 - Land Improvement
1,100,000 1,100,000Total
Total20212022202320242025Funding Sources 2026
500,000500,0004260-Grant
600,000600,0004401-Debt
1,100,000 1,100,000Total
Tuesday, January 19, 2021Page 522021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 0740 - Community Developme
Description
South Main Acquisitions. Land acquisition, demolition, and remediation of properties along the east side of S. Main Street.
Project #21 S MAIN AQ
Justification
Critical for S. Main St reconstruction in 2023.
Useful Life >50 years
Project Name CD: South Main Acquisition Category 7216 - Land Improvements
Type Other
PASER Rating:
CIP Proj. Score:75/200
Total Project Cost:$1,000,000
MUNIS PROJ#:63070
MUNIS Acct #:0323-0740
Status Active
Total20212022202320242025Expenditures2026
1,000,000250,000 500,000 250,0007216 - Land Improvement
250,000 500,000 250,000 1,000,000Total
Total20212022202320242025Funding Sources 2026
1,000,000250,000 500,000 250,0004401-Debt
250,000 500,000 250,000 1,000,000Total
Tuesday, January 19, 2021Page 532021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 0801 - Traffic/Lighting
Description
This will involve the continual replacement of LED signal heads at city maintained traffic signals to maintain a state of good repair.
Project #00A SGNL HD
Justification
LED signal heads offer substantial savings in maintenance and energy consumption compared to conventional incandescent lamp signal heads.
The city switched to LED several years ago and the early generation LEDS are in need of replacement. It is critical
Useful Life 10 years
Project Name TR: LED Traffic Signal Head Equipment Category 6542 - Street Lighting
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:60/200
Total Project Cost:$50,000
MUNIS PROJ#:61005 ANNUAL
MUNIS Acct #:0323-0801
Status Active
Total20212022202320242025Expenditures2026
50,00010,000 10,000 10,000 10,000 10,0006542 - Signage
10,000 10,000 10,000 10,000 10,000 50,000Total
Total20212022202320242025Funding Sources 2026
50,00010,000 10,000 10,000 10,000 10,0004100-Levy
10,000 10,000 10,000 10,000 10,000 50,000Total
Tuesday, January 19, 2021Page 542021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 0801 - Traffic/Lighting
Description
The city owns over 1,000 street lighting poles. While the poles are expected to have a long service life, we do lose poles through damage from car
accidents (about 1/2 are hit and run/unrecoverable). In addition, we are working on expanding the number o
Project #00A ST POLES
Justification
We need to have an adequate supply to replace poles that are knocked down in addition to spreading the cost of new poles for expansion.
Useful Life 20 years
Project Name TR: Purchase Streetlighting Poles Category 6542 - Street Lighting
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:55/200
Total Project Cost:$125,000
MUNIS PROJ#:61002 ANNUAL
MUNIS Acct #:0323-0801
Status Active
Total20212022202320242025Expenditures2026
125,00025,000 25,000 25,000 25,000 25,0006542 - Signage
25,000 25,000 25,000 25,000 25,000 125,000Total
Total20212022202320242025Funding Sources 2026
125,00025,000 25,000 25,000 25,000 25,0004100-Levy
25,000 25,000 25,000 25,000 25,000 125,000Total
Tuesday, January 19, 2021Page 552021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 0801 - Traffic/Lighting
Description
This project would replace LED retrofit kits that are at the end of their useful life with LED fixtures. The first wave of LED street lights were
installed with retrofit kits instead of actual LED fixtures as a first step. LED fixtures are now more affo
Project #00A STR LGHT
Justification
Newer LED lights need less maintenance and last longer reducing ongoing costs. They also have better light performance
Useful Life 20 years
Project Name TR: LED Streetlighting Upgrades Category 6542 - Street Lighting
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:70/200
Total Project Cost:$50,000
MUNIS PROJ#:61004 ANNUAL
MUNIS Acct #:0323-0801
Status Active
Total20212022202320242025Expenditures2026
50,00010,000 10,000 10,000 10,000 10,0006542 - Signage
10,000 10,000 10,000 10,000 10,000 50,000Total
Total20212022202320242025Funding Sources 2026
50,00010,000 10,000 10,000 10,000 10,0004100-Levy
10,000 10,000 10,000 10,000 10,000 50,000Total
Tuesday, January 19, 2021Page 562021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 0801 - Traffic/Lighting
Description
This project pays for traffic signal equipment to be installed at various intersections as needed in order to repair knockdowns and/or replace
obsolete equipment. Typical purchases include poles, cabinets, controllers, and vehicle detection equipment.
Project #00A TR SGNL
Justification
Signal infrastructure equipment can last 20-25 years and is a long-term capital investment. It should be noted that additional funding would be
requested for new signals or required upgrades once locations are known.
Useful Life 20 years
Project Name TR: Traffic Signal Equipment Category 6542 - Street Lighting
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:55/200
Total Project Cost:$225,000
MUNIS PROJ#:61003 ANNUAL
MUNIS Acct #:0323-0801
Status Active
Total20212022202320242025Expenditures2026
225,00045,000 45,000 45,000 45,000 45,0006542 - Signage
45,000 45,000 45,000 45,000 45,000 225,000Total
Total20212022202320242025Funding Sources 2026
225,00045,000 45,000 45,000 45,000 45,0004100-Levy
45,000 45,000 45,000 45,000 45,000 225,000Total
Tuesday, January 19, 2021Page 572021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 0810 - Sign Dept
Description
This replaces truck #522, a 2004 service truck that is at the end of its useful life. The new truck will be a 1 to 1 1/2 ton pick-up with service body
for use in sign installation and maintenance.
