Loading...
HomeMy WebLinkAbout2016-2020CIPCity Of Oshkosh Capital Improvement Program 2016 - 2020 Prepared for Plan Commission: Revised for Council Workshop: City Manager's Final Draft: Common Council Approved:November 24, 2015 September 3, 2015 October 16, 2015 October 22, 2015 2016 CIP Comprehensive Streets/Utility Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Comprehensive Streets - New Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 Public Infrastructure Improvements - Other Streets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Public Infrastructure Improvements - Other Utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 Public Infrastructure Improvements - Storm Water Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 Public Infrastructure Improvements - Water Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 Public Infrastructure Improvements - Wastewater Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23 Public Infrastructure Improvements - Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32 Public Property Improvements - Non-Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34 Public Property Improvements - Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40 Major Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42 Major Equipment - Vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .43 Tax Increment Financing (TIF) Districts Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44 2016 CIP Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46 2016 Borrowing Spreadsheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48 2016 - 1 Comprehensive Streets/Utility Improvements Project Descriptions North Main Street Reconstruction 4,537,200$ Document/Study/Planning Document: 2011 Pedestrian and PASER Rating: 2 CIP Project Score: 135/200 Bicycle Circulation Plan Full reconstruction of the street, including public utilities and laterals from New York Avenue to Murdock Avenue. Original street construction in 1906. Asphalt overlay maintenance completed in 1981 and mid-1990's. Proposed 44’ concrete pavement in 66’ right-of-way. Sidewalk sections will be repaired, as needed. The pavement is in poor condition. The sanitary sewer is very old. This construction project has state funding. Because the construction project has state funding, the WDOT will manage the construction. Bike lanes will be constructed as part of the project. Actual street assessments are unknown at this time. Age of Infrastructure: Sanitary - 1896, 1902, 1905, and 1981 Water - Pre-1920's Storm - 1936 and 1958 CIP Section Assessment WDOT City Total Street 100,000$1,369,400$434,900$1,904,300$ Storm 64,500$450,400$203,100$718,000$ Wastewater 101,100$-$564,500$665,600$ Water -$-$722,300$722,300$ Sidewalk 73,200$-$48,800$122,000$ Traffic -$324,000$81,000$405,000$ 2016 - 2 Traffic -$324,000$81,000$405,000$ Total 338,800$2,143,800$2,054,600$4,537,200$ 2016 - 2 Comprehensive Streets/Utility Improvements Project Descriptions Bowen Street Reconstruction 3,076,600$ Document/Study/Planning Document: 2011 Pedestrian and PASER Rating: 4, 6 CIP Project Score: 120/200 Bicycle Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Otter Avenue to the Fox River. Concrete pavement originally constructed in 1968. Proposed 30'-34' concrete pavement in 44'- 49.5' right-of-way. South of Bay Shore Drive will be asphalt pavement. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and stripe facility. Age of Infrastructure: Sanitary - 1936, 1956, and 1969 Water - Pre-1920's and 1956 Storm - 1958 and 1969 CIP Section Assessment Other City Total Street 138,600$-$427,200$565,800$ Storm 19,500$-$1,227,500$1,247,000$ Wastewater 62,000$-$484,800$546,800$ Water -$-$647,200$647,200$ Sidewalk 41,900$-$27,900$69,800$ Total 262,000$-$2,814,600$3,076,600$ 2016 - 3 Mill Street Reconstruction 1,453,900$ Document/Study/Planning Document: N/A PASER Rating: 3, 4 CIP Project Score: 120/200 Full reconstruction of the street, including public utilities and laterals,from Otter Avenue to the Fox River. Original street construction from Ceape Avenue to Bay Shore Drive completed in 1927. Proposed 32'-36' concrete pavement in 57'-60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1936, 1938, 1951, and 1986 Water - Pre-1920's and 1956 Storm - 1903, 1909, 1977, and 1986 CIP Section Assessment Other City Total Street 142,600$-$301,800$444,400$ Storm 21,000$-$268,000$289,000$ Wastewater 51,100$-$308,900$360,000$ Water -$-$306,500$306,500$ Sidewalk 32,400$-$21,600$54,000$ Total 247,100$-$1,206,800$1,453,900$ 2016 - 3 Comprehensive Streets/Utility Improvements Project Descriptions Otter Avenue Reconstruction 2,343,700$ Document/Study/Planning Document: N/A PASER Rating: 3 CIP Project Score: 120/200 Full reconstruction of the street, including public utilities and laterals,from Broad Street to Bowen Street. Original street construction in 1906. Asphalt overlay maintenance completed in 1978. Proposed 36' concrete pavement in 64' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1894, 1977, and 1978 Water - Pre-1920's Storm - 1977 CIP Section Assessment Other City Total Street 176,600$-$344,700$521,300$ Storm 28,500$-$385,500$414,000$ Wastewater 79,700$-$409,600$489,300$ Water 3,300$-$857,500$860,800$ Sidewalk 35,000$-$23,300$58,300$ Total 323,100$-$2,020,600$2,343,700$ Ceape Avenue Reconstruction 371,000$ 2016 - 4 Ceape Avenue Reconstruction 371,000$ Document/Study/Planning Document: N/A PASER Rating: 2 CIP Project Score: 120/200 Full reconstruction of the street, including public utilities and laterals,from Mill Street to Bowen Street. Original street construction in 1898. Asphalt overly maintenance completed in 1979. Proposed 36' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1936 and 1939 Water - Pre-1920's Storm - 1969 and 1977 CIP Section Assessment Other City Total Street 32,100$-$68,500$100,600$ Storm 4,500$-$45,500$50,000$ Wastewater 13,200$-$93,900$107,100$ Water -$-$102,000$102,000$ Sidewalk 6,800$-$4,500$11,300$ Total 56,600$-$314,400$371,000$ 2016 - 4 Comprehensive Streets/Utility Improvements Project Descriptions Bismarck Avenue Reconstruction 344,200$ Document/Study/Planning Document: Residents' Petition PASER Rating: 3 CIP Project Score: 105/200 Full reconstruction of the street, including public utilities and laterals, but excluding water main, from South Sawyer Street to Guenther Street. Proposed 30' concrete pavement with curb and gutter in 50' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1954 Water - 2003 Storm - None CIP Section Assessment Other City Total Street 50,100$-$85,600$135,700$ Storm 5,300$-$58,800$64,100$ Wastewater 13,700$-$112,700$126,400$ Water -$-$-$-$ Sidewalk 10,800$-$7,200$18,000$ Total 79,900$-$264,300$344,200$ North Westfield Street Reconstruction 2,882,600$ 2016 - 5 North Westfield Street Reconstruction 2,882,600$ Document/Study/Planning Document: N/A PASER Rating: 4, 6 CIP Project Score: 115/200 Full reconstruction of the street, including public utilities and laterals,from Robin Avenue to Oshkosh Avenue. Concrete pavement originally constructed in 1976. Proposed 36' concrete pavement in 75' right-of-way. Sidewalk sections will be repaired, as needed. This project includes deep sanitary sewer interceptor line. Age of Infrastructure: Sanitary - 1968 Water - 1968 Storm - 1968 and 1991 CIP Section Assessment Other City Total Street 286,500$-$599,000$885,500$ Storm 16,500$-$701,500$718,000$ Wastewater 44,200$-$572,800$617,000$ Water 15,200$-$367,900$383,100$ Sidewalk 59,400$-$39,600$99,000$ Traffic -$-$180,000$180,000$ Total 421,800$-$2,460,800$2,882,600$ 2016 - 5 Comprehensive Streets/Utility Improvements Section Summary CIP Section Assessment WDOT City Total Street 926,500$1,369,400$2,261,700$4,557,600$ Storm 159,800$450,400$2,889,900$3,500,100$ Wastewater 365,000$-$2,547,200$2,912,200$ Water 18,500$-$3,003,400$3,021,900$ Sidewalk 259,500$-$172,900$432,400$ Traffic -$324,000$261,000$585,000$ Total 1,729,300$2,143,800$11,136,100$15,009,200$ 2016 85,600$ -$Developer Contribution Total Sources of Funds General Fund (City Contribution) 2,343,700$2,020,600$ Ceape Avenue Reconstruction 371,000$314,400$ Otter Avenue Reconstruction 264,300$Bismarck Avenue Reconstruction 344,200$ 2,460,800$ 11,136,100$15,009,200$ North Westfield Street Reconstruction 2,882,600$ Debt Financing: General Obligation Bonds Project Project Total Mill Street Reconstruction 1,453,900$1,206,800$ City Contribution North Main Street Reconstruction 4,537,200$2,054,600$ Bowen Street Reconstruction 3,076,600$2,814,600$ 2016 - 6 2,610,000$Fund Amount -$Storm 2,889,900$ 8,440,500$Wastewater 2,547,200$ 1,729,300$Water 3,003,400$ 2,143,800$Total 8,440,500$ -$ 15,009,200$ Debt Financing: Federal Grant Total Revenue Bonds Special Assessments State DOT Contributions General Obligation Bonds General Obligation Notes 2016 - 6 Comprehensive Streets - New Development Project Descriptions Farmington Avenue Construction 181,300$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 90/200 Construction of concrete pavement,from Anderson Street to 360' east of Anderson Street . Proposed 32' concrete pavement in 63' right-of-way. Sidewalk will be installed. CIP Section Assessment Other City Total Street 152,100$-$-$152,100$ Storm -$-$2,500$2,500$ Wastewater -$-$2,800$2,800$ Water -$-$5,000$5,000$ Sidewalk 11,300$-$7,600$18,900$ Total 163,400$-$17,900$181,300$ Second Addition to Casey's Meadow South 254,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 100/200 2016 - 7 CIP Project Score: 100/200 This project includes Casey Trail and Cloe Jude Drive located south of Mockingbird Way . Construction of concrete pavement, including four handicap ramps. Project is being paid for by the developer. CIP Section Assessment Other City Total Street -$254,000$-$254,000$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$254,000$-$254,000$ 2016 - 7 Comprehensive Streets - New Development Section Summary CIP Section Assessment Other City Total Street 152,100$254,000$-$406,100$ Storm -$-$2,500$2,500$ Wastewater -$-$2,800$2,800$ Water -$-$5,000$5,000$ Sidewalk 11,300$-$7,600$18,900$ Total 163,400$254,000$17,900$435,300$ 2016 -$ 254,000$ 7,600$ -$Fund Amount 10,300$Storm 2,500$ 163,400$Wastewater 2,800$ -$Water 5,000$ -$Total 10,300$Federal Grant Total Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Developer Contribution Second Addition to Casey's Meadow South 254,000$-$ Project Project Total City Contribution Farmington Avenue Construction 181,300$17,900$ Total 435,300$17,900$ Sources of Funds General Fund (City Contribution) 2016 - 8 -$Total 10,300$ 435,300$ Federal Grant Total 2016 - 8 Public Infrastructure Improvements - Other Streets Project Descriptions 8,622,400$ Document/Study/Planning Document: N/A PASER Rating: 4, 10 CIP Project Score: 130/200 A new 21" gravity sanitary sewer interceptor will be installed from the proposed Snell West lift station, located near Stearns Road, to the existing Snell Road lift station, located in front of the State prison. The proposed interceptor sewer will re-direct the sanitary sewer flows from the existing lift station in front of the prison to the west into the proposed Snell West lift station. Re-directing the flow will eliminate capacity issues in the existing sanitary sewer system to the east and south of the prison. With the reduced flows, the City will have capacity within the existing sanitary sewer for future development. The City will also be able to eliminate the existing Snell Road lift station and the force main associated with the lift station. CIP Section Assessment Other Utility Total Street 138,500$-$62,500$201,000$ Storm -$-$275,000$275,000$ Wastewater -$3,200,200$4,946,200$8,146,400$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 138,500$3,200,200$5,283,700$8,622,400$ Snell Road Interceptor Sewer 2016 - 9 Asphalt Mill and Overlay Program (Annual)750,000$ Document/Study/Planning Document: N/A PASER Rating: Varies CIP Project Score: 120/200 Project restores the asphalt surface of existing streets to a very good condition. Work can include curb and gutter repair; stone base course; and spot repairs to sanitary sewer, storm sewer, and water main systems. CIP Section Assessment Other City Total Street 312,500$-$312,500$625,000$ Storm -$-$50,000$50,000$ Wastewater -$-$50,000$50,000$ Water -$-$25,000$25,000$ Sidewalk -$-$-$-$ Total 312,500$-$437,500$750,000$ 2016 - 9 Public Infrastructure Improvements - Other Streets Project Descriptions Concrete Pavement Repairs (Annual)195,000$ Document/Study/Planning Document: N/A PASER Rating: Varies CIP Project Score: 120/200 Spot repairs to deteriorated panels of concrete pavement will be made on various arterial, collector, and local streets. Some work will be done in coordination with sanitary manhole rehabilitation project. CIP Section Assessment Other City Total Street -$-$150,000$150,000$ Storm -$-$15,000$15,000$ Wastewater -$-$15,000$15,000$ Water -$-$15,000$15,000$ Sidewalk -$-$-$-$ Total -$-$195,000$195,000$ 396,900$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 65/200 Up-front engineering services to help in the design of 2017 CIP projects. CIP Section Assessment Other City Total Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2017 Construction Projects 2016 - 10 CIP Section Assessment Other City Total Street -$-$14,400$14,400$ Storm -$-$185,000$185,000$ Wastewater -$-$185,000$185,000$ Water -$-$12,500$12,500$ Sidewalk -$-$-$-$ Total -$-$396,900$396,900$ 2016 - 10 Public Infrastructure Improvements - Other Streets Section Summary CIP Section Assessment Other City Total Street 451,000$-$539,400$990,400$ Storm -$-$525,000$525,000$ Wastewater -$3,200,200$5,196,200$8,396,400$ Water -$-$52,500$52,500$ Sidewalk -$-$-$-$ Total 451,000$3,200,200$6,313,100$9,964,300$ 2016 164,400$ 250,000$ 250,000$ 52,500$ -$Developer Contribution Debt Financing: General Obligation Bonds Storm Water Utility Fund Contribution Wastewater Utility Fund Contribution Water Utility Fund Contribution Total 9,964,300$6,313,100$ Sources of Funds General Fund (City Contribution) Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2017 396,900$396,900$ Snell Road Interceptor Sewer 8,622,400$5,283,700$ Asphalt Mill and Overlay Program (Annual)750,000$437,500$ Concrete Pavement Repairs (Annual)195,000$195,000$ Project Project Total City Contribution 2016 - 11 375,000$Fund Amount -$Storm 525,000$ 5,221,200$Wastewater 5,196,200$ 451,000$Water 52,500$ -$Total 5,773,700$ -$ Previously Borrowed 3,200,200$ 9,964,300$ Debt Financing: General Obligation Bonds Total General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Federal Grant 2016 - 11 Public Infrastructure Improvements - Other Utilities Project Descriptions West Ripple Avenue Sewer and Water Extension 649,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 70/200 Extend sanitary sewer and water main on West Ripple Avenue,from Oregon Street to a point 1,300' east of West Ripple Avenue, to serve proposed future development. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$370,000$370,000$ Water -$-$279,000$279,000$ Sidewalk -$-$-$-$ Total -$-$649,000$649,000$ 2016 - 12 2016 - 12 Public Infrastructure Improvements - Other Utilities Projects Funded in Prior Years but Not Constructed Butler Avenue and Pickett Avenue Utilities 938,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Install sanitary sewer, water main, sanitary sewer laterals, and water laterals to serve properties currently hooked up to the private system of the Winnebago County Health Institute. The properties will be disconnected from the private system under orders from the State Department of Administration and will have to be annexed to the City from the Town of Oshkosh. Utilities will be extended to the property line to allow the homeowners to connect. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 267,000$-$211,000$478,000$ Water 225,000$-$235,000$460,000$ Sidewalk -$-$-$-$ Total 492,000$-$446,000$938,000$ Stearns Drive - Lakeview Park Subdivision 57,100$ Document/Study/Planning Document: N/A PASER Rating: N/A Provide City's portion of costs to upsize sanitary sewer and water mains through 2016 - 13 Provide City's portion of costs to upsize sanitary sewer and water mains through proposed subdivision. Municipal Code requires infrastructure cost for new development to be covered by Developer. When the City wants to upsize utilities to allow for servicing larger areas, the cost increase is calculated and credited to the Developer through the Developer's Agreement. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$22,500$22,500$ Water -$-$34,600$34,600$ Sidewalk -$-$-$-$ Total -$-$57,100$57,100$ 2016 - 13 Public Infrastructure Improvements - Other Utilities Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$370,000$370,000$ Water -$-$279,000$279,000$ Sidewalk -$-$-$-$ Total -$-$649,000$649,000$ 2016 -$ -$ -$ -$ -$Fund Amount -$Storm -$ 649,000$Wastewater 370,000$ -$Water 279,000$ -$Total 649,000$ Project Project Total Utility Contribution West Ripple Avenue Sewer and Water Extension 649,000$649,000$ Debt Financing: Total 649,000$649,000$ Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Water Utility Fund Contribution Developer Contribution General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Federal Grant 2016 - 14 -$Total 649,000$ -$ 649,000$Total State DOT Contributions Federal Grant 2016 - 14 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Libbey/Nicolet Watershed/North Main Street Area Detention Basin 3,200,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 145/200 Construction of storm water detention basin to reduce flooding impacts and improve storm water quality. The detention basin will be generally located north of Libbey Avenue and extended between Jackson Street and North Main Street. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$3,200,000$3,200,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$3,200,000$3,200,000$ Gallups/Merritts Creek Watershed Land Acquisition 1,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A 2016 - 15 Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 140/200 The watershed generally encompasses an area starting southwest of the City of Oshkosh, near S.T.H. 26 and C.T.H. N, and northeasterly towards West 28th Avenue and South Main Street. Major landmarks within the watershed include the Ford Festival Grounds and Airport Industrial Park (between West 35th Avenue and West 29th Avenue). CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$1,500,000$1,500,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,500,000$1,500,000$ 2016 - 15 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Stringham Watershed Land Acquisition 1,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 110/200 This project will include implementation of flood reduction strategy within the Stringham Creek watershed and dredging sediment from lagoons, repairing shoreline erosion, and reconfiguring lagoons for improved storm water management. The Stringham watershed generally encompasses an area from the Universal Business Park, northwesterly to Iowa Street at the Fox River. Major landmarks within the watershed include the Vulcan Quarry and South Park. This project will help reduce the flooding impacts experienced in the South Park vicinity and the Ohio Street area between West 9th Avenue and South Park Avenue. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$1,500,000$1,500,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,500,000$1,500,000$ Johnson Creek Watershed Study 200,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 85/200 2016 - 16 CIP Project Score: 85/200 Conduct detailed planning-level study to identify flood reduction alternatives/strategies within the watershed. The Johnson Creek Watershed generally encompasses an area of approximately one-half mile wide, from the intersection of Knapp Street and C.T.H. N northeasterly to Lake Winnebago. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$200,000$200,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$200,000$200,000$ 2016 - 16 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Mini Storm Sewers/Storm Laterals 250,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 80/200 Provide mini storm sewers and laterals to property owners that have requested them. The laterals allow property owners to connect to the storm sewer system without discharging water over the sidewalk. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 20,000$-$230,000$250,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 20,000$-$230,000$250,000$ 2016 - 17 2016 - 17 Public Infrastructure Improvements - Storm Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 20,000$-$6,630,000$6,650,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 20,000$-$6,630,000$6,650,000$ 2016 -$ 230,000$ 2,570,300$ -$ Sources of Funds General Fund (City Contribution) 230,000$ Johnson Creek Watershed Study 200,000$200,000$ Total 6,650,000$6,630,000$ Developer Contribution Debt Financing: General Obligation Bonds Capital Cash Contribution Project Project Total Utility Contribution Libbey/Nicolet Watershed/North Main Street Area Detention Basin 3,200,000$3,200,000$ Gallups/Merritts Creek Watershed Land Acquisition 1,500,000$1,500,000$ Stringham Watershed Land Acquisition 1,500,000$1,500,000$ Storm Water Utility Fund Contribution Mini Storm Sewers/Storm Laterals 250,000$ 2016 - 18 -$Fund Amount -$Storm 6,630,000$ 3,829,700$Wastewater -$ 20,000$Water -$ -$Total 6,630,000$ -$ -$ 6,650,000$ State Grant Total Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Federal Grant 2016 - 18 Public Infrastructure Improvements - Water Utility Project Descriptions Aviation Business Park Water Main Loop 1,650,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 165/200 Install new 16" water main to complete loop to Aviation Business Park to improve fire flows into the park. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$1,650,000$1,650,000$ Sidewalk -$-$-$-$ Total -$-$1,650,000$1,650,000$ West 5th Avenue Water Main Relays 1,245,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 100/200 2016 - 19 CIP Project Score: 100/200 Replace existing 4" x 6" water main with 8" water main,from Eagle Street to Knapp Street. Roadway will be patched with asphalt and concrete. The existing main is undersized and had multiple breaks over the past 5 years. The new water main will increase fire flows in the area. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water 4,500$-$1,240,500$1,245,000$ Sidewalk -$-$-$-$ Total 4,500$-$1,240,500$1,245,000$ 2016 - 19 Public Infrastructure Improvements - Water Utility Project Descriptions Miscellaneous Lead Service Replacements 250,000$ Document/Study/Planning Document: N/A CIP Project Score: 95/200 As sanitary sewer laterals are relayed, if lead water services are discovered, these services will be replaced under the Lead Abatement Program. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$250,000$250,000$ Sidewalk -$-$-$-$ Total -$-$250,000$250,000$ 2016 - 20 2016 - 20 Public Infrastructure Improvements - Water Utility Projects Funded in Prior Years but Not Constructed Water Main Extension: Quail Run Drive to Bromfield Drive 154,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Extension of new 8" water main from Quail Run Drive to Bromfield Drive . This project will eliminate a long dead end by providing another source of water. Past water main break on this dead end resulted in approximately 90 homes without water. Due to the boundary agreement with the Town of Algoma, future extensions of this main cannot occur. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$154,000$154,000$ Sidewalk -$-$-$-$ Total -$-$154,000$154,000$ 2016 - 21 2016 - 21 Public Infrastructure Improvements - Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water 4,500$-$3,140,500$3,145,000$ Sidewalk -$-$-$-$ Total 4,500$-$3,140,500$3,145,000$ West 5th Avenue Water Main Relays 2016 -$ -$ -$ -$Fund Amount -$Storm -$ 3,140,500$Wastewater -$ 4,500$Water 3,140,500$ Project Project Total Utility Contribution Miscellaneous Lead Service Replacements 250,000$250,000$ Aviation Business Park Water Main Loop 1,650,000$1,650,000$ Total 3,145,000$3,140,500$ 1,245,000$1,240,500$ Sources of Funds General Fund (City Contribution) Water Utility Fund Contribution Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions 2016 - 22 4,500$Water 3,140,500$ -$Total 3,140,500$ -$ 3,145,000$Total Special Assessments State DOT Contributions Federal Grant 2016 - 22 Public Infrastructure Improvements - Wastewater Utility Project Descriptions 3,015,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 120/200 Installation of new sanitary sewer interceptor,from 28th Avenue lift station to Waukau lift station . Installation of this interceptor sewer will allow us to eliminate the Waukau Avenue lift station. Pipe capacities will be increased on Fond du Lac Road, which will aid in eliminating residents' basement backups. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 6,100$750,000$2,258,900$3,015,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 6,100$750,000$2,258,900$3,015,000$ 20th Avenue Sanitary Sewer Relay Fond du Lac Road Sanitary Interceptor Sewer 2016 - 23 271,700$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 65/200 Install sanitary sewer and laterals,from Clairville Road to 1,100' east of 20th Avenue , to support future development west of the YMCA. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 17,100$-$254,600$271,700$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 17,100$-$254,600$271,700$ 20th Avenue Sanitary Sewer Relay 2016 - 23 Public Infrastructure Improvements - Wastewater Utility Project Descriptions 125,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 100/200 Design of new sanitary sewer lift station in Mary Jewell Park will eliminate a sanitary sewer river crossing and will provide sufficient depth for future sanitary relay projects. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$125,000$125,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$125,000$125,000$ 750,000$ Lift Station Design for Mary Jewell Park Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 2016 - 24 750,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 145/200 Work includes identification and elimination of clear water entering the sanitary sewer system and implementation of CMOM/SECAP recommendations. Work can include manhole inspections and repairs, flow monitoring, and/or sewer lining or replacement. Sanitary sewer lining and grouting of laterals and mainline will be performed in areas that have newer concrete streets with aging sanitary sewer infrastructure. Televising inspections will be used to determine the areas of work. This helps to remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a significant problem. The sanitary sewer system is not designed to handle these flows. The result of the excess flow is sanitary sewer backups into residents' homes. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 62,500$-$687,500$750,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 62,500$-$687,500$750,000$ Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 2016 - 24 Public Infrastructure Improvements - Wastewater Utility Project Descriptions 80,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 90/200 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$80,000$80,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$80,000$80,000$ 643,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 90/200 Relay sanitary sewer on Dickinson Avenue, from Maricopa Drive to Washburn Street , and on Maricopa Drive, from Covington Drive to Dickinson Avenue . Sanitary sewer needs to be relocated Decommission Murdock Avenue Lift Station Dickinson Avenue and Maricopa Drive Sanitary Sewers 2016 - 25 Maricopa Drive, from Covington Drive to Dickinson Avenue . Sanitary sewer needs to be relocated due to storm sewer design. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$643,000$643,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$643,000$643,000$ 2016 - 25 Public Infrastructure Improvements - Wastewater Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 85,700$750,000$4,049,000$4,884,700$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 85,700$750,000$4,049,000$4,884,700$ 2016 -$ 80,000$ -$ -$Fund AmountGeneral Obligation Bonds General Obligation Notes Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Developer Contribution Debt Financing: Total 4,884,700$4,049,000$ Decommission Murdock Avenue Lift Station 80,000$80,000$ Dickinson/Maricopa Sanitary Sewers 643,000$643,000$ Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 750,000$687,500$ Fond du Lac Road Sanitary Interceptor Sewer 3,015,000$2,258,900$ 20th Avenue Sanitary Sewer Relay Lift Station Design for Mary Jewell Park 271,700$ 125,000$ 254,600$ 125,000$ Project Project Total Utility Contribution 2016 - 26 -$Fund Amount -$Storm -$ 3,969,000$Wastewater 4,049,000$ 85,700$Water -$ -$Total 4,049,000$ -$ 750,000$ 4,884,700$ Federal Grant Total General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Previously Borrowed 2016 - 26 Public Infrastructure Improvements - Sidewalks Project Descriptions Sidewalk Rehabilitation and Reconstruction Program 750,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 110/200 Program rotates through the City on a 10-year cycle to repair defective sidewalk squares. Program also includes citizen complaint locations. Handicap ramps are installed at intersections currently without ramps. Program will also fix deteriorated driveway aprons. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 550,000$-$200,000$750,000$ Total 550,000$-$200,000$750,000$ Sidewalk: New Walk Ordered In 65,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 90/200 Install new sidewalk along street segments without sidewalk. Selection to be coordinated through Pedestrian/Bicycle committee. CIP Section Assessment Other City Total 2016 - 27 CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 60,000$-$5,000$65,000$ Total 60,000$-$5,000$65,000$ Sidewalk: Subdivision Agreements 55,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 120/200 Install sidewalks at various locations within newer subdivisions. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 50,000$-$5,000$55,000$ Total 50,000$-$5,000$55,000$ 2016 - 27 Public Infrastructure Improvements - Sidewalks Project Descriptions West South Park Avenue Sidewalk Construction 105,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 90/200 Construction of sidewalk on West South Park Avenue, from West 20th Avenue to South Koeller Street . This will provide sidewalk connection along S.T.H. 44 between South Koeller Street and West South Park Avenue, connecting Ripon Lane to the City's sidewalk system. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 100,000$-$5,000$105,000$ Total 100,000$-$5,000$105,000$ 2016 - 28 2016 - 28 Public Infrastructure Improvements - Sidewalks Section Summary CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 760,000$-$215,000$975,000$ Total 760,000$-$215,000$975,000$ 2016 215,000$ -$ -$Fund Amount -$Storm -$ -$Wastewater -$ 760,000$Water -$ Revenue Bonds Special Assessments State DOT Contributions General Obligation Notes West South Park Avenue Sidewalk Construction 105,000$5,000$ Total 975,000$215,000$ Sources of Funds General Fund (City Contribution) Developer Contribution Debt Financing: General Obligation Bonds Sidewalk: New Walk Ordered In 65,000$5,000$ Sidewalk: Subdivision Agreements 55,000$5,000$ Project Project Total City Contribution Sidewalk Rehabilitation and Reconstruction Program 750,000$200,000$ 2016 - 29 760,000$Water -$ -$Total -$ -$ 975,000$ Special Assessments State DOT Contributions Federal Grant Total 2016 - 29 Traffic Improvements Project Descriptions Bicycle and Pedestrian Infrastructure 25,000$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle Circulation Plan CIP Project Score: 75/200 Provide designated funds for bicycle and pedestrian infrastructure improvements. Primary improvements will be bicycle lane striping and symbols and bike facility signage for existing and future routes. Traffic Signal Equipment 45,000$ Document/Study/Planning Document: N/A CIP Project Score: 95/200 This item pays for traffic signal equipment to be installed at various intersections as needed, in order to repair knockdowns and/or replace obsolete equipment. Typical purchases include poles, cabinets, controllers, and vehicle detection equipment. Install Pedestrian Countdown Signal Heads 25,000$ Document/Study/Planning Document: 2011 Bicycle and Pedestrian Circulation Plan CIP Project Score: 95/200 This project facilitates a system-wide replacement of the City's signal heads (these are the upraised hand/walking symbols, which indicate to pedestrians when it is safe to cross the street). 2016 - 30 LED Replacement 10,000$ Document/Study/Planning Document: N/A CIP Project Score: 95/200 This item will involve replacement of LED signal heads at City-maintained traffic signals. 2016 - 30 Traffic Improvements Section Summary 2016 105,000$ -$ -$ -$ -$ 105,000$ Federal Grant Total Debt Financing: General Obligation Bonds Revenue Bonds General Obligation Notes Project Project Total City Contribution Traffic Signal Equipment 45,000$45,000$ Bicycle and Pedestrian Infrastructure 25,000$25,000$ Install Pedestrian Countdown Signal Heads 25,000$25,000$ LED Replacement 10,000$10,000$ Sources of Funds General Fund (City Contribution) Total 105,000$105,000$ 2016 - 31 2016 - 31 Park Improvements Project Descriptions Menominee Park - Little Oshkosh Update 400,000$ Document/Study/Planning Document: Menominee Park Master Plan Donations: 300,000$ CIP Project Score: 105/200 Parks department staff has been working with Southwest Rotary on developing a capital campaign to renovate/reconstruct "Little Oshkosh" due to safety and maintenance concerns. This would be the City's contribution towards a completely renovated "Little Oshkosh". Red Arrow Park Restrooms Update 80,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan CIP Project Score: 85/200 The restrooms at Red Arrow Park are in very poor condition, as noted in the updated Comprehensive Outdoor Recreation Plan, as well as in the citizen surveys for the Plan update. The project will include updating the entire restroom building to be ADA-compliant, including new plumbing, lighting, fixtures, ceiling, walls, partitions, etc. Design Services - South Park Lagoons 50,000$ Document/Study/Planning Document: South Park Master Plan and Storm Water Utility Plans CIP Project Score: 90/200 The South Park Master Plan identified several improvements for the lagoons at South Park to aid in storm water management, as well as shoreline stabilization. These design services will help to identify specific project costs. Construction is planned for 2017. Teichmiller Park Lighting 30,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan CIP Project Score: 70/200 The lights in Teichmiller Park are some of the oldest in the park system. The replacement of site lighting at Teichmiller Park is ranked as a high priority in the CORP. 2016 - 32 Park Improvements Section Summary 2016 -$ 260,000$ -$ -$ 300,000$ 560,000$ 560,000$260,000$ Sources of Funds General Fund (City Contribution) Total Revenue Bonds Donations Debt Financing: General Obligation Bonds General Obligation Notes Total 50,000$50,000$ Teichmiller Park Lighting 30,000$30,000$ Design Services - South Park Lagoons Red Arrow Park Restrooms Update 80,000$ Project Project Total City Contribution 80,000$ Menominee Park - Little Oshkosh Update 400,000$100,000$ 2016 - 33 Public Property Improvements - Non-Utility Project Descriptions Community Development: Great Neighborhoods Initiative 200,000$ Document/Study/Planning Document: Healthy Neighborhood Oshkosh Foundation 100,000$ CIP Project Score: 110/200 Initiative/Strategic Plan/ Comprehensive Plan Construct neighborhood improvements that support the Healthy Neighborhood Initiative in concert with Neighborhood Associations and neighborhood improvement partners. Projects are located in the right-of-way or on public property, and include streetscape improvements and signage, pedestrian and bicycle safety improvements, park improvements, safe routes to school improvements, Taking root tree planting, and others identified and approved by the City Council. Blight Removal for Neighborhood Redevelopment 200,000$ Document/Study/Planning Document: Strategic Plan/Comprehensive State Grant:20,000$ CIP Project Score: 45/200 Plan State Trust Fund Loan: 180,000$ Acquisition, demolition, and remediation of various sites with WDNR permitting/site closure, if required. Riverwalk Signage 25,000$ Document/Study/Planning Document: Riverwalk Corridor Design Guidelines CIP Project Score: 75/200 Purchase and installation of riverwalk signage and banners, way-finding signage, kiosks, and park regulations. General Services: Roofing/HVAC Improvements 500,000$ Document/Study/Planning Document: Roofing and HVAC Study CIP Project Score: 90/200 Ongoing program to address improvements for roofing and HVAC projects, based on McKinstry/Summit Designs HVAC Inventory Assessment and Specialty Engineering Group Roofing Inventory Assessment. Projects are prioritized annually based on condition. Seniors Center South - Flooring Replacement 55,000$ Document/Study/Planning Document: N/A CIP Project Score: 45/200 The Oshkosh Seniors Center South building is 20 years old and the original carpeting and flooring is in very poor condition. This project will include removal and replacement of all the flooring, both carpeting and hard surfaces, minus the portion completed in 2012. 2016 - 34 Public Property Improvements - Non-Utility Project Descriptions Council Chambers Modifications 40,000$ Document/Study/Planning Document: N/A CIP Project Score: 75/200 The Council Chambers' (Room 406 of City Hall) carpet, chairs, and wall coverings are approximately 20 years old. The carpet is fraying in several areas and have traffic wears that can no longer be cleaned. In addition, many of the audience chairs' upholstery have rips, stains, or blemishes that cannot be repaired or cleaned. Seniors Center South Exterior Painting 25,000$ Document/Study/Planning Document: N/A CIP Project Score: 65/200 The Seniors Center South building exterior is in need of painting. The exterior paint is original to the building, circa 1994. Grand Opera House Carpet Replacement 31,480$ Document/Study/Planning Document: N/A CIP Project Score: 65/200 With the exception of the balcony carpet that was installed in 2009, the balance of all the carpet within the Grand Opera House annex, lobby, front lobby, steps, and main hall is circa-1980. This carpet is all original from the mid-1980's renovation and is high-grade, wool carpet that was custom designed to match the original color scheme of the Grand interiors. While the carpet has been cleaned and maintained over the years, it has experienced numerous rips, stretching, and fading that can no longer be repaired. Various tripping hazards and unsightly tears are evident throughout the theatre. This replacement will be performed during 2015 and 2016. Safety Building Locker Room Renovation Study 25,000$ Document/Study/Planning Document: N/A CIP Project Score: 70/200 The lower level locker rooms of the Safety Building are original to the building and have suffered much wear and tear in the last 25+ years. The locker rooms are in need of larger lockers, various plumbing and shower fixture upgrades, and new flooring. 2016 - 35 Public Property Improvements - Non-Utility Project Descriptions Museum: Implement People of the Waters Exhibit 400,000$ Donations:200,000$ Document/Study/Planning Document: Various reports and assessments from 1999 through 2013 CIP Project Score: 70/200 Replace the current 2,000 square foot Wetlands and Waterways exhibit, opened in 1998, with People of the Waters. This is an interactive and immersive exhibit that ties to the interpretve themes of the Fox Wisconsin Heritage Parkway and connects to school curriculum. The current exhibit is outdated and has lost its audience appeal. The gallery does not have the infrastructure necessary to sustain new exhibit technologies and it would be extraordinarily difficult to retrofit the gallery with an existing exhibit in place. New interactive exhibits are key to a reinvigorated museum designed to serve new generations. This project began with conceptual design (2014) and design development (2015). Parks: Seniors Center North - Phase I 300,000$ Document/Study/Planning Document: Oshkosh Senior Center Donations/Building Fund: 300,000$ CIP Project Score: 85/200 Vision 2020 Phase 1 of the renovation is likely HVAC, a new roof, walls and unsulation for the steel shed portion of the north building. Additional aspects of Phase 1 could include: relocation of the Adult Day services into the north building, the creation of a full-service kitchen, or the relocation and expansion of the Fitness Center. The project will include the entire footprint of the Seniors Center North building, 234 North Campbell Road. Public Works: Landfill Gas Remediation 383,000$ Document/Study/Planning Document: N/A CIP Project Score: 95/200 Complete investigation of methane generation, design of remediation system, and/or land acquisition at 2 former quarries filled with refuse from City, south of 17th Avenue, between Knapp Street and Sanders Street. Street: Autowash System for Public Works Field Operations Facility 225,000$ Document/Study/Planning Document: N/A CIP Project Score: 100/200 Landscaping for Public Works Field Operations Facility 75,000$ Document/Study/Planning Document: N/A CIP Project Score: 100/200 and Strategic Plan. 2016 - 36 Public Property Improvements - Non-Utility Project Descriptions Transportation: Parking Lot Improvements - Riverside Phase 2 340,000$ Document/Study/Planning Document: 2015 Parking Lot Assessment CIP Project Score: 135/200 This allocates funding toward future reconstruction of municipal parking lots.Reimbursement of TIF #15 for the Riverside Parking Lot reconstruction needs to occur in 2016. Parking Lot Improvements - Other Projects 760,000$ Document/Study/Planning Document: 2015 Parking Lot Assessment CIP Project Score: 85/200 This allocates funding toward future reconstruction of municipal parking lots. A priority for 2016 is the Seniors Center South Parking Lot Phase 2. Phase 1 was done in 2015. Transportation Department Facility Reconfiguration 310,000$ Document/Study/Planning Document: 2011 Transportation Department Space Utilization Study prepared CIP Project Score: 90/200 by Martin Riley and Associates This project involves accessibility, security, and customer-oriented improvements at the Transportation Department building on Dempsey Trail to extend the useful life of the building and improve its functionality and efficiency. Purchase of Streetlighting Poles 25,000$ Document/Study/Planning Document: N/A CIP Project Score: 85/200 The City owns over 1,000 streetlighting poles. While these poles are expected to have a long, serviceable life, we do lose poles through damage from car accidents (about half of which are hit and run/ unrecoverable). In addition, we are trying to expand the number of City-owned poles. This project would help to increase our inventory for both replacement of varying types of lighting poles we have and to allow for future expansion. LED Streetlighting Upgrades 25,000$ Document/Study/Planning Document: N/A CIP Project Score: 85/200 This project would replace high-pressure sodium (HPS) lights at various locations with LED lighting. HPS lights have a 3-5 year lifespan and are not typically replaced within a CIP. LED lamps, conversely, are expected to last 10-20 years, and therefore qualify as a capital improvement. The projected location for 2016 is the frontage road's cobra head fixtures. 2016 - 37 Public Property Improvements - Non-Utility Project Descriptions Replace Bus Shelters 12,000$ Document/Study/Planning Document: 2011 Transit Development Plan Federal Grant:9,600$ CIP Project Score: 50/200 This project would result in replacement of several older bus shelters. Pedestrian Accessibility Improvements 10,000$ Document/Study/Planning Document: 2011 Transit Development Plan Federal Grant:6,480$ CIP Project Score: 70/200 This project will pay for paving and curbing improvements to bring high-usage transit stops into compliance with the Americans with Disabilities Act. Locations will be prioritized based on the level of current ridership, and the cost of making the improvement. 