Project #21 VEH SIGN1
Justification
This truck is used by the sign department for installation and maintenance of signs as well as street painting.
Useful Life 10 years
Project Name TR: Sign Service Truck 1 to 1 1/2 Tn (repl 2004)Category 7210 - Vehicles
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:n/a
Total Project Cost:$90,000
MUNIS PROJ#:66116
MUNIS Acct #:0323-0810
Status Active
Total20212022202320242025Expenditures2026
90,00090,0007210 - Vehicles
90,000 90,000Total
Total20212022202320242025Funding Sources 2026
90,00090,0004401-Debt
90,000 90,000Total
Tuesday, January 19, 2021Page 582021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact General Services Manager
Data in Year 2021 Department 1020 - Grand Opera House
Description
The Grand Opera House Foundation is seeking to update three exterior signs on the Grand exterior (an electronic messaging board) on the west
wall, a "blade" sign on the side side, and signage over the front steps. The Foundation has shared sign designs w
Project #21 GOH SIGNS
Justification
Staff has been told the Landmarks Commission feels the sign designs, color and style are in concert with this historic building. Staff have yet to
confirm installation details and any State Historical Preservation Office review of this project.
Useful Life 20 years
Project Name GS: Grand Opera House Signage Updates Category 7214 - Buildings
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:75/200
Total Project Cost:$75,000
MUNIS PROJ#:63004
MUNIS Acct #:0322-1020
Status Active
Total20212022202320242025Expenditures2026
75,00075,0007214 - Building Improvements
75,000 75,000Total
Total20212022202320242025Funding Sources 2026
75,00075,0004950-Donations
75,000 75,000Total
Tuesday, January 19, 2021Page 592021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact General Services Manager
Data in Year 2021 Department 1020 - Grand Opera House
Description
A 2020 assessment of the stage floor (circa 1986) confirmed the hardwood floor is in need of full replacement with cracked, splintered and flaking
wood evident throughout the stage area. Replacement would include removing the existing floor, patching the
Project #21 GOH STAGE
Justification
New stage flooring will eliminate safety concerns with the current flooring and improve the functionality and appearance of the stage for
performances.
Useful Life 25 years
Project Name GS: Grand Opera House Stage Floor Replacement Category 7214 - Buildings
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:95/200
Total Project Cost:$35,000
MUNIS PROJ#:63004
MUNIS Acct #:0322-1020
Status Active
Total20212022202320242025Expenditures2026
35,00035,0007214 - Building Improvements
35,000 35,000Total
Total20212022202320242025Funding Sources 2026
10,00010,0004950-Donations
25,00025,0004100-Levy
35,000 35,000Total
Tuesday, January 19, 2021Page 602021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 1040 - TIF Improvements
Description
Grove Street Infrastructure. This is a portion of the former Mercy Medical Center site. This block frontage along Grove Street was never
redeveloped by the developer who acquired the site. The City acquired this block from Winnebago County due to forecl
Project #21 TIF14GRV
Justification
Assist developer with site preparation costs -- storm water management, site preparation / environmental issues. Reimburse developer for eligible
site preparation costs for construction of single family homes and/or twindos.
Useful Life >50 years
Project Name CD: TIF 14 Grove St Infrastructure Category 7216 - Land Improvements
Type Other
PASER Rating:n/a
CIP Proj. Score:110/200
Total Project Cost:$400,000
MUNIS PROJ#:67005
MUNIS Acct #:0522-1040
Status Active
Total20212022202320242025Expenditures2026
400,000200,000 200,0007216 - Land Improvement
200,000 200,000 400,000Total
Total20212022202320242025Funding Sources 2026
400,000200,000 200,0001414-TID #14 Cash
200,000 200,000 400,000Total
Tuesday, January 19, 2021Page 612021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 1040 - TIF Improvements
Description
Permanent and temporary signs to identify and market the existing City owned industrial and business parks.
Project #21 TIF19 SIG
Justification
Signs have proven to assist in land marketing and sales for City industrial and business parks.
Useful Life >50 years
Project Name CD: TIF19 Industrial Park Signs Category 7216 - Land Improvements
Type Other
PASER Rating:n/a
CIP Proj. Score:55/200
Total Project Cost:$20,000
MUNIS PROJ#:67006
MUNIS Acct #:0528-1040
Status Active
Total20212022202320242025Expenditures2026
20,00020,0007216 - Land Improvement
20,000 20,000Total
Total20212022202320242025Funding Sources 2026
20,00020,0001419-TID #19 Cash
20,000 20,000Total
Tuesday, January 19, 2021Page 622021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Community Development Dire
Data in Year 2021 Department 1040 - TIF Improvements
Description
South Shore and Sawdust District Redevelopment Sites. Land acquisition, demolition, and remediation of multiple sites in the South Shore
Redevelopment Area including but not limited to blighted industrial, commercial and residential sites. Examples: Pione
Project #21 TIF20 SS
Justification
Implementation of the river walk plan, redevelopment of the south shore as part of the south shore redevelopment area, and TIF Plan #20 for the
redevelopment and revitalization of the south shore of the Fox River. Departemnt of Public Works demolishes bui
Useful Life >50 years
Project Name CD: TIF20 South Shore & Sawdust Dist Redevelopment Category 7216 - Land Improvements
Type Other
PASER Rating:n/a
CIP Proj. Score:60/200
Total Project Cost:$2,000,000
MUNIS PROJ#:67004
MUNIS Acct #:0534-1040
Status Active
Total20212022202320242025Expenditures2026
2,000,000400,000 400,000 400,000 400,000 400,0007216 - Land Improvement
400,000 400,000 400,000 400,000 400,000 2,000,000Total
Total20212022202320242025Funding Sources 2026
2,000,000400,000 400,000 400,000 400,000 400,0001400-TID Cash
400,000 400,000 400,000 400,000 400,000 2,000,000Total
Tuesday, January 19, 2021Page 632021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact General Services Manager
Data in Year 2021 Department 1040C - Convention Center
Description
The air handler units above the mezzanine within the ballroom of the Convention Center are over 30 years old and need to be replaced due to their
age and condition. The units are very noisy and impeed the ability of patrons being able to hear presenters
Project #21 OCC AHU
Justification
Staff recommends having the units replaced to improve the efficiency of the HVAC system and reduce unnecessary noise when the units are
running.
Useful Life 20 years
Project Name GS: Conv CTR Air Handler Unit (Mezzanine) Rplcmnt Category 7214 - Buildings
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:90/200
MUNIS PROJ#:63008
MUNIS Acct #:0322-1040
Status Active
Total20212022202320242025Expenditures2026
200,000200,0007214 - Building Improvements
200,000 200,000Total
Total20212022202320242025Funding Sources 2026
200,000200,0003000-Prior Year Funding
200,000 200,000Total
Tuesday, January 19, 2021Page 642021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Library Director
Data in Year 2021 Department 1060 - Library
Description
Replace emergency generator system due to obsolescence / maintenance challenges to the Ford diesel motor that powers the system.
Project #21 LIB GENER
Justification
Emergency electrical generation is a safety condition for building occupancy.
Useful Life 20 years
Project Name LIB: Replace Emergency Electric Generator Sys Category 7214 - Buildings
Type Facility - Upkeep
PASER Rating:n/a
CIP Proj. Score:70/200
Total Project Cost:$40,600
MUNIS PROJ#:63160
MUNIS Acct #:0323-1060
Status Active
Total20212022202320242025Expenditures2026
40,60040,6007214 - Building Improvements
40,600 40,600Total
Total20212022202320242025Funding Sources 2026
40,60040,6004401-Debt
40,600 40,600Total
Tuesday, January 19, 2021Page 652021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Museum Director
Data in Year 2021 Department 1070 - Museum
Description
This request is for the design development phase (planning) of the next long-term exhibition, called Deep Roots, Growing City. The Museum
would continue to engage Split Rock Studios for the design work and undertake media work with staff. This project is
Project #21 DP ROOTS
Justification
This exhibition is the replacement for Memories & Dreams, which is 22 years old and does not work with K-12 curriculum, uses outdated
interpretive techniques, and does not effectively attract or engage visitors. Deep Roots, Growing City continues the stor
Useful Life 20 years
Project Name MUSM: Deep Roots, Growing City Exhibition Category 7206 - Capital Construction
Type Other
PASER Rating:
CIP Proj. Score:50/200
Total Project Cost:$1,000,000
MUNIS PROJ#:11223
MUNIS Acct #:0323-1070
Status Active
Total20212022202320242025Expenditures2026
1,000,000100,000 100,000 800,0007222 - Exhibit
100,000 100,000 800,000 1,000,000Total
Total20212022202320242025Funding Sources 2026
1,000,000100,000 100,000 800,0001000-Operations
100,000 100,000 800,000 1,000,000Total
Tuesday, January 19, 2021Page 662021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 1717 - Parking Utility
Description
This is an annual amount budgeted to fund the reconstruction of municipal parking lots. Projects are prioritized using the Assessment of municipal
parking lots study performed by Jewell and Associates. The study was updated in 2020.
Project #00A PRKG LOT
Justification
Municipal parking lots are an asset to the city that must be maintained. Adequate parking is vital to encourage and accommodate visitors to the
city including downtown. Adequate parking is also needed for employees and guests of city facilities. The pa
Useful Life 20 years
Project Name TR: Parking Lot Improvements Category 7216 - Land Improvements
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:105/200
Total Project Cost:$2,500,000
MUNIS PROJ#:63001 ANNUAL
MUNIS Acct #:0323-1717
Status Active
Total20212022202320242025Expenditures2026
2,500,000500,000 500,000 500,000 500,000 500,0007216 - Land Improvement
500,000 500,000 500,000 500,000 500,000 2,500,000Total
Total20212022202320242025Funding Sources 2026
2,500,000500,000 500,000 500,000 500,000 500,0004401-Debt
500,000 500,000 500,000 500,000 500,000 2,500,000Total
Tuesday, January 19, 2021Page 672021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 1728 - Transit
Description
This project pays for transit shelters, paving, and curbing improvements to bring high usage transit stops in compliance with ADA. Locations are
prioritized based on the stop accessibility survey in conjuction with ridership.