2016 - 38 Public Property Improvements - Non-Utility Section Summary 2016 185,920$ 260,000$ -$ 2,704,480$ -$ 180,000$ 16,080$ 20,000$ 600,000$ 3,966,480$ 200,000$ Safety Building Locker Room Renovation Study 25,000$ Grand Opera House Carpet Replacement Blight Removal for Neighborhood Redevelopment 200,000$-$ Roofing/HVAC Improvements 500,000$500,000$ Riverwalk Signage 25,000$25,000$ Council Chambers Modifications 40,000$40,000$ Project Project Total City Contribution Total Federal Grant Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds State Grant Donations/Building Fund Seniors Center North - Phase I LED Streetlighting Upgrades 300,000$-$ 3,520$ Autowash System for Public Works Field Operations Facility Landscaping for Public Works Field Operations Facility Parking Lot Improvements - Riverside Phase 2 Transit Fund Contribution Transportation Department Facility Reconfiguration Purchase of Streetlighting Poles 383,000$ 310,000$ 10,000$ 25,000$25,000$ Landfill Gas Remediation State Trust Fund Loan Pedestrian Accessibility Improvements 12,000$2,400$ Parking Lot Improvements - Other Projects 760,000$ Total General Fund (City Contribution) Great Neighborhoods Initiative 200,000$100,000$ 3,150,400$ Sources of Funds 383,000$ 225,000$225,000$ 75,000$75,000$ 340,000$340,000$ 310,000$ 31,480$31,480$ 25,000$ 3,966,480$ Replace Bus Shelters Seniors Center South - Flooring Replacement 55,000$55,000$ 25,000$25,000$ 25,000$25,000$Seniors Center South Exterior Painting 760,000$ Implement People of the Waters Exhibit 400,000$ 2016 - 39 Public Infrastructure Improvements - Utility Project Descriptions Dual Media Filter #1 Concrete Repairs (Water Filtration)170,000$ Document/Study/Planning Document: N/A CIP Project Score: 90/200 The dual media filters were constructed in 1998 and put into service in 1999. The filters need to be inspected and repairs made to concrete and control joints. Water Filtration Plant and Water Tower Security Upgrades (Water Filtration)77,000$ Document/Study/Planning Document: N/A CIP Project Score: 70/200 Basic security measures were installed at the plant and the water towers in 2005 and need to be upgraded. New Vehicle Storage Building (Water Filtration)200,000$ Document/Study/Planning Document: N/A Previously Borrowed: 183,000$ CIP Project Score: 80/200 In order to provide proper storage of vehicle and equipment, construction of a vehicle and equipment storage facility is planned at the Filtration Plant. Currently, vehicles are kept outside and lawn and gas powered equipment are stored in the Water Filtration Plant building. Mixing System for Southwest Tower (Water Filtration)40,000$ Document/Study/Planning Document: N/A CIP Project Score: 70/200 Southwest Tower needs the addition of a mixing system to improve water quality and disinfection in the high pressure zone. 390,000$ Document/Study/Planning Document: N/A Previously Borrowed: 360,000$ CIP Project Score: 115/200 Rebuild two primary clarifiers that were installed in 1973. This will extend center support to keep drives from going under water during high flows. Washburn Lift Station Electrical Service Upgrade (Wastewater)48,000$ Document/Study/Planning Document: N/A CIP Project Score: 65/200 Electrical service was installed in 1992. It uses a unique voltage that is not used any more and is difficult to work with. The equipment has surpased its useful life span. Equipment, including new pumps and panel, will be installed that utilizes a more common voltage. Recondition Two Primary Clarifiers (Wastewater) 2016 - 40 Public Infrastructure Improvements - Utility Section Summary 2016 -$ 48,000$ 117,000$ -$Fund Amount -$Storm -$ 217,000$Wastewater 78,000$ 543,000$Water 304,000$ 925,000$Total 382,000$Total Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Previously Borrowed 77,000$ Wastewater Utility Fund Contribution Total 925,000$382,000$ Sources of Funds General Fund (City Contribution) 200,000$17,000$ 40,000$40,000$ 390,000$30,000$ Water Utility Fund Contribution 48,000$48,000$ Washburn Lift Station Electrical Service Upgrade (Wastewater) Project Project Total Utility Contribution Dual Media Filter #1 Concrete Repairs (Water Filtration) Water Filtration Plant and Water Tower Security Upgrades (Water Filtration) New Vehicle Storage Building (Water Filtration) Mixing System for Southwest Tower (Water Filtration) Recondition Two Primary Clarifiers (Wastewater) 170,000$170,000$ 77,000$ 2016 - 41 Major Equipment Amount 60,000$ 75,000$ 10,000$ 800,000$ 700,000$ 500,000$ 25,000$ Total 2,170,000$ Section Summary 2016 85,000$ 25,000$Fund Amount Storm -$ -$Wastewater 1,225,000$ 860,000$Water -$ 1,200,000$Total 1,225,000$ -$ 2,170,000$Total General Obligation Bonds General Obligation Notes Revenue Bonds Information TechnologyEnterprise Resource Planning Suite Wastewater Wastewater Federal Grant Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Debt Financing: Replace Motor Control Centers 1-11 Wastewater Substation #1 Switchgear Upgrade Replace Digester Area Heating Boiler Central Garage Major Equipment Department Mobile Column Lifts General ServicesOffice Furniture Replacement Program Project Contingency General 2016 - 42 Major Equipment - Vehicles Amount 900,000$ 610,000$ 95,000$ 37,000$ 265,000$ 65,000$ 65,000$ 150,000$ 1,500,000$ 50,000$ 25,000$ 102,000$ 52,000$ 39,000$ 35,000$ 275,000$ Total 4,265,000$ 2016 75,000$Fund Amount 275,000$Storm -$ 228,000$Wastewater 275,000$ Water 228,000$ -$Total 503,000$ 2,452,920$ -$ 1,200,000$ 34,080$ 4,265,000$ Wastewater 3/4-Ton 4x4 Pickup Truck (replaces #892, 2003 GMC)Water Filtration Water Distribution 3/4-Ton CNG 4x4 Pickup Truck with Service Body (replaces #820, 2005)Water Distribution 3/4-Ton CNG Full-Size Van (replaces #826, 2005 Van)Water Distribution Total Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Federal Grant Previously Borrowed General Fund (City Contribution) Water Utility Fund Contribution Sources of Funds Wastewater Utility Fund Contribution Major Equipment - Vehicles Leaf Vac with Front Mount (replaces #242, 2004) Dual-Steer, Tandem Dump Truck with Stainless Steel Box, with Slide-In V- Box and Pre-Wet, Plow and Wing (replaces #64, 2004 IH) New Brine System Pickup Truck (replaces #413, 2005 Dodge Crew Cab) Vac Truck (replaces #57, 1998 International) Backhoe/Front End Loader (replaces #803, 2006) Department Quint (Engine/Ladder) (replaces 1999 Engine)Fire Department 3 - Ambulances (replaces 2004 and 2005)Fire Department Transportation 3/4-Ton Utility Truck (replace #508, 1998) (Signs)Transportation Scissors Lift (replaces 1991) (Electrical) Tractor (replaces #169, 1994 Tiger) Transportation Street 3 - 35' Diesel Buses (replaces 2003) (Transit) Parks Compact Wheel Loader (replaces #440, 1991 John Deere 4x4 )Parks Street Street Street 2016 - 43 Tax Increment Financing (TIF) Districts Improvements Project Descriptions Railroad Spur for Southwest Industrial Park 1,807,000$ Document/Study/Planning Document: N/A Previously Authorized CIP Project Score: N/A but not Borrowed:200,000$ WDOT Grant: 1,000,000$ Private Contribution:607,000$ Construct new railroad spur for trans-modal shipping to serve the Southwest Industrial Park. Elements include rail switch and track, catwalk, access roadway, lighting, and storm water facilities. Jeld Wen Zone Riverwalk - West, Phase 2 of 5, Year 1 of 1 Construction 1,279,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan State Grant:639,500$ CIP Project Score: 110/200 TIF: TID #21 and Donation from TID #7 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. South Shore Redevelopment Sites 1,250,000$ Document/Study/Planning Document: South Shore Redevelopment Plan/State Grant:300,000$ CIP Project Score: 115/200 TIF #20 TIF: TID #20 Land acquisition, demolition, and remediation of multiple sites in the South Shore Redevelopment Area is required for the implementation of the riverwalk plan and the redevelopment of the South Shore. Examples include: Pioneer Drive, Miles Kimball site, 43 East 7th Avenue, Buckstaff, and Boat 2016 - 44 Shore. Examples include: Pioneer Drive, Miles Kimball site, 43 East 7th Avenue, Buckstaff, and Boat Works upland sites. Marion Road Redevelopment Area Remediation 520,000$ Document/Study/Planning Document: Marion Road State Grant:150,000$ CIP Project Score: 110/200 Redevelopment Plan TIF: TID #21 and Donation from TID #7 In order to implement the redevelopment and revitalization of the Marion Road Redevelopment Area, environmental contamination at three sites within this area needs to be remediated. Southwest Industrial Park Amendment (WPS Utilities)331,300$ Document/Study/Planning Document: N/A State Trust Fund Loan:331,300$ CIP Project Score: N/A 2016 - 44 Tax Increment Financing (TIF) Districts Improvements Section Summary 2016 -$ 607,000$ 950,000$ -$ -$ 331,300$ 1,009,500$ 1,000,000$ -$ 1,089,500$ 200,000$ 5,187,300$ Southwest Industrial Park Amendment (WPS Utilities)331,300$-$ State Trust Fund Loan Railroad Spur for Southwest Industrial Park 1,807,000$-$ Private Contribution Total 5,187,300$1,959,500$ Sources of Funds General Fund (City Contribution) Total Federal Grant State Grant Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds TID #7 Donations WDOT Grant Previously Authorized but not Borrowed Project Project Total City Contribution Marion Road Redevelopment Area Remediation 520,000$370,000$ Jeld Wen Zone Riverwalk - West, Phase 2 of 5, Year 1 of 1 Construction 1,279,000$639,500$ South Shore Redevelopment Sites 1,250,000$950,000$ 2016 - 45 2016 - 45 2016 CIP Summary CIP Section Assessment Other/WDOT City/Utility Total Street 1,529,600$1,623,400$2,801,100$5,954,100$ Storm 179,800$450,400$10,047,400$10,677,600$ Wastewater 450,700$3,950,200$12,165,200$16,566,100$ Water 23,000$-$6,480,400$6,503,400$ Sidewalk 1,030,800$-$395,500$1,426,300$ Traffic -$324,000$261,000$585,000$ Total 3,213,900$6,348,000$32,150,600$41,712,500$ Public Infrastructure Improvements - Other Utilities 649,000$ Public Infrastructure Improvements - Wastewater Utility 4,884,700$ Traffic Improvements 105,000$ Public Property Improvements - Utility 925,000$ Tax Increment Financing (TIF) Districts Improvements 5,187,300$ 649,000$ Public Infrastructure Improvements - Water Utility 3,145,000$3,140,500$ Section Section Total City/Utility Contribution Comprehensive Streets/Utility Improvements 15,009,200$11,136,100$ Comprehensive Streets - New Development 435,300$17,900$ Public Infrastructure Improvements - Other Streets 9,964,300$6,313,100$ 4,049,000$ 6,630,000$Public Infrastructure Improvements - Storm Water Utility 6,650,000$ Public Infrastructure Improvements - Sidewalks 975,000$215,000$ 105,000$ Park Improvements 560,000$260,000$ Public Property Improvements - Non-Utility 3,966,480$3,150,400$ 382,000$ Major Equipment 2,170,000$2,170,000$ Major Equipment - Vehicles 4,265,000$3,030,920$ 1,959,500$ Total 59,559,980$43,877,120$ Special Assessments Borrowing 668,700$668,700$ 2016 - 46 2016 CIP Summary 2016 915,920$ 1,555,500$ 260,000$ 2,570,300$ 254,000$ 607,000$ 4,202,600$ 6,017,400$ 26,677,200$ 511,300$ 668,700$ 3,213,900$Fund Amount 1,009,500$Storm 10,047,400$ 2,143,800$Wastewater 13,743,200$ 1,000,000$Water 7,012,400$ 1,216,080$Total 30,803,000$ 1,109,500$ 4,527,280$ 300,000$ 600,000$ 200,000$ 59,559,980$ WDOT Grant Previously Authorized but not Borrowed Donations Donations/Building Fund Private Contribution State DOT Contributions State Grant Federal Grant State Trust Fund Loan TID #7 Donations Special Assessments Borrowing Capital Cash Contribution Previously Borrowed Special Assessments Sources of Funds General Fund (City Contribution) Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Utility Funds Contribution Transit Fund Contribution Total 2016 - 47 2016 General Obligation Bonds TID Contribution General Obligation Notes State Trust Fund Loan General Fund Contribution Water Utility Sewer Utility Storm Utility Transit Fund Contribution Capital Cash Contribution Comprehensive Streets/Utility Improvements 2,610,000$-$-$-$85,600$-$-$-$-$-$ Comprehensive Streets - New Development 7,600$-$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Other Streets 375,000$-$-$-$164,400$52,500$250,000$250,000$-$-$ Public Infrastructure Improvements - Other Utilities -$-$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Storm Water Utility -$-$-$-$-$-$-$230,000$-$2,570,300$ Public Infrastructure Improvements - Water Utility -$-$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Wastewater Utility -$-$-$-$-$-$80,000$-$-$-$ Public Infrastructure Improvements - Sidewalks -$-$-$-$215,000$-$-$-$-$-$ Traffic Improvements -$-$-$-$105,000$-$-$-$-$-$ Park Improvements 260,000$-$-$-$-$-$-$-$-$-$ Public Property Improvements - Non-Utility -$-$2,704,480$180,000$185,920$-$-$-$260,000$-$ Public Property Improvements - Utility -$-$-$-$-$117,000$48,000$-$-$-$ Major Equipment -$-$860,000$-$85,000$-$25,000$-$-$-$ Major Equipment - Vehicles -$-$2,452,920$-$75,000$228,000$275,000$-$-$-$ Tax Increment Financing (TIF) District Improvements 950,000$1,009,500$-$331,300$-$-$-$-$-$-$ Special Assessment Borrowing -$-$668,700$-$-$-$-$-$-$-$ Total 4,202,600$1,009,500$6,686,100$511,300$915,920$397,500$678,000$480,000$260,000$2,570,300$ General Obligation Bonds/Notes/State Trust Fund Loan Total:11,400,000$ General Obligation Bonds & TID Contribution Utility Funds Contribution 2016 - 48 2016 Comprehensive Streets/Utility Improvements Comprehensive Streets - New Development Public Infrastructure Improvements - Other Streets Public Infrastructure Improvements - Other Utilities Public Infrastructure Improvements - Storm Water Utility Public Infrastructure Improvements - Water Utility Public Infrastructure Improvements - Wastewater Utility Public Infrastructure Improvements - Sidewalks Traffic Improvements Park Improvements Public Property Improvements - Non-Utility Public Property Improvements - Utility Major Equipment Major Equipment - Vehicles Tax Increment Financing (TIF) District Improvements Special Assessment Borrowing Total General Obligation Bonds/Notes/State Trust Fund Loan Total: Water Bonds Sewer Bonds Storm Bonds Streets/Sidewalks Utilities WDOT Grants Developer Reimb. Previous Borrowing Total 3,003,400$2,547,200$2,889,900$1,186,000$543,300$2,143,800$-$-$-$-$-$15,009,200$ 5,000$2,800$2,500$163,400$-$-$-$-$254,000$-$-$435,300$ -$4,946,200$275,000$451,000$-$-$-$-$-$3,200,200$-$9,964,300$ 279,000$370,000$-$-$-$-$-$-$-$-$-$649,000$ -$-$3,829,700$-$20,000$-$-$-$-$-$-$6,650,000$ 3,140,500$-$-$-$4,500$-$-$-$-$-$-$3,145,000$ -$3,969,000$-$-$85,700$-$-$-$-$750,000$-$4,884,700$ -$-$-$760,000$-$-$-$-$-$-$-$975,000$ -$-$-$-$-$-$-$-$-$-$-$105,000$ -$-$-$-$-$-$300,000$-$-$-$-$560,000$ -$-$-$-$-$-$600,000$36,080$-$-$-$3,966,480$ 187,000$30,000$-$-$-$-$-$-$-$543,000$-$925,000$ -$1,200,000$-$-$-$-$-$-$-$-$-$2,170,000$ -$-$-$-$-$-$-$1,200,000$-$34,080$-$4,265,000$ -$-$-$-$-$1,000,000$607,000$1,089,500$-$-$200,000$5,187,300$ -$-$-$-$-$-$-$-$-$-$-$668,700$ 6,614,900$13,065,200$6,997,100$2,560,400$653,500$3,143,800$1,507,000$2,325,580$254,000$4,527,280$200,000$59,559,980$ Total Revenue Bonds:26,677,200$Total Assessments:3,213,900$ Previously Authorized but not Borrowed Revenue Bonds Special Assessments Donations/Bldg Fund/ Private Contribution 2016 - 49 2017 CIP Comprehensive Streets/Utility Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Public Infrastructure Improvements - Other Streets . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 Public Infrastructure Improvements - Storm Water Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Public Infrastructure Improvements - Water Utility . . . . . . . . . . . . . . . . . . . . . . . .12 Public Infrastructure Improvements - Wastewater Utility . . . . . . . . . . . . . . . . . . . . . . . .14 Public Infrastructure Improvements - Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20 Public Property Improvements - Non-Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Public Property Improvements - Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26 Major Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29 Major Equipment - Vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30 Tax Increment Financing (TIF) Districts Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32 2017 CIP Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35 2017 Borrowing Spreadsheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36 2017 - 1 Comprehensive Streets/Utility Improvements Project Descriptions New York Avenue Reconstruction 2,732,100$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle PASER Rating: 3 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Wisconsin Street to Main Street. Proposed 32'-36' concrete pavement in 53'-60' right-of-way. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and stripe facility. Age of Infrastructure: Sanitary - 1885, 1889, and 1981 Water - Pre-1920's Storm - 1968 and 1980 CIP Section Assessment Other City Total Street 163,500$-$567,900$731,400$ Storm 25,500$-$454,500$480,000$ Wastewater 71,800$-$542,200$614,000$ Water -$-$787,100$787,100$ Sidewalk 50,800$-$33,800$84,600$ Traffic -$-$35,000$35,000$ Total 311,600$-$2,420,500$2,732,100$ 2017 - 2 East Murdock Avenue Reconstruction 2,164,900$ Document/Study/Planning Document: N/A PASER Rating: 3 Full reconstruction of the street, including public utilities and laterals, from railroad tracks to Bowen Street. Proposed 42' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1902 and 1972 Water - Pre-1920's Storm - 1958 CIP Section Assessment Other City Total Street 246,800$-$278,200$525,000$ Storm 4,500$-$213,500$218,000$ Wastewater 12,600$-$601,400$614,000$ Water 11,800$-$661,600$673,400$ Sidewalk 29,700$-$19,800$49,500$ Traffic -$-$85,000$85,000$ Total 305,400$-$1,859,500$2,164,900$ 2017 - 2 Comprehensive Streets/Utility Improvements Project Descriptions Oregon Street Reconstruction 8,059,000$ Document/Study/Planning Document: N/A PASER Rating: 6 Full reconstruction of the street, including public utilities and laterals,from West 8th Avenue to West 16th Avenue. Proposed 44' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Storm sewer will be extended to West 6th Avenue in order to connect to existing storm sewer outfall. Age of Infrastructure: Sanitary - New Interceptor Sewer Water - Various Storm - 1906 CIP Section Assessment Other City Total Street 569,300$859,000$1,428,300$ Storm 75,800$848,300$924,100$ Wastewater 133,000$3,569,300$3,702,300$ Water -$1,430,100$1,430,100$ Sidewalk 74,500$49,700$124,200$ Traffic -$450,000$450,000$ Total 852,600$-$7,206,400$8,059,000$ 3,889,000$Bay Shore Drive Reconstruction 2017 - 3 3,889,000$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle PASER Rating: 3, 4 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Mill Street to Eveline Street. Proposed 32' concrete pavement in 54'-60' right-of-way. Sidewalk sections will be repaired/installed as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and/or shareway facility. Age of Infrastructure: Sanitary - 1936, 1938, and 1986 Water - Pre-1920's Storm - 1905, 1909, 1915, and 1978 CIP Section Assessment Other City Total Street 272,500$-$635,400$907,900$ Storm 36,000$-$483,000$519,000$ Wastewater 170,400$-$851,900$1,022,300$ Water 20,200$-$1,306,200$1,326,400$ Sidewalk 68,000$-$45,400$113,400$ Total 567,100$-$3,321,900$3,889,000$ Bay Shore Drive Reconstruction 2017 - 3 Comprehensive Streets/Utility Improvements Section Summary CIP Section Assessment Other City Total Street 1,252,100$-$2,340,500$3,592,600$ Storm 141,800$-$1,999,300$2,141,100$ Wastewater 387,800$-$5,564,800$5,952,600$ Water 32,000$-$4,185,000$4,217,000$ Sidewalk 223,000$-$148,700$371,700$ Traffic -$-$570,000$570,000$ Total 2,036,700$-$14,808,300$16,845,000$ 2017 -$ -$ 3,059,200$Fund Amount -$Storm 1,999,300$ 11,749,100$Wastewater 5,564,800$ Special Assessments Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Total 16,845,000$14,808,300$ Sources of Funds General Fund (City Contribution) Project Project Total City Contribution Bay Shore Drive Reconstruction 3,889,000$3,321,900$ New York Avenue Reconstruction 2,732,100$2,420,500$ East Murdock Avenue Reconstruction 2,164,900$1,859,500$ Oregon Street Reconstruction 8,059,000$7,206,400$ 2017 - 4 11,749,100$Wastewater 5,564,800$ 2,036,700$Water 4,185,000$ -$Total 11,749,100$ -$ 16,845,000$ Special Assessments State DOT Contributions Federal Grant Total Revenue Bonds 2017 - 4 Public Infrastructure Improvements - Other Streets Project Descriptions Osceola Street Paving 192,500$ Document/Study/Planning Document: N/A PASER Rating: 7, 10 Pave remaining portion of Osceola Street after completion of UW-Oshkosh Projects on adjacent parcels. CIP Section Assessment Other City Total Street 89,000$-$97,000$186,000$ Storm -$-$1,500$1,500$ Wastewater -$-$1,500$1,500$ Water -$-$1,500$1,500$ Sidewalk -$-$2,000$2,000$ Total 89,000$-$103,500$192,500$ Asphalt Mill and Overlay Program (Annual)845,600$ Document/Study/Planning Document: N/A PASER Rating: Varies Project restores the asphalt surface of existing streets to a very good condition. Work can include curb and gutter repair; stone base course; and spot repairs to sanitary sewer, storm sewer, and water main systems. CIP Section Assessment Other City Total Street 287,500$-$248,100$535,600$ Storm -$-$235,000$235,000$ Wastewater -$-$50,000$50,000$ Water -$-$25,000$25,000$ Sidewalk -$-$-$-$ Total 287,500$-$558,100$845,600$ Concrete Pavement Repairs (Annual)145,000$ Document/Study/Planning Document: N/A PASER Rating: Varies Spot repairs to deteriorated panels of concrete pavement will be made on various arterial, collector, and local streets. Some work will be done in coordination with sanitary manhole rehabilitation project. CIP Section Assessment Other City Total Street -$-$100,000$100,000$ Storm -$-$15,000$15,000$ Wastewater -$-$15,000$15,000$ Water -$-$15,000$15,000$ Sidewalk -$-$-$-$ Total -$-$145,000$145,000$ 2017 - 5 Public Infrastructure Improvements - Other Streets Project Descriptions 396,900$ Document/Study/Planning Document: N/A PASER Rating: N/A Up-front engineering services to help in the design of 2018 CIP projects. CIP Section Assessment Other City Total Street -$-$14,400$14,400$ Storm -$-$185,000$185,000$ Wastewater -$-$185,000$185,000$ Water -$-$12,500$12,500$ Sidewalk -$-$-$-$ Total -$-$396,900$396,900$ Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2018 Construction Projects 2017 - 6 Public Infrastructure Improvements - Other Streets Section Summary CIP Section Assessment Other City Total Street 376,500$-$459,500$836,000$ Storm -$-$436,500$436,500$ Wastewater -$-$251,500$251,500$ Water -$-$54,000$54,000$ Sidewalk -$-$2,000$2,000$ Total 376,500$-$1,203,500$1,580,000$ 2017 -$ -$ -$ -$ -$ 461,500$Fund Amount -$Storm 436,500$ 742,000$Wastewater 251,500$ 376,500$Water 54,000$ -$Total 742,000$ -$ Previously Borrowed -$ 1,580,000$ Sources of Funds General Fund (City Contribution) Storm Water Utility Fund Contribution Wastewater Utility Fund Contribution Water Utility Fund Contribution Special Assessments State DOT Contributions Federal Grant Total Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2018 396,900$396,900$ Total 1,580,000$1,203,500$ Asphalt Mill and Overlay Program (Annual)845,600$558,100$ Concrete Pavement Repairs (Annual)145,000$145,000$ Project Project Total City Contribution Osceola Street Paving 192,500$103,500$ 2017 - 7 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Fernau Avenue Watershed Land Acquisition 2,000,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 160/200 Land acquisition for design and construction of regional storm water management detention basin and storm sewer upgrades for TID #27. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,000,000$2,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$2,000,000$2,000,000$ East Parkway Avenue Watershed Detention Basin Construction 500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Project Score: 145/200 Construction of dry detention basin west of railroad tracks between East Irving Avenue and East Parkway Avenue to reduce flooding impacts of heavy rainfall events within the East Parkway Avenue watershed. CIP Section Assessment Other Utility Total 2017 - 8 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$500,000$500,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$500,000$500,000$ 2017 - 8 Public Infrastructure Improvements - Storm Water Utility Project Descriptions West Murdock Avenue Watershed Study 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Perform watershed-wide analysis to identify flood reduction strategies. The West Murdock Avenue watershed is roughly bounded by Liberty Street on the east, New York Avenue on the south, Linwood Avenue on the north, and Algoma Boulevard and the Fox River on the west. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$300,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$300,000$300,000$ Sawyer Creek Watershed Study 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Update Sawyer Creek watershed storm water study to identify additional flood mitigation strategies. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$300,000$300,000$ Wastewater -$-$-$-$ 2017 - 9 Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$300,000$300,000$ Mini Storm Sewers/Storm Laterals 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Provide mini storm sewers and laterals to property owners that have requested them. The laterals allow property owners to connect to the storm sewer system without discharging water over the sidewalk. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$285,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$285,000$300,000$ 2017 - 9 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Storm Sewer in Easement 180,000$ Document/Study/Planning Document: N/A PASER Rating: N/A A storm sewer is proposed from Eichstadt Road to Logan Drive . This storm sewer is needed to provide service to a proposed residential subdivision. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$180,000$180,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$180,000$180,000$ South Park Area Basin Retrofit Construction 2,000,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,000,000$2,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ 2017 - 10 Sidewalk -$-$-$-$ Total -$-$2,000,000$2,000,000$ 2017 - 10 Public Infrastructure Improvements - Storm Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$5,565,000$5,580,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$5,565,000$5,580,000$ 2017 -$ -$ South Park Area Basin Retrofit Construction 2,000,000$2,000,000$ Sources of Funds General Fund (City Contribution) Storm Water Utility Fund Contribution Developer Contribution Total 5,580,000$5,565,000$ Mini Storm Sewers/Storm Laterals 300,000$285,000$ Storm Sewer in Easement 180,000$180,000$ Sawyer Creek Watershed Study 300,000$300,000$ Fernau Avenue Watershed Land Acquisition 2,000,000$2,000,000$ Project Project Total Utility Contribution West Murdock Avenue Watershed Study 300,000$300,000$ East Parkway Avenue Watershed Detention Basin Construction 500,000$500,000$ 2017 - 11 -$ -$ -$Fund Amount -$Storm 5,565,000$ 5,565,000$Wastewater -$ 15,000$Water -$ -$Total 5,565,000$ -$ -$ 5,580,000$Total Special Assessments State DOT Contributions Federal Grant State Grant General Obligation Notes Revenue Bonds Storm Water Utility Fund Contribution Developer Contribution Debt Financing: General Obligation Bonds 2017 - 11 Public Infrastructure Improvements - Water Utility Project Descriptions West Murdock Avenue Water Main Relays 1,098,900$ Document/Study/Planning Document: N/A PASER Rating: N/A Replace existing 6" water main with 8" water main,from Algoma Boulevard to Vinland Street. The existing water main has had a large amount of breaks and its replacement was requested by the Water Distribution Division. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$1,098,900$1,098,900$ Sidewalk -$-$-$-$ Total -$-$1,098,900$1,098,900$ West 6th Avenue Water Main Relays 490,000$ Document/Study/Planning Document: N/A PASER Rating: N/A 2017 - 12 Document/Study/Planning Document: N/A PASER Rating: N/A Replace existing 6" water main with 8" water main,from Reichow Street to Eagle Street . The existing water main has had a large amount of breaks and its replacement was requested by the Water Distribution Division. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$490,000$490,000$ Sidewalk -$-$-$-$ Total -$-$490,000$490,000$ 2017 - 12 Public Infrastructure Improvements - Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$1,588,900$1,588,900$ Sidewalk -$-$-$-$ Total -$-$1,588,900$1,588,900$ 2017 -$ -$ -$ -$Fund Amount -$Storm -$ 1,588,900$Wastewater -$ -$Water 1,588,900$ -$Total 1,588,900$ Sources of Funds General Fund (City Contribution) Water Utility Fund Contribution Developer Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Federal Grant Total 1,588,900$1,588,900$ West 6th Avenue Water Main Relays Project Project Total Utility Contribution West Murdock Avenue Water Main Relays 1,098,900$1,098,900$ 490,000$490,000$ 2017 - 13 -$Total 1,588,900$ -$ 1,588,900$Total State DOT Contributions Federal Grant 2017 - 13 Public Infrastructure Improvements - Wastewater Utility Project Descriptions 1,000,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Work includes identification and elimination of clear water entering the sanitary sewer system and implementation of CMOM/SECAP recommendations. Work can include manhole inspections and repairs, flow monitoring, and/or sewer lining or replacement. Sanitary sewer lining and grouting of laterals and mainline will be performed in areas that have newer concrete streets with aging sanitary sewer infrastructure. Televising inspections will be used to determine the areas of work. This helps to remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a significant problem. The sanitary sewer system is not designed to handle these flows. The result of the excess flow is sanitary sewer backups into residents' homes. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 62,500$-$937,500$1,000,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 62,500$-$937,500$1,000,000$ Oshkosh Avenue Area Sanitary Sewer Re-Route 653,200$ Document/Study/Planning Document: N/A PASER Rating: N/A Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 2017 - 14 Document/Study/Planning Document: N/A PASER Rating: N/A Re-route sanitary sewer along Oshkosh Avenue for new lift station. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 23,600$-$629,600$653,200$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 23,600$-$629,600$653,200$ 2017 - 14 Public Infrastructure Improvements - Wastewater Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 86,100$-$1,567,100$1,653,200$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 86,100$-$1,567,100$1,653,200$ 2017 -$ -$ -$ -$Fund Amount -$Storm -$ 1,567,100$Wastewater 1,567,100$ 86,100$Water -$ General Obligation Bonds General Obligation Notes Revenue Bonds Special Assessments State DOT Contributions Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Developer Contribution Debt Financing: Oshkosh Avenue Area Sanitary Sewer Re-Route 653,200$629,600$ Total 1,653,200$1,567,100$ Project Project Total Utility Contribution Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 1,000,000$937,500$ 2017 - 15 86,100$Water -$ -$Total 1,567,100$ -$ -$ 1,653,200$ Federal Grant Previously Borrowed Total Special Assessments State DOT Contributions 2017 - 15 Public Infrastructure Improvements - Sidewalks Project Descriptions Sidewalk Rehabilitation and Reconstruction Program 750,000$ Document/Study/Planning Document:N/A PASER Rating: N/A Program rotates through the City on a 10-year cycle to repair defective sidewalk squares. Program also includes citizen complaint locations. Handicap ramps are installed at intersections currently without ramps. Program will also fix deteriorated driveway aprons. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 550,000$-$200,000$750,000$ Total 550,000$-$200,000$750,000$ Sidewalk: New Walk Ordered In 65,000$ Document/Study/Planning Document:N/A PASER Rating: N/A Install new sidewalk along street segments without sidewalk. Selection to be coordinated through Pedestrian/Bicycle committee. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ 2017 - 16 Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 60,000$-$5,000$65,000$ Total 60,000$-$5,000$65,000$ Sidewalk: Subdivision Agreements 55,000$ Document/Study/Planning Document:N/A PASER Rating: N/A Install sidewalks at various locations within newer subdivisions. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 50,000$-$5,000$55,000$ Total 50,000$-$5,000$55,000$ 2017 - 16 Public Infrastructure Improvements - Sidewalks Section Summary CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 660,000$-$210,000$870,000$ Total 660,000$-$210,000$870,000$ 2017 210,000$ -$ -$Fund Amount -$Storm -$ -$Wastewater -$ 660,000$Water -$ -$Total -$ Revenue Bonds Special Assessments State DOT Contributions Federal Grant General Obligation Notes Total 870,000$210,000$ Sources of Funds General Fund (City Contribution) Developer Contribution Debt Financing: General Obligation Bonds Sidewalk: New Walk Ordered In 65,000$5,000$ Sidewalk: Subdivision Agreements 55,000$5,000$ Project Project Total City Contribution Sidewalk Rehabilitation and Reconstruction Program 750,000$200,000$ 2017 - 17 -$Total -$ -$ 870,000$ State DOT Contributions Federal Grant Total 2017 - 17 Traffic Improvements Project Descriptions Bicycle and Pedestrian Infrastructure 50,000$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle Circulation Plan Provide designated funds for bicycle and pedestrian infrastructure improvements. Primary improvements will be bicycle lane striping and symbols and bike facility signage for existing and future routes. Traffic Signal Equipment 45,000$ Document/Study/Planning Document: N/A This item pays for traffic signal equipment to be installed at various intersections as needed, in order to repair knockdowns and/or replace obsolete equipment. Typical purchases include poles, cabinets, controllers, and vehicle detection equipment. Install Pedestrian Countdown Signal Heads 25,000$ Document/Study/Planning Document: 2011 Bicycle and Pedestrian Circulation Plan This project facilitates a system-wide replacement of the City's signal heads (these are the upraised hand/walking symbols, which indicate to pedestrians when it is safe to cross the street). Pedestrian Accessibility Improvements 10,000$ Document/Study/Planning Document: 2011 Transit Development Plan 2017 - 18 Document/Study/Planning Document: 2011 Transit Development Plan This project will pay for paving and curbing improvements to bring high-usage transit stops into compliance with the Americans with Disabilities Act. Locations will be prioritized based on the level of current ridership, and the cost of making the improvement. LED Replacement 10,000$ Document/Study/Planning Document: N/A This item will involve replacement of LED signal heads at City-maintained traffic signals. 2017 - 18 Traffic Improvements Section Summary 2017 140,000$ -$ -$ -$ -$ 140,000$ Federal Grant Total Pedestrian Accessibility Improvements 10,000$10,000$ Sources of Funds General Fund (City Contribution) Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Total 140,000$140,000$ LED Replacement 10,000$10,000$ Traffic Signal Equipment 45,000$45,000$ Install Pedestrian Countdown Signal Heads 25,000$25,000$ Project Project Total City Contribution Bicycle and Pedestrian Infrastructure 50,000$50,000$ 2017 - 19 2017 - 19 Park Improvements Project Descriptions Fugleberg Park Play Equipment, Surfacing, Accessible Route, and Perimeter Walk 130,300$ Document/Study/Planning Document: Park and Open Space Plan and Donations:18,500$ Comprehensive Outdoor Recreation Plan The Park and Open Space Plan for the City recommends, as a high priority, an ADA-accessible route to the play structure; an accessible perimeter walk around the play structure; and the replacement of the play equipment at Fugleberg Park. The equipment was installed in 1999. The project will also include installation of poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than the existing wood fiber used in the playgrounds. Fugleberg Boat Launch Restrooms Update 80,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The restrooms at Fugleberg Park are in very poor condition, as noted in the updated Comprehensive Outdoor Recreation Plan, as well as in the citizen surveys for the Plan update. The project will include updating the entire restroom building to be ADA-compliant, including new plumbing, lighting, fixtures, ceiling, walls, partitions, etc. Teichmiller Park Restrooms Update 80,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The restrooms at Teichmiller Park are in very poor condition, as noted in the updated Comprehensive Outdoor Recreation Plan, as well as in citizen surveys for the Plan update. The project will include updating the entire restroom building, including new plumbing, lighting, fixtures, ceiling, walls, partitions, etc., to be ADA-compliant. Abe Rochlin Park Lighting 50,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The lights in Abe Rochlin Park are some of the oldest in the park system. The replacement of site lighting at Abe Rochlin Park is ranked as a high priority in the CORP. 2017 - 20 Park Improvements Section Summary 2017 -$ 321,800$ -$ -$ 18,500$ 340,300$Total General Obligation Bonds General Obligation Notes Revenue Bonds 321,800$ General Fund (City Contribution) Debt Financing: Total 340,300$ Donations Fugleberg Park Play Equipment, Surfacing, Accessible Route, and Perimeter Walk Project Project Total City Contribution Sources of Funds 111,800$ Fugleberg Boat Launch Restrooms Update 80,000$80,000$ Teichmiller Park Restrooms Update 80,000$80,000$ 130,300$ 50,000$Abe Rochlin Park Lighting 50,000$ 2017 - 21 Public Property Improvements - Non-Utility Project Descriptions Community Development: Great Neighborhoods Initiative 200,000$ Document/Study/Planning Document: Healthy Neighborhood Initiative/Donations: 100,000$ Strategic Plan/Comprehensive Plan Construct neighborhood improvements that support the Healthy Neighborhood Initiative in concert with Neighborhood Associations and neighborhood improvement partners. Projects are located in the right-of-way or on public property, and include streetscape improvements and signage, pedestrian and bicycle safety improvements, park improvements, safe routes to school improvements, and others identified and approved by the City Council. Blight Removal for Neighborhood Redevelopment 200,000$ Document/Study/Planning Document:Strategic Plan/Comprehensive Plan State Grant:20,000$ Acquisition, demolition, and remediation of various sites with WDNR permitting/site closure, if required. Riverwalk Signage 50,000$ Document/Study/Planning Document: Riverwalk Corridor Design Guidelines Purchase and installation of riverwalk signage and banners, way-finding signage, kiosks, and park regulations. Fire Department: Fire Station Floor Replacement 51,000$ Document/Study/Planning Document: N/A Fire Stations 17, 18, and 19 were built in 1997, 1998, and 1999 respectively. The floors in the hallways, offices, and kitchens in these stations were done in vinyl floor tile. This tile is beginning to wear and peel up, and requires a great deal of maintenance to retain an acceptable appearance. General Services: Roofing/HVAC Improvements 500,000$ Document/Study/Planning Document: Roofing and HVAC Study Ongoing program to address improvements for roofing and HVAC projects, based on McKinstry/Summit Designs HVAC Inventory Assessment and Specialty Engineering Group Roofing Inventory Assessment. Projects are prioritized annually based on condition. Safety Building Locker Room Renovations 120,000$ Document/Study/Planning Document: N/A The lower level locker rooms of the Safety Building are original to the building and have suffered much wear and tear in the last 25+ years. The locker rooms are in need of larger lockers, various plumbing and shower fixture upgrades, and new flooring. 2017 - 22 Public Property Improvements - Non-Utility Project Descriptions City Hall Window Replacement Program 50,000$ Document/Study/Planning Document: 2009 McKinstry Energy Efficiency Assessment Throughout City Hall, there is a mix of circa-1963, double-hung windows and circa-1980 aluminum frame windows. In both styles, many of the windows are either inoperable, have leaking seals causing fog/ condensation issues, or are misaligned/deficient and do not allow for proper weatherization/ waterproofing. It is our recommendation that we begin a phase-in of window replacement by floors and move towards higher-efficiency, weatherproof windows. Grand Opera House Stage Floor Replacement Operating Study 5,000$ Document/Study/Planning Document: N/A The Grand Opera House stage floor is 30 years old and was installed during the 1985 renovation. The stage floor has experienced major wear and tear over the last 30± years, and in some cases, the Grand staff has to lay down additional flooring to protect the actors from slivers and the uneven floors. The floor was treated and painted in the 2009 renovation to try to extend its useful life by a few years. A full stage floor replacement is recommended to ensure a safe working environment for actors and to improve the stage appearance for performances. Library: Library Building Envelope Project - Stone Replacement 285,000$ Document/Study/Planning Document: Facility Engineering, Inc. Study dated June 15, 2012 by Tom Gernetzke of Madison, WI. Updated with building inspection and memo dated 4/10/2015. Replace and repair failing stone elements on 2 architectural bands on the exterior of the library building. This is the second phase of a two-phase project. The first phase was completed in 2013, which included removing and replacing 9,000 linear feet of sealants for all exterior stone panels. Replacement of Vinyl Flooring 35,000$ Document/Study/Planning Document: 2012 Site Master Plan by Schaefer Land Design The current flooring was installed in 1994 when the library addition was constructed. Vinyl tiles are cracked and/or peeling due to building movement and traffic. Parks: Cemetery Roads Repaving 25,000$ Document/Study/Planning Document: N/A Re-pave deteriorating access roads in Riverside Cemetery. In 2009, 2013, and 2015, funds were allocated. The roads continue to be in very poor condition. 2017 - 23 Public Property Improvements - Non-Utility Project Descriptions Transportation: Parking Lot Improvements 1,000,000$ Document/Study/Planning Document: 2015 Parking Lot Assessment This allocates funding toward future reconstruction of municipal parking lots. LED Streetlighting Upgrades 25,000$ Document/Study/Planning Document: N/A This project would replace high-pressure sodium lights at various locations with LED lighting. HPS lights have a 3-5 year life and are not typically replaced with a CIP. LED lamps, conversely are expected to last 10-20 years and therefore qualify as a capital improvement. Purchase of Streetlighting Poles 25,000$ Document/Study/Planning Document: N/A The City owns over 1,000 streetlighting poles. While these poles are expected to have a long, serviceable life, we do lose poles through damage from car accidents (about half of which are hit and run/ unrecoverable). In addition, we are trying to expand the number of City-owned poles. This project would help to increase our inventory for both replacement of varying types of lighting poles we have and to allow for future expansion. Replace Bus Shelters 12,000$ Document/Study/Planning Document: 2011 Transit Development Plan Federal Grant:9,600$ This project would result in replacement of several older bus shelters. Pedestrian Accessibility Improvements 10,000$ Document/Study/Planning Document: 2011 Transit Development Plan This project will pay for paving and curbing improvements to bring high-usage transit stops into compliance with the Americans with Disabilities Act. Locations will be prioritized based on the level of current ridership, and the cost of making the improvement. 2017 - 24 Public Property Improvements - Non-Utility Section Summary 2017 160,000$ 2,400$ 25,000$ -$ 2,276,000$ -$ -$ 9,600$ 20,000$ 100,000$ 2,593,000$ State Grant Donations Total Transit Fund Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Perpetual Care Fund Contribution Pedestrian Accessibility Improvements 10,000$10,000$ State Trust Fund Loan Federal Grant Total 2,593,000$2,463,400$ Sources of Funds General Fund (City Contribution) Replace Bus Shelters 12,000$2,400$ Parking Lot Improvements 1,000,000$1,000,000$ LED Streetlighting Upgrades 25,000$25,000$ Cemetery Roads Repaving 25,000$25,000$ Purchase of Streetlighting Poles 25,000$25,000$ City Hall Window Replacement Program 50,000$50,000$ Grand Opera House Stage Floor Replacement Operating Study 5,000$5,000$ Library Building Envelope Project - Stone Replacement 285,000$285,000$ Replacement of Vinyl Flooring 35,000$35,000$ Riverwalk Signage 50,000$50,000$ Fire Station Floor Replacement 51,000$51,000$ Roofing/HVAC Improvements 500,000$500,000$ Safety Building Locker Room Renovations 120,000$120,000$ Blight Removal for Neighborhood Redevelopment 200,000$180,000$ Project Project Total City Contribution Great Neighborhoods Initiative 200,000$100,000$ 2017 - 25 Public Property Improvements - Utility Project Descriptions Washburn Water Tower Repainting and Add Mixing to Tower (Water Filtration)720,000$ Document/Study/Planning Document: N/A Washburn Tower is due for repainting to protect metal surfaces, adding mixing will improve water quality and the disinfection process. Punhoqua Area Lift Station (Wastewater)1,000,000$ Document/Study/Planning Document: N/A Sewer system improvements in the area of this lift station (originally installed in 1974) will require this station to be moved. Recently updated components will be reused in the new location. Roof Repairs for WWTP Complex (Wastewater)30,000$ Document/Study/Planning Document: N/A Repair several areas of our membrane roof that are fatigued due to age and exposure in order to protect infrastructure and equipment from water damage. Seal Aeration Tank Side Gates (Wastewater)75,000$ Document/Study/Planning Document: N/A To protect the integrity of the tank and the existing concrete from exposure and damage. 2017 - 26 2017 - 26 Public Property Improvements - Utility Projects Funded in Prior Years but Not Constructed Clearwell Replacement (Water Filtration)900,000$ Document/Study/Planning Document: WDNR 2007 Sanitary Survey; 2014 CH2M HILL Study The Water Filtration Plant clearwells store treated water prior to pumping into the water distribution system. The north and middle clearwells were installed in 1916 and the south clearwell was installed in the 1950's. These structures have exceeded their useful life and no longer meet WDNR Code requirements for in-ground water storage structures and need to be replaced. 