Project #00A TR STPIM
Justification
The survey done by ECWRPC along with the TDP identified numerous transit stops which are not compliant with ADA. We must continue to
improve these stops. Accessiblity to stops also enhances the safety and comfort of riders which helps sustain and potent
Useful Life 20 years
Project Name TR: Transit Stop Improvements Category 7216 - Land Improvements
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:65/200
Total Project Cost:$50,000
MUNIS PROJ#:63003 ANNUAL
MUNIS Acct #:0322-1728
Status Active
Total20212022202320242025Expenditures2026
50,00010,000 10,000 10,000 10,000 10,0007216 - Land Improvement
10,000 10,000 10,000 10,000 10,000 50,000Total
Total20212022202320242025Funding Sources 2026
50,00010,000 10,000 10,000 10,000 10,0001510-Transit Fund
10,000 10,000 10,000 10,000 10,000 50,000Total
Tuesday, January 19, 2021Page 682021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 1728 - Transit
Description
Adds an automated wheelchair securement system to each of the 12 newer buses, one system per bus.
Project #21 AUT WHLCH
Justification
Drivers currently secure wheelchairs by hand requiring very close and personal interactions. This project would install a Quantum Automatic
Wheelchair securement system in each bus. There would be one per bus. The system allows passengers to secure the
Useful Life 15 years
Project Name TR: Automated Wheelchair Securement Sys 12 buses Category 7204 - Machinery & Equip
Type Infrastructure - Upkeep
PASER Rating:
CIP Proj. Score:n/a
Total Project Cost:$180,000
MUNIS PROJ#:11107
MUNIS Acct #:0511-1728
Status Active
Total20212022202320242025Expenditures2026
180,000180,0007214 - Building Improvements
180,000 180,000Total
Prior
180,000
Total
Tuesday, January 19, 2021Page 692021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 1728 - Transit
Description
This project replaces the 2010 buses that have passed their useful life. These buses are hybrids that are experiencing mechanical failures due to age
and worn out parts. Repairs are very costly on hybrid buses. We have two active grants to replace 2 of
Project #21 TR BUSES
Justification
Heavy duty buses have a useful life of 12 years. We are required to maintain our fleet in a state of good repair. These new buses preserve our
fleet's high level of reliability. The purchase will also reduce maintenance costs, emmision and improve fuel
Useful Life 12 years
Project Name TR: 2 hybrid & 2 clean diesel buses (repl 2010's)Category 7210 - Vehicles
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:90/200
Total Project Cost:$2,600,000
MUNIS PROJ#:11106
MUNIS Acct #:0511-1728/0322
Status Active
Total20212022202320242025Expenditures2026
2,600,0002,600,0007204 - Equipment/Machinery
2,600,000 2,600,000Total
Total20212022202320242025Funding Sources 2026
834,800834,8004260-Grant
56,06156,0614401-Debt
890,861 890,861Total
Prior
1,709,139
Total
Tuesday, January 19, 2021Page 702021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 1728 - Transit
Description
Replace 1993 Komatsu FD 25VT-11 Diesel 6,000 lbs capacity
Project #21 TR FRKLFT
Justification
The forklift is used to load and unload trucks as well as aid in transit vehicle and building maintenance and repairs. This forklift is also used by the
sign/electric shop and water distribution facility.
Useful Life 20 years
Project Name TR: Forklift (repl 1993 Komatsu FD 25VT-11 Diesel)Category 7204 - Machinery & Equip
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$35,000
MUNIS PROJ#:11107
MUNIS Acct #:0511-1728
Status Active
Total20212022202320242025Expenditures2026
35,00035,0007204 - Equipment/Machinery
35,000 35,000Total
Prior
35,000
Total
Tuesday, January 19, 2021Page 712021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 1728 - Transit
Description
Mobile Fares are a way to purchase fares via a mobile device and/or vending machine and supplement the manual farebox.
Project #21 TRAN FARE
Justification
Mobile Fares will make the purchase and use of fares more efficient and effective. Mobile/Automatic Fares will also reduce driver interaction.
Useful Life 10 years
Project Name TR: Electronic Fare Readers/Farebox for Buses Category 7204 - Machinery & Equip
Type Other
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$200,000
MUNIS PROJ#:65902
MUNIS Acct #:0322-1728
Status Active
Total20212022202320242025Expenditures2026
200,000200,0007204 - Equipment/Machinery
200,000 200,000Total
Total20212022202320242025Funding Sources 2026
160,000160,0004260-Grant
40,00040,0003000-Prior Year Funding
200,000 200,000Total
Tuesday, January 19, 2021Page 722021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Transit Director
Data in Year 2021 Department 1728 - Transit
Description
The current transit center is nothing more than a transfer location with a heated shelter and driver restroom. There is a need for a driver breakroom,
a pass sales/customer service presence and a supervisor office. A public restroom may or may not be ne
Project #21 TRANS CTR
Justification
The construction of a downtown transit center would allow for customer interaction and a sales outlet downtown. It will also provide space for the
driver supervisor to work from, a driver breakroom, and possibly a public restroom. It is possible that ot
Useful Life 30 years
Project Name TR: Downtown Transit Center Category 7214 - Buildings
Type Facility - Upkeep
PASER Rating:n/a
CIP Proj. Score:100/200
Total Project Cost:$2,320,000
MUNIS PROJ#:11109
MUNIS Acct #:0511-1728
Status Active
Total20212022202320242025Expenditures2026
2,320,0002,320,0007202 - Office Equipment
2,320,000 2,320,000Total
Total20212022202320242025Funding Sources 2026
520,000520,0004260-Grant
520,000 520,000Total
Prior
1,800,000
Total
Tuesday, January 19, 2021Page 732021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1810 - Water
Description
Construct a heated storage building to store materials and fleet vehicles. In 2021, design services are planned. Construction is planned to be
performed in 2022.
Project #21 WD ST BDG
Justification
Water Distribution needs additional storage to store larger new equipment and materials. A study will be performed in 2020 to determine location
and size needs.
Useful Life 40 years
Project Name WD: Heated Storage Building Category 7214 - Buildings
Type Facility - New
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$470,000
MUNIS PROJ#:64001
MUNIS Acct #:0322-1810
Status Active
Total20212022202320242025Expenditures2026
440,00090,000 350,0006803 - Water
90,000 350,000 440,000Total
Prior
30,000
Total
Total20212022202320242025Funding Sources 2026
440,00090,000 350,0004540 - Water Revenue Bonds
90,000 350,000 440,000Total
Prior
30,000
Total
Tuesday, January 19, 2021Page 742021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1810 - Water
Description
This will replace #830, a 2010 3/4-ton CNG full-size van, with a 1/2-ton work van. This vehicle is primarily used as a meter technician van or for
daily hydrant flushing.
Project #21 WD VEH1
Justification
A 1-ton vehicle is no longer needed for the duties performed by this vehicle. The life to date cost of maintenance and repair of this vehicle is $0.09
per mile. In 2019, this cost rose to $0.22 per mile. The newer Ford Transit 1/2-ton meter vans get ar
Useful Life 10-15 years
Project Name WD: #830, 3/4-Ton CNG Full-Size Van Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$44,000
MUNIS PROJ#:66031 ANNUAL
MUNIS Acct #:0322-1810
Status Active
Total20212022202320242025Expenditures2026
44,00044,0007204 - Equipment/Machinery
44,000 44,000Total
Total20212022202320242025Funding Sources 2026
42,00042,0001540-Water Utility Fund
2,0002,0002000-Trade-In
44,000 44,000Total
Tuesday, January 19, 2021Page 752021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1810 - Water
Description
The Water Filtration Plant has three concrete structures on site called clearwells that store 2.4 million gallons of treated drinking water. This water
is pumped into the water distribution system to maintain pressure for water use by consumers and for f
Project #21 WF CLRWLL
Justification
A portion of the existing clearwell structures are below ground and do not meet the WDNR regulation that requires a two-foot separation between
the bottom of a tank and the groundwater. This has been noted in the WDNR Sanitary Survey as a deficiency star
Useful Life 50 years
Project Name WFP: Clearwell Replacement Category 7214 - Buildings
Type Infrastructure - Replacement
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$22,000,000
MUNIS PROJ#:64002
MUNIS Acct #:0322-1810
Status Active
Total20212022202320242025Expenditures2026
22,000,00010,000,000 8,000,000 4,000,0007206 - Capital Const
10,000,000 8,000,000 4,000,000 22,000,000Total
Total20212022202320242025Funding Sources 2026
22,000,00010,000,000 8,000,000 4,000,0004545-Safe Drinking Water
Loan
10,000,000 8,000,000 4,000,000 22,000,000Total
Tuesday, January 19, 2021Page 762021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1810 - Water
Description
Re-configure the connection of the 36" intake to bypass Miller's Bay and upgrade existing intake to meet current requirements. In 2021, study and
design services are planned. Construction is planned to be performed in 2022.
Project #21 WF M BAY
Justification
The 24" backup intakes are in failing condition, and we are in need of a backup raw water intake. The 36" intake is in place, but we cannot use it,
since it utilitizes the Miller's Bay Sedimentation Basin. Re-configuring the intake will allow us to util
Useful Life 50 years
Project Name WFP: 36" Intake Miller's Bay Bypass Category 7206 - Capital Construction
Type Asset - Upkeep
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$2,300,000
MUNIS PROJ#:64110
MUNIS Acct #:0322-1810
Status Active
Total20212022202320242025Expenditures2026
2,300,000300,000 2,000,0007206 - Capital Const
300,000 2,000,000 2,300,000Total
Total20212022202320242025Funding Sources 2026
2,300,000300,000 2,000,0004540 - Water Revenue Bonds
300,000 2,000,000 2,300,000Total
Tuesday, January 19, 2021Page 772021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1810 - Water
Description
The Fernau Water Tower is due for a complete re-painting (inside and outside). Adding mixing will improve water quality and the disinfecting
process. In 2021, engineering services are planned. Contractor services are planned to be performed in 2022.
Project #21 WF TWR FE
Justification
The tower was last painted in 2001 during original construction. Painting is needed to protect the tower's metal surfaces.
Document/Study/Planning Document: Water Utility Asset Management Plan Update (2015 and 2020 draft)
Useful Life 15 years
Project Name WFP: Re-Paint Fernau Water Tower and Add Mixing Category 7214 - Buildings
Type Infrastructure - Upkeep
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$1,200,000
MUNIS PROJ#:64003
MUNIS Acct #:0322-1810
Status Active
Total20212022202320242025Expenditures2026
1,200,00075,000 1,125,0007214 - Building Improvements
75,000 1,125,000 1,200,000Total
Total20212022202320242025Funding Sources 2026
1,200,00075,000 1,125,0001540-Water Utility Fund
75,000 1,125,000 1,200,000Total
Tuesday, January 19, 2021Page 782021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1810 - Water
Description
The Washburn Water Tower is due for a complete re-painting (inside and outside). Adding mixing will improve water quality and the disinfecting
process.
Project #21 WF TWR WS
Justification
Purpose is to protect the tower's metal surfaces. This project was originally budgeted in 2020, but was not done due to estimated project cost being
more than was originally budgeted.
Document/Study/Planning Document: Water Utility Asset Management P
Useful Life 15 years
Project Name WFP: Re-Paint Washburn Water Tower and Add Mixing Category 7214 - Buildings
Type Infrastructure - Upkeep
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$1,100,000
MUNIS PROJ#:64003
MUNIS Acct #:0322-1810
Status Active
Total20212022202320242025Expenditures2026
1,100,0001,100,0007214 - Building Improvements
1,100,000 1,100,000Total
Total20212022202320242025Funding Sources 2026
380,000380,0001540-Water Utility Fund
380,000 380,000Total
Prior
720,000
Total
Tuesday, January 19, 2021Page 792021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1810 - Water
Description
This will replace #891, 2010 Ford, with a 3/4-ton 4x4 short-box pickup truck.
Project #21 WF VEH1
Justification
This pickup truck is over 10 years old. The undercarriage is rusted. Unit has issues with 4-wheel drive auto-locking hubs.
Useful Life 10-15 years
Project Name WFP: #891, 3/4-Ton 4x4 Pickup Truck Category 7210 - Vehicles
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$50,000
MUNIS PROJ#:66131 ANNUAL
MUNIS Acct #:0322-1810
Status Active
Total20212022202320242025Expenditures2026
50,00050,0007204 - Equipment/Machinery
50,000 50,000Total
Total20212022202320242025Funding Sources 2026
47,00047,0001540-Water Utility Fund
3,0003,0002000-Trade-In
50,000 50,000Total
Tuesday, January 19, 2021Page 802021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
An outside contractor will be hired to do a condition assessment on pipes in the pipe gallery of the WWTP.
Project #21 WW ASSESS
Justification
The pipes are original to the structure, 1974 ductile iron. A condition assessment is needed to determine the maintenance and repair or replacement
schedule.
Useful Life 10 years
Project Name WW: Assessment of WWTP Piping Condition Category 7214 - Buildings
Type Facility - Upkeep
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$30,000
MUNIS PROJ#:64150
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
30,00030,0007204 - Equipment/Machinery
30,000 30,000Total
Total20212022202320242025Funding Sources 2026
30,00030,0001550-Sewer Utility Fund
30,000 30,000Total
Tuesday, January 19, 2021Page 812021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
Replace the make-up air unit at the Broad Street Pump Station.. It was installed in 1985.
Project #21 WW BR PS1
Justification
This is original equipment and has surpassed its useful life (rusting out) and needs to be replaced.
Document/Study/Planning Document: Asset Management Plan (Jacobs - 2017)
Useful Life 20 years
Project Name WW: Repl Broad St Pump Station Make-up Air Unit #1 Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$15,000
MUNIS PROJ#:65153
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
15,00015,0007204 - Equipment/Machinery
15,000 15,000Total
Total20212022202320242025Funding Sources 2026
15,00015,0001550-Sewer Utility Fund
15,000 15,000Total
Tuesday, January 19, 2021Page 822021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
Chlorine gas has been used for effluent disinfection since 1975, with an upgrade to a vacuum system in 1992. This project includes the installation
of an Emergency Chlorine Scrubber, relocation of the vacuum regulators for the chlorine ton cylinders, a n
Project #21 WW CF SYS
Justification
Updates were made to the feed system in 2007, and now individual chlorine vacuum feed regulators and new piping for improved safety and
efficiency are needed.
Document/Study/Planning Document: Asset Management Plan (Jacobs - 2017)
Useful Life 15 years
Project Name WW: Chlorine Feed System Upgrade Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$555,000
MUNIS PROJ#:65008
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
555,000555,0007204 - Equipment/Machinery
555,000 555,000Total
Total20212022202320242025Funding Sources 2026
555,000555,0004550-Sewer Revenue Bonds
555,000 555,000Total
Tuesday, January 19, 2021Page 832021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
Replace the floors of Clarifiers #1, #2, #3, and #4. Each clarifier is 96' in diameter and areas of the top surface of the concrete floors need to be
repaired and re-grouted to fill in the voids. Construction is planned to be performed in 2021 and 2022.
Project #21 WW CLRFRS
Justification
The current concrete floors are in poor condition and will need to be replaced to improve operational efficiency.
Useful Life 30 years
Project Name WW: Clarifiers #1, #2, #3, & #4 Floor Replacement Category 7214 - Buildings
Type Asset - Upkeep
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$900,000
MUNIS PROJ#:64006
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
900,000450,000 450,0007214 - Building Improvements
450,000 450,000 900,000Total
Total20212022202320242025Funding Sources 2026
900,000450,000 450,0004550-Sewer Revenue Bonds
450,000 450,000 900,000Total
Tuesday, January 19, 2021Page 842021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
A full facility assessment of the WWTP concrete needs to be completed.
Project #21 WW CONCRT
Justification
The concrete in this facility is 45 years old and is showing signs of fatigue. There are a few leaks in the expansion joints that were not replaced in
2012.
Useful Life 25 years
Project Name WW: WWTP Concrete Condition Assessment Category 7214 - Buildings
Type Infrastructure - Upkeep
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$23,000
MUNIS PROJ#:64150
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
23,00023,0007214 - Building Improvements
23,000 23,000Total
Total20212022202320242025Funding Sources 2026
23,00023,0001550-Sewer Utility Fund
23,000 23,000Total
Tuesday, January 19, 2021Page 852021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
The Septic Hauler and Street Sweepers Dump Site at the Wastewater Treatment Plant is used by Public Works and other waste haulers. This
project will segregate the waste stream from the Wastewater Treatment Plant. This project will be funded equally by t
Project #21 WW DUMP
Justification
This current site is too small, provides no availability for flow monitoring or sampling, and is not protected from rainfall. The co-mingling of
wastes and the introduction of rainfall creates waste that has high concentrations of nutrients and heavy met
Useful Life 50 years
Project Name WW: Update/Relocation of Dump Site Category 7216 - Land Improvements
Type Facility - Replacement
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$2,000,000
MUNIS PROJ#:64005
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
1,000,0001,000,0006804 - Storm
1,000,0001,000,0006802 - Sanitary
2,000,000 2,000,000Total
Total20212022202320242025Funding Sources 2026
1,000,0001,000,0004550-Sewer Revenue Bonds
1,000,0001,000,0004560-Storm Revenue Bonds
2,000,000 2,000,000Total
Tuesday, January 19, 2021Page 862021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
Replace select entrance switchgear and Motor Control Centers. In 2021, design services are planned. Construction is planned to be performed in
2022 and 2023. A substantial amount of the electrical substation equipment within the Wastewater Treatment Pl
Project #21 WW EUSS
Justification
This electrical equipment is about 45 years old and while well maintained, it needs to be replaced due to equipment obsolescence issues.
Replacement will improve power distribution system reliability.
Document/Study/Planning Document: Asset Managemen
Useful Life 30-50 years
Project Name WW: Replace Electrical Unit Substations Category 7214 - Buildings
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$7,665,500
MUNIS PROJ#:65151
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
7,665,500890,000 2,593,500 4,182,0007204 - Equipment/Machinery
890,000 2,593,500 4,182,000 7,665,500Total
Total20212022202320242025Funding Sources 2026
7,665,500890,000 2,593,500 4,182,0004550-Sewer Revenue Bonds
890,000 2,593,500 4,182,000 7,665,500Total
Tuesday, January 19, 2021Page 872021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
Add platform, handrail, and ship ladder to pump room in order to access 36" valve by ceiling. The valve is equipped with remote operation
equipment. However, over the past few years, staff have needed to access the valve to manually close it, due to deb
Project #21 WW LADDR
Justification
Currently, if we need to operate the valve in hand mode or manual operation, we need to tie off and crawl across a pipe 40' above the floor. This is
for the safety of the plant staff.
Useful Life 50 years
Project Name WW: Add Ladder Access in WWTP Pump Room Category 7214 - Buildings
Type Facility - Upkeep
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$13,000
MUNIS PROJ#:64150
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
13,00013,0007214 - Building Improvements
13,000 13,000Total
Total20212022202320242025Funding Sources 2026
13,00013,0001550-Sewer Utility Fund
13,000 13,000Total
Tuesday, January 19, 2021Page 882021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
The polymer mixing systems were originally installed during the 1997 WWTP digester upgrade. The system includes a dry polymer wetting
system, polymer-aging tank with mixer, aged-polymer storage, polymer-feed pumps, and a dry-polymer hoist. In 2021, desi
Project #21 WW PM SYS
Justification
The existing polymer system has surpassed its useful life and has become unreliable. This results in increased polymer usage, leading to additional
costs. The new system will improve reliability, reduce maintenance, and decrease polymer usage.
Docume
Useful Life 20 years
Project Name WW: Replace Polymer Mixing System Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$420,000
MUNIS PROJ#:65152
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
420,00050,000 370,0007204 - Equipment/Machinery
50,000 370,000 420,000Total
Total20212022202320242025Funding Sources 2026
420,00050,000 370,0004550-Sewer Revenue Bonds
50,000 370,000 420,000Total
Tuesday, January 19, 2021Page 892021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
Replace computers with updated hardware and software to maintain dependability.
Project #21 WW PUTERS
Justification
Computers need to be updated to prevent operating system obsolescence.
Useful Life 5 years
Project Name WW: Replace Computers and Related Equipment Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$25,000
MUNIS PROJ#:64150
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
25,00025,0007204 - Equipment/Machinery
25,000 25,000Total
Total20212022202320242025Funding Sources 2026
25,00025,0001550-Sewer Utility Fund
25,000 25,000Total
Tuesday, January 19, 2021Page 902021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 1910 - Sewer
Description
This will replace #172, a 2004 Toro Zero-Turn lawn mower with 60" deck.
Project #21 WW VEH1
Justification
The oroginal Toro has high hours and has had multiple repairs over the last few years.
Useful Life 15 years
Project Name WW: #172, Zero-Turn Lawn Mower Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:
Total Project Cost:$11,300
MUNIS PROJ#:66150
MUNIS Acct #:0322-1910
Status Active
Total20212022202320242025Expenditures2026
11,30011,3007204 - Equipment/Machinery
11,300 11,300Total
Total20212022202320242025Funding Sources 2026
1,5001,5002000-Trade-In
9,8009,8004550-Sewer Revenue Bonds
11,300 11,300Total
Tuesday, January 19, 2021Page 912021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Public Works Director
Data in Year 2021 Department 2010 - Storm Water
Description
This will replace #100, a 2009 Toro zero-turn mower.
Project #21 SW VEH1
Justification
It has 2,251 hours on it. The throttle and choke cables for the engine regularly fail. The metal for mower deck is fatigued and cracks often.
Useful Life 10 years
Project Name SW: #100, Zero-Turn Mower Category 7204 - Machinery & Equip
Type Equipment
PASER Rating:n/a
CIP Proj. Score:n/a
Total Project Cost:$10,000
MUNIS PROJ#:66140
MUNIS Acct #:0322-2010
Status Active
Total20212022202320242025Expenditures2026
10,00010,0007204 - Equipment/Machinery
10,000 10,000Total
Total20212022202320242025Funding Sources 2026
10,00010,0004560-Storm Revenue Bonds
10,000 10,000Total
Tuesday, January 19, 2021Page 922021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 6610 - Park Land Imprv (0325
Description
Menominee Park Trail Improvements/drainage. Improve the drainage in the park in select areas between Melvin Avenue and Nevada Avenue to
alleviate ponding of water on the park trail sections. Working with engineering and storm water staff, a drainage sys
Project #21 MP TRL IM
Justification
Due to poor drainage in the park in this area, water tends to pond on the trail throughout the year making it unuseable at times. This has been a
concern of trail and park users for some time.
Useful Life 25 years
Project Name Parks: Menominee Park Trail Improvements/drainage Category 7216 - Land Improvements
Type Infrastructure - New
PASER Rating:n/a
CIP Proj. Score:70/200
Total Project Cost:$75,000
MUNIS PROJ#:62010
MUNIS Acct #:0325-0610
Status Active
Total20212022202320242025Expenditures2026
75,00075,0007214 - Building Improvements
75,000 75,000Total
Total20212022202320242025Funding Sources 2026
75,00075,0004401-Debt
75,000 75,000Total
Tuesday, January 19, 2021Page 932021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 6610 - Park Land Imprv (0325
Description
Riverwalk Light Bollards Replacement. Replacement and inventory of light bollards along the Fox River Riverwalk.
Project #21 RW BOLRDS
Justification
With the oldest section of the riverwalk being over 10 years old, the light bollards in various sections have started to fail or get vandalized. There
is currently not an inventory of bollards to replace the ones currently not working nor for any that wi
Useful Life 10 years
Project Name Parks: Riverwalk Light Bollards Replacement Category 7216 - Land Improvements
Type Asset - Replacement
PASER Rating:
CIP Proj. Score:70/200
Total Project Cost:$25,000
MUNIS PROJ#:62005
MUNIS Acct #:0325-0610
Status Active
Total20212022202320242025Expenditures2026
25,00025,0007216 - Land Improvement
25,000 25,000Total
Total20212022202320242025Funding Sources 2026
25,00025,0004100-Levy
25,000 25,000Total
Tuesday, January 19, 2021Page 942021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 6610 - Park Land Imprv (0325
Description
South Park Tennis Court Reconstruction. A component of the South Park Master Plan is to reconstruct the existing tennis courts and replace the
fencing. These courts are heavily used by the community and the Recreation Department summer tennis program.
Project #21 SP TEN CT
Justification
The courts are due for resurfacing due to the age and use. Numerous cracks are present and the court lines are severely faded. With the increased
popularity of pickleball, more pickleball courts are needed in the city. This project will include construct
Useful Life 20 years
Project Name Parks: South Park Tennis Court Reconstruction Category 7216 - Land Improvements
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:65/200
Total Project Cost:$325,000
MUNIS PROJ#:62020
MUNIS Acct #:0325-0610
Status Active
Total20212022202320242025Expenditures2026
325,000325,0007216 - Land Improvement
325,000 325,000Total
Total20212022202320242025Funding Sources 2026
325,000325,0004401-Debt
325,000 325,000Total
Tuesday, January 19, 2021Page 952021 - 2025 CIP
Capital Improvements Program
City of Oshkosh, Wisconsin Contact Parks Director
Data in Year 2021 Department 6610 - Park Land Imprv (0325
Description
Westhaven Circle Park Play equipment and surfacing. The project will include new play equipment, installation of poured-in-place rubberized
surfacing that is safer, more accessible, durable and less maintenance than the existing wood fiber used in the pla
Project #21 WCRL EQUP
Justification
With this equipment being some of the oldest in the park system, the need to replace it with safer and more accessible equipment is ranked high in
the priorities for the park. The CORP for the city recommends the replacement of the equipment at Westhaven
Useful Life 20 years
Project Name Parks: Westhaven Circle Prk Play Equip & Surfacing Category 7204 - Machinery & Equip
Type Asset - Replacement
PASER Rating:n/a
CIP Proj. Score:65/200
Total Project Cost:$200,000
MUNIS PROJ#:62030
MUNIS Acct #:0325-0610
Status Active
Total20212022202320242025Expenditures2026
200,000200,0007204 - Equipment/Machinery
200,000 200,000Total
Total20212022202320242025Funding Sources 2026
200,000200,0004401-Debt
200,000 200,000Total
Tuesday, January 19, 2021Page 962021 - 2025 CIP