2017 - 27 2017 - 27 Public Property Improvements - Utility Section Summary 2017 -$ -$ 720,000$ -$Fund Amount -$Storm -$ 1,105,000$Wastewater 1,105,000$ 1,825,000$Water 720,000$ Total 1,825,000$ General Obligation Notes Revenue Bonds Total Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Water Utility Fund Contribution Debt Financing: General Obligation Bonds Seal Aeration Tank Side Gates (Wastewater)75,000$75,000$ Total 1,825,000$1,825,000$ Punhoqua Area Lift Station (Wastewater)1,000,000$1,000,000$ Roof Repairs for WWTP Complex (Wastewater)30,000$30,000$ Project Project Total Utility Contribution Washburn Water Tower Repainting and Add Mixing to Tower (Water Filtration)720,000$720,000$ 2017 - 28 2017 - 28 Major Equipment Amount 320,000$ 80,000$ 75,000$ 50,000$ 40,000$ 18,000$ 200,000$ 3,000,000$ 750,000$ 410,000$ 300,000$ 250,000$ 65,000$ 25,000$ 5,583,000$ Section Summary 2017 -$ -$Fund Amount Storm -$ -$Wastewater 4,800,000$ 343,000$Water 200,000$ 4,840,000$Total 5,000,000$ 160,000$ 160,000$ 80,000$ 5,583,000$Total Sources of Funds General Fund (City Contribution) Wastewater Utility Fund Contribution Debt Financing: General Obligation Bonds Previously Borrowed Donations General Obligation Notes Revenue Bonds Replace Centrate Pumps WWTP Wastewater Federal Grant Total 2017 Major Equipment Self-Contained Breathing Apparatus Replacement Fire Department Replace Motor Control Centers 1-11 Wastewater Master Control Room Equipment Replacement (OCMS)General Services General ServicesGovernment Meeting Coverage Equipment Replacement Wastewater Replace Dissolved Aeration Flotation Thickner Drives Wastewater Bar Screen Rail Replacement Wastewater Video Equipment Replacement Program-Government Meeting Coverage (Room 404)General Services Air Compressor (replaces #215, 1978 Sullair)Street Major Equipment Department Safety Building Emergency Generator Replacement (Facilities)General Services Anaerobic Digester Mixing Upgrade Grit System Classifier Replacement Construction Wastewater Water FiltrationWater Filtration Plant Heat Boiler Replacement Dissolved Aeration Flotation Thickner Controls Replacement Wastewater 2017 - 29 Major Equipment - Vehicles Amount 45,000$ 25,000$ 78,000$ 75,000$ 75,000$ 37,000$ $ 25,000 7,000$ 95,000$ 65,000$ 80,000$ 10,000$ 275,000$ 205,000$ 275,000$ 40,000$ 45,000$ 155,000$ 50,000$ 18,000$ 45,000$ 265,000$ 40,000$ $ 95,000 100,000$ Transportation 40,000$ 150,000$ 50,000$ 1,500,000$ 30,000$ 190,000$ 45,000$ 39,000$ 85,000$ 4,354,000$ Electric Service Van (replaces #505, 1995) (Electrical) CNG Tandem-Axle Dump Truck with Stainless Steel Dump Body (replaces #833, 2006)Water Distribution Total 2017 Major Equipment - Vehicles Lift Station Service Truck with Hoist (replaces #976, 2002)Wastewater Paint Truck (replaces #510, 1998) (Signs)Transportation 3 - 35' Diesel Buses (replaces 2003) (Transit)Transportation Crew Cab Pickup Truck (replaces 1999 Suburban)Fire Department Major Equipment - Vehicles Department Area Truck with Wing and Plow (replaces #47, 2006 IHC) Hot Box (replaces #263, 2005 Stepp)Street Mower (replaces #424, 2002 Jacobsen HR9016)Parks Crack Filler (replaces #260, 2007 Crafco) Parks Parks Service Van (replaces 1997 GMC Vandura) (OCMS)General Services Pickup Truck (replaces #419, 2003 Cherolet 2500) Equipment Trailer (Cemetery)Parks CabOver Chip Truck (replaces #476, 1999) (Forestry)Parks Replace Amusement Train Parks Bobcat Skid Steer Loader (replaces #341, 2002) (Forestry)Parks Leaf Pickers (replaces P15 Jacobsen 720E, P16 Rodgers, P17 Gravely Pro- Vac)Parks Compact Excavator and Tilt Bed Trailer (replaces #441, 2008 John Deere)Parks 2 - Fairway Mowers (replaces 2002) (Golf Course)Parks Staff Van (replaces 2002) (Transit)Transportation StreetSnow Blower (replaces #171, 1993 Snogo) Trencher (replaces #509, 1996) (Electrical)Transportation 3/4-Ton Extended Cab Pickup Truck (Replaces #33, 2005 GMC)Street 1/2-Ton Extended Cab Pickup Truck with CNG (replaces #30, 2005 GMC) 1-Ton 4-Wheel Drive Regular Cab Pickup Truck with Stainless Steel Dump, with Tool Box (replaces #27, 2001 GMC)Street New 5-Ton Equipment Trailer Street Replace Utility Vehicle (Zoo) Tandem Dump Truck with Stainless Steel Box, with Slide-In V-Box and Pre- Wet, Plow and Wing (replaces #65, 2004 IH)Street Finish Roller, (replaces #160, 2002 Wacker)Street Tandem Dump Truck with Stainless Steel Box, with Slide-In V-Box and Pre- Wet, with Plow and Wing (replaces #66, 2005 IH)Street Street Street Tandem Dump Truck with Stainless Steel Box, with Slide-In V-Box and Pre- Wet, Plow and Wing (replaces #60, 1997 GMC)Street Street 3/4-Ton CNG Full-Size Van (replaces #818, 2005 Van)Water Distribution Ditch Witch/Vac-All (replaces #813, 2005)Water Distribution New Paint Removal Machine (Signs)Transportation 2017 - 30 Major Equipment - Vehicles Section Summary 2017 552,000$Fund Amount -$Storm -$ -$Wastewater 85,000$ Water 274,000$ -$Total 359,000$ 2,243,000$ 359,000$ 1,200,000$ 4,354,000$ Sources of Funds Total Water Utility Fund Contribution Debt Financing: General Obligation Bonds General Obligation Notes Revenue Bonds Federal Grant General Fund (City Contribution) Wastewater Utility Fund Contribution 2017 - 31 Tax Increment Financing (TIF) Districts Improvements Project Descriptions Clairville Road Water Main Loop 1,406,800$ Document/Study/Planning Document:N/A TIF: TID #23 West 20th Avenue to Industrial Park Tie-In . CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$1,406,800$1,406,800$ Sidewalk -$-$-$-$ Total -$-$1,406,800$1,406,800$ Marion Road Redevelopment Area Remediation 940,000$ Document/Study/Planning Document: Marion Road Redevelopment Plan State Grant:300,000$ TIF: TID #21 In order to implement the redevelopment and revitalization of the Marion Road Redevelopment Area, environmental contamination at three sites within this area needs to be remediated. Land Acquisition - 43 East 7th Avenue 800,000$ Document/Study/Planning Document: South Shore Redevelopment TIF: TID #20 and Donation from TID #7 Plan Land acquisition of 43 East 7th Avenue, based on agreement with CHAMCO, for implementation of the Fox Riverwalk Plan, Downtown Action Plan, and South Shore Redevelopment Plan. Jeld Wen Zone Riverwalk - Central, Year 1 of 2 Construction 396,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan State Grant:200,000$ TIF: TID #21 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. South Shore East - Riverwalk (Pioneer Drive), Year 1 of 2 Construction 238,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan TIF: TID #20 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, boat docks, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. 2017 - 32 Tax Increment Financing (TIF) Districts Improvements Project Descriptions Jeld Wen Zone Riverwalk - West of Oregon Street, Year 1 of 2 Construction 76,000$ Document/Study/Planning Document: Fox River Corridor-TIF: TID #21 Riverwalk Plan Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. 2017 - 33 Tax Increment Financing (TIF) Districts Improvements Section Summary 2017 -$ -$ 1,150,000$Fund Amount -$Storm -$ 1,406,800$Wastewater -$ 800,000$Water 1,406,800$ -$Total 1,406,800$ 500,000$ 3,856,800$ Jeld Wen Zone Riverwalk - West of Oregon Street, Year 1 of 2 Construction 76,000$76,000$ 940,000$Marion Road Redevelopment Area Remediation 396,000$ Jeld Wen Zone Riverwalk - Central, Year 1 of 2 Construction 800,000$800,000$Land Acquisition - 43 East 7th Avenue 196,000$ South Shore East - Riverwalk (Pioneer Drive), Year 1 of 2 Construction 238,000$238,000$ 640,000$ State Grant Total Federal Grant Developer Contribution Total TID #7 Donations Revenue Bonds General Obligation Notes General Obligation Bonds Debt Financing: 3,856,800$3,356,800$ Sources of Funds General Fund (City Contribution) Project Project Total City Contribution Clairville Road Water Main Loop 1,406,800$1,406,800$ 2017 - 34 2017 CIP Summary CIP Section Assessment Other City/Utility Total Street 1,628,600$-$2,800,000$4,428,600$ Storm 156,800$-$8,000,800$8,157,600$ Wastewater 473,900$-$7,383,400$7,857,300$ Water 32,000$-$5,827,900$5,859,900$ Sidewalk 883,000$-$360,700$1,243,700$ Traffic -$-$570,000$570,000$ Total 3,174,300$-$24,942,800$28,117,100$ 2017 1,062,000$ 720,000$ 2,400$ 25,000$ -$ 4,992,500$ 4,862,000$ 28,922,900$ 1,000,000$ 3,174,300$Fund Amount -$Storm 8,000,800$ 1,369,600$Wastewater 13,373,400$ 520,000$Water 8,428,700$ 800,000$Total 29,802,900$ 198,500$ 160,000$ 47,809,200$ 1,588,900$1,588,900$ Major Equipment 5,583,000$5,183,000$ Public Property Improvements - Non-Utility 2,593,000$2,463,400$ Public Property Improvements - Utility 1,825,000$1,825,000$ Traffic Improvements 140,000$140,000$ Park Improvements 340,300$ 47,809,200$42,386,800$ Major Equipment - Vehicles 4,354,000$3,154,000$ Tax Increment Financing (TIF) Districts Improvements 3,856,800$3,356,800$ Special Assessments Borrowing 1,000,000$1,000,000$ 321,800$ Public Infrastructure Improvements - Wastewater Utility 1,653,200$1,567,100$ Public Infrastructure Improvements - Sidewalks 870,000$210,000$ 1,580,000$1,203,500$ Public Infrastructure Improvements - Storm Water Utility 5,580,000$5,565,000$ Section Total City/Utility Contribution Comprehensive Streets/Utility Improvements 16,845,000$14,808,300$ Special Assessments Federal Grant TID #7 Donations State DOT Contributions Section Public Infrastructure Improvements - Other Streets Total Public Infrastructure Improvements - Water Utility Total Donations Special Assessments Borrowing Sources of Funds General Fund (City Contribution) Developer Contribution Debt Financing: General Obligation Bonds Utility Funds Contribution Transit Fund Contribution Perpetual Care Fund Contribution General Obligation Notes State Grant Previously Borrowed Revenue Bonds 2017 - 35 2017 General Obligation Bonds TID Contribution General Obligation Notes General Fund Contribution Water Utility Sewer Utility Storm Utility Transit Fund Contribution Perpetual Care Fund Contribution Comprehensive Streets/Utility Improvements 3,059,200$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Other Streets 461,500$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Storm Water Utility -$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Water Utility -$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Wastewater Utility -$-$-$-$-$-$-$-$-$ Public Infrastructure Improvements - Sidewalks -$-$-$210,000$-$-$-$-$-$ Traffic Improvements -$-$-$140,000$-$-$-$-$-$ Park Improvements 321,800$-$-$-$-$-$-$-$-$ Public Property Improvements - Non-Utility -$-$2,276,000$160,000$-$-$-$2,400$25,000$ Public Property Improvements - Utility -$-$-$-$720,000$-$-$-$-$ Major Equipment -$-$343,000$-$-$-$-$-$-$ Major Equipment - Vehicles -$-$2,243,000$552,000$-$-$-$-$-$ Tax Increment Financing (TIF) District Improvements 1,150,000$800,000$-$-$-$-$-$-$-$ Special Assessment Borrowing -$-$1,000,000$-$-$-$-$-$-$ Total 4,992,500$800,000$5,862,000$1,062,000$720,000$-$-$2,400$25,000$ General Obligation Bonds/Notes Total:10,854,500$ General Obligation Bonds & TID Contribution Utility Funds Contribution 2017 - 36 2017 Comprehensive Streets/Utility Improvements Public Infrastructure Improvements - Other Streets Public Infrastructure Improvements - Storm Water Utility Public Infrastructure Improvements - Water Utility Public Infrastructure Improvements - Wastewater Utility Public Infrastructure Improvements - Sidewalks Traffic Improvements Park Improvements Public Property Improvements - Non-Utility Public Property Improvements - Utility Major Equipment Major Equipment - Vehicles Tax Increment Financing (TIF) District Improvements Special Assessment Borrowing Total General Obligation Bonds/Notes Total: Water Bonds Sewer Bonds Storm Bonds Streets/Sidewalks Utilities WDOT Donations Grants Developer Reimb. Previously Borrowed Total 4,185,000$5,564,800$1,999,300$1,475,100$561,600$-$-$-$-$-$16,845,000$ 54,000$251,500$436,500$376,500$-$-$-$-$-$-$1,580,000$ -$-$5,565,000$-$15,000$-$-$-$-$-$5,580,000$ 1,588,900$-$-$-$-$-$-$-$-$-$1,588,900$ -$1,567,100$-$-$86,100$-$-$-$-$-$1,653,200$ -$-$-$660,000$-$-$-$-$-$-$870,000$ -$-$-$-$-$-$-$-$-$-$140,000$ -$-$-$-$-$-$18,500$-$-$-$340,300$ -$-$-$-$-$-$100,000$29,600$-$-$2,593,000$ -$1,105,000$-$-$-$-$-$-$-$-$1,825,000$ 200,000$4,640,000$-$-$-$-$80,000$160,000$-$160,000$5,583,000$ 274,000$85,000$-$-$-$-$-$1,200,000$-$-$4,354,000$ 1,406,800$-$-$-$-$-$-$500,000$-$-$3,856,800$ -$-$-$-$-$-$-$-$-$-$1,000,000$ 7,708,700$13,213,400$8,000,800$2,511,600$662,700$-$198,500$1,889,600$-$160,000$47,809,200$ Total Revenue Bonds:28,922,900$Total Assessments:3,174,300$ Revenue Bonds Special Assessments 2017 - 37 2018 CIP Comprehensive Streets/Utility Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Public Infrastructure Improvements - Other Streets . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 Public Infrastructure Improvements - Storm Water Utility. . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 Public Infrastructure Improvements - Wastewater Utility . . . . . . . . . . . . . . . . . . . . . . . .14 Public Infrastructure Improvements - Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Public Property Improvements - Non-Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25 Public Property Improvements - Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31 Major Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32 Major Equipment - Vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33 Tax Increment Financing (TIF) Districts Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34 2018 - 1 Comprehensive Streets/Utility Improvements Project Descriptions Bowen Street Reconstruction 4,020,100$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle PASER Rating: 4, 6 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Otter Avenue to East Parkway Avenue. Proposed 34' concrete pavement in 49.5' right-of-way. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and stripe facility. Age of Infrastructure: Sanitary - 1884, 1886, and 1986 Water - Pre-1920's Storm - 1958 and 1969 CIP Section Assessment Other City Total Street 312,700$-$814,300$1,127,000$ Storm 54,000$-$1,253,000$1,307,000$ Wastewater 113,900$-$404,000$517,900$ Water -$-$767,200$767,200$ Sidewalk 50,400$-$75,600$126,000$ Traffic -$-$175,000$175,000$ Total 531,000$-$3,489,100$4,020,100$ 2018 - 2 Oregon Street Reconstruction 7,766,300$ Document/Study/Planning Document: N/A PASER Rating: 3, 6 Full reconstruction of the street, including public utilities and laterals,from West 16th Avenue to West 21st Avenue. Proposed 44' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed.Project includes the construction of a new interceptor sewer and new water main. Age of Infrastructure: Storm - 1960 CIP Section Assessment Other City Total Street 622,000$1,334,200$1,956,200$ Storm 66,800$554,300$621,100$ Wastewater 138,900$3,713,000$3,851,900$ Water -$1,025,100$1,025,100$ Sidewalk 54,800$82,200$137,000$ Traffic -$175,000$175,000$ Total 882,500$-$6,883,800$7,766,300$ 2018 - 2 Comprehensive Streets/Utility Improvements Project Descriptions Waugoo Avenue Reconstruction 84,100$ Document/Study/Planning Document: N/A PASER Rating: 4 Full reconstruction of the street, including public utilities and laterals,from Bowen Street to Mill Street. Proposed 32' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1969 and 1986 Water - Pre-1920's Storm - None Present CIP Section Assessment Other City Total Street 1,600$-$16,600$18,200$ Storm -$-$17,000$17,000$ Wastewater -$-$16,200$16,200$ Water -$-$30,400$30,400$ Sidewalk 900$-$1,400$2,300$ Total 2,500$-$81,600$84,100$ Mill Street Reconstruction 370,600$ Document/Study/Planning Document: N/A PASER Rating: 4 2018 - 3 Document/Study/Planning Document: N/A PASER Rating: 4 Full reconstruction of the street, including public utilities and laterals,from Bowen Street to Otter Avenue. Proposed 32' concrete pavement in 56.5'-60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1932 and 1986 Water - None Present Storm - None Present CIP Section Assessment Other City Total Street 39,600$-$177,800$217,400$ Storm 6,000$-$104,000$110,000$ Wastewater 2,000$-$9,400$11,400$ Water -$-$4,800$4,800$ Sidewalk 10,800$-$16,200$27,000$ Total 58,400$-$312,200$370,600$ 2018 - 3 Comprehensive Streets/Utility Improvements Project Descriptions Grand Street Reconstruction 1,139,400$ Document/Study/Planning Document: N/A PASER Rating: 2 Full reconstruction of the street, including public utilities and laterals,from East Parkway Avenue to East Irving Avenue . Proposed 30' concrete pavement in 50' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1892 and 1902 Water - Pre-1920's Storm - 1936 and 1958 CIP Section Assessment Other City Total Street 105,700$-$233,600$339,300$ Storm 21,800$-$218,300$240,100$ Wastewater 48,900$-$188,900$237,800$ Water -$-$277,200$277,200$ Sidewalk 18,000$-$27,000$45,000$ Total 194,400$-$945,000$1,139,400$ Bay Shore Drive Reconstruction 550,300$ Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 3 2018 - 4 Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 3 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Eveline Street to Lake Street. Proposed 32' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and/or shareway facility. Age of Infrastructure: Sanitary - 1936 and 1938 Water - Pre-1920's Storm - None Present CIP Section Assessment Other City Total Street 37,300$-$70,700$108,000$ Storm 3,800$-$54,300$58,100$ Wastewater 16,000$-$167,900$183,900$ Water -$-$186,800$186,800$ Sidewalk 5,400$-$8,100$13,500$ Total 62,500$-$487,800$550,300$ 2018 - 4 Comprehensive Streets/Utility Improvements Project Descriptions Lake Street Reconstruction 1,819,100$ Document/Study/Planning Document: N/A PASER Rating: 3 Full reconstruction of the street, including public utilities and laterals,from Bay Shore Drive to Ceape Avenue. Proposed 32' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1936 Water - Pre-1920's Storm - 1902 and 1978 CIP Section Assessment Other City Total Street 214,600$-$328,800$543,400$ Storm 33,000$-$296,000$329,000$ Wastewater 83,900$-$353,600$437,500$ Water 4,000$-$437,700$441,700$ Sidewalk 27,000$-$40,500$67,500$ Total 362,500$-$1,456,600$1,819,100$ Punhoqua Street Reconstruction 1,018,100$ Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 3, 8 Circulation Plan 2018 - 5 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Oshkosh Avenue to Rainbow Drive. Proposed 32' concrete pavement in 66' right-of-way. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and/or shareway facility. Age of Infrastructure: Sanitary - 1974, 1985, and 2008 Water - Pre-1920's and 1956 Storm - None Present CIP Section Assessment Other City Total Street 112,700$-$166,300$279,000$ Storm 14,300$-$226,800$241,100$ Wastewater 20,500$-$106,700$127,200$ Water -$-$318,100$318,100$ Sidewalk 21,100$-$31,600$52,700$ Total 168,600$-$849,500$1,018,100$ 2018 - 5 Comprehensive Streets/Utility Improvements Section Summary CIP Section Assessment Other City Total Street 1,446,200$-$3,142,300$4,588,500$ Storm 199,700$-$2,723,700$2,923,400$ Wastewater 424,100$-$4,959,700$5,383,800$ Water 4,000$-$3,047,300$3,051,300$ Sidewalk 188,400$-$282,600$471,000$ Traffic -$-$350,000$350,000$ Total 2,262,400$-$14,505,600$16,768,000$ 2018 - 6 2018 - 6 Public Infrastructure Improvements - Other Streets Project Descriptions West 9th Avenue Utility Relocation Easement Acquisition 189,800$ Document/Study/Planning Document: N/A PASER Rating: 5, 6 This project includes the reconstruction of West 9th Avenue,from Knapp Street to Michigan Street. Project includes new public utilities and the undergrounding of electric cable, and telephone.This phase includes undergrounding of utilities. CIP Section Assessment Other City Total Street -$-$189,800$189,800$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$189,800$189,800$ Asphalt Mill and Overlay Program (Annual)885,000$ Document/Study/Planning Document: N/A PASER Rating: Varies 2018 - 7 Document/Study/Planning Document: N/A PASER Rating: Varies Project restores the asphalt surface of existing streets to a very good condition. Work can include curb and gutter repair; stone base course; and spot repairs to sanitary sewer, storm sewer, and water main systems. CIP Section Assessment Other City Total Street 287,500$-$287,500$575,000$ Storm -$-$235,000$235,000$ Wastewater -$-$50,000$50,000$ Water -$-$25,000$25,000$ Sidewalk -$-$-$-$ Total 287,500$-$597,500$885,000$ 2018 - 7 Public Infrastructure Improvements - Other Streets Project Descriptions Concrete Pavement Repairs (Annual)210,000$ Document/Study/Planning Document: N/A PASER Rating: Varies Spot repairs to deteriorated panels of concrete pavement will be made on various arterial, collector, and local streets. Some work will be done in coordination with sanitary manhole rehabilitation project. CIP Section Assessment Other City Total Street -$-$165,000$165,000$ Storm -$-$15,000$15,000$ Wastewater -$-$15,000$15,000$ Water -$-$15,000$15,000$ Sidewalk -$-$-$-$ Total -$-$210,000$210,000$ 396,900$ Document/Study/Planning Document: N/A PASER Rating: N/A Up-front engineering services to help in the design of 2019 CIP projects. CIP Section Assessment Other City Total Street -$-$14,400$14,400$ Storm -$-$185,000$185,000$ Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2019 Construction Projects 2018 - 8 Storm -$-$185,000$185,000$ Wastewater -$-$185,000$185,000$ Water -$-$12,500$12,500$ Sidewalk -$-$-$-$ Total -$-$396,900$396,900$ 2018 - 8 Public Infrastructure Improvements - Other Streets Section Summary CIP Section Assessment Other City Total Street 287,500$-$656,700$944,200$ Storm -$-$435,000$435,000$ Wastewater -$-$250,000$250,000$ Water -$-$52,500$52,500$ Sidewalk -$-$-$-$ Total 287,500$-$1,394,200$1,681,700$ 2018 - 9 2018 - 9 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Johnson Creek Watershed Land Acquisition 2,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Conduct land acquisition for identified flood reduction alternatives in watershed. The Johnson Creek Watershed generally encompasses an area of approximately one-half mile wide, from the the intersection of Knapp Street and C.T.H. N, northeasterly to Lake Winnebago. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,500,000$2,500,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$2,500,000$2,500,000$ Sawyer Creek Watershed Land Acquisition 2,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Perform land acquisition for construction of additional strategies. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,500,000$2,500,000$ Wastewater -$-$-$-$ 2018 - 10 Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$2,500,000$2,500,000$ Gallups/Merritts Creek Watershed Design 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A The watershed generally encompasses an area starting southwest of the City of Oshkosh, near near S.T.H. 26 and C.T.H. N and northeasterly towards West 28th Avenue and South Main Street. Major landmarks within the watershed include the Ford Festival Grounds and the Airport Industrial Park (between West 35th Avenue and West 29th Avenue). CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$300,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$300,000$300,000$ 2018 - 10 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Stringham Watershed Design 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A This project will include dredging sediment from lagoons, repairing shoreline erosion, and reconfiguring lagoons for improved storm water management. The Stringham watershed generally encompasses an area from the Universal Business Park, northeasterly to Iowa Street at the Fox River. Major landmarks within the watershed include the Vulcan Quarry and South Park. This project will help reduce the flooding impacts experienced in the South Park vicinity and the Ohio Street area between West 9th Avenue and South Park Avenue. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$300,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$300,000$300,000$ Campbell Creek Watershed Study 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Section Assessment Other Utility Total Street -$-$-$-$ 2018 - 11 Street -$-$-$-$ Storm -$-$300,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$300,000$300,000$ Fernau Avenue Watershed Design 250,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Design of first identified flood reduction alternative. The Fernau Avenue watershed generally encompasses an area from the Canadian National railroad spur in the north and the Northwest Industrial Park north of Snell Road, and from Progress Drive east to Lake Winnebago. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$250,000$250,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$250,000$250,000$ 2018 - 11 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Mini Storm Sewers/Storm Laterals 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Provide mini storm sewers and laterals to property owners that have requested them. The laterals allow property owners to connect to the storm sewer system without discharging water over the sidewalk. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$285,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$285,000$300,000$ 2018 - 12 2018 - 12 Public Infrastructure Improvements - Storm Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$6,435,000$6,450,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$6,435,000$6,450,000$ 2018 - 13 2018 - 13 Public Infrastructure Improvements - Wastewater Utility Project Descriptions 1,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Work includes identification and elimination of clear water entering the sanitary sewer system and implementation of CMOM/SECAP recommendations. Work can include manhole inspections and repairs, flow monitoring, and/or sewer lining or replacement. Sanitary sewer lining and grouting of laterals and mainline will be performed in areas that have newer concrete streets with aging sanitary sewer infrastructure. Televising inspections will be used to determine the areas of work. This helps to remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a significant problem. The sanitary sewer system is not designed to handle these flows. The result of the excess flow is sanitary sewer backups into residents' homes. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$1,500,000$1,500,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,500,000$1,500,000$ Buchanan Avenue Sanitary Sewer Relay 360,400$ Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 2018 - 14 Buchanan Avenue Sanitary Sewer Relay 360,400$ Document/Study/Planning Document: N/A PASER Rating: 8 Construction of sanitary sewer relay,from North Eagle Street to Sawyer Creek . Street will be re-surfaced with cold mix asphalt. Age of Infrastructure: Sanitary - 1960 and 1970 CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 91,700$-$268,700$360,400$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 91,700$-$268,700$360,400$ 2018 - 14 Public Infrastructure Improvements - Wastewater Utility Project Descriptions North Eagle Street Sanitary Sewer Relay 215,700$ Document/Study/Planning Document: N/A PASER Rating: N/A Construction of sanitary sewer relay on North Eagle Street from Maple Avenue to Sawyer Creek. Age of Infrastructure: Sanitary - 1965, 1966, and 1973 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 20,500$-$195,200$215,700$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 20,500$-$195,200$215,700$ Hawk Street Sanitary Sewer Relay 121,900$ Document/Study/Planning Document: N/A PASER Rating: 1 Construction of sanitary sewer relay,from Buchanan Avenue to Sawyer Creek. Street will be re-surfaced with cold mix asphalt. 2018 - 15 re-surfaced with cold mix asphalt. Age of Infrastructure: Sanitary - 1965 CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 31,100$-$90,800$121,900$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 31,100$-$90,800$121,900$ 2018 - 15 Public Infrastructure Improvements - Wastewater Utility Project Descriptions Punhoqua Street Sanitary Sewer Relay 99,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Construction of sanitary sewer relay,from Oshkosh Avenue to Maple Avenue. Street will be re-surfaced with cold mix asphalt. Age of Infrastructure: Sanitary - 1938 CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 9,300$-$89,700$99,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 9,300$-$89,700$99,000$ Maple Avenue Sanitary Sewer Relay 99,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Construction of sanitary sewer relay,from Punhoqua Street to North Eagle Street. Street will be re-surfaced with cold mix asphalt. 2018 - 16 Age of Infrastructure: Sanitary - 1924 CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 61,500$-$141,000$202,500$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 61,500$-$141,000$202,500$ 2018 - 16 Public Infrastructure Improvements - Wastewater Utility Project Descriptions Vacated Arthur Avenue Sanitary Sewer Relay 65,500$ Document/Study/Planning Document: N/A PASER Rating: N/A Sanitary sewer relay on easement (vacated Arthur Avenue). Age of Infrastructure: Sanitary - 1965 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$65,500$65,500$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$65,500$65,500$ 2018 - 17 2018 - 17 Public Infrastructure Improvements - Wastewater Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 214,100$-$2,350,900$2,565,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 214,100$-$2,350,900$2,565,000$ 2018 - 18 2018 - 18 Public Infrastructure Improvements - Sidewalks Project Descriptions Sidewalk Rehabilitation and Reconstruction Program 750,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Program rotates through the City on a 10-year cycle to repair defective sidewalk squares. Program also includes citizen complaint locations. Handicap ramps are installed at intersections currently without ramps. Program will also fix deteriorated driveway aprons. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 550,000$-$200,000$750,000$ Total 550,000$-$200,000$750,000$ Sidewalks: New Walk Ordered In 65,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Install new sidewalk along street segments without sidewalk. Selection to be coordinated through Pedestrian/Bicycle committee. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ 2018 - 19 Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 60,000$-$5,000$65,000$ Total 60,000$-$5,000$65,000$ Sidewalks: Subdivision Agreements 55,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Install sidewalks at various locations within newer subdivisions. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 50,000$-$5,000$55,000$ Total 50,000$-$5,000$55,000$ 2018 - 19 Public Infrastructure Improvements - Sidewalks Section Summary CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 660,000$-$210,000$870,000$ Total 660,000$-$210,000$870,000$ 2018 - 20 2018 - 20 Traffic Improvements Project Descriptions Bicycle and Pedestrian Infrastructure 50,000$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle Circulation Plan Provide designated funds for bicycle and pedestrian infrastructure improvements. Primary improvements will be bicycle lane striping and symbols and bike facility signage for existing and future routes. Traffic Signal Equipment 45,000$ Document/Study/Planning Document: N/A This item pays for traffic signal equipment to be installed at various intersections as needed, in order to repair knockdowns and/or replace obsolete equipment. Typical purchases include poles, cabinets, controllers, and vehicle detection equipment. Install Pedestrian Countdown Signal Heads 25,000$ Document/Study/Planning Document: 2011 Bicycle and Pedestrian Circulation Plan This project facilitates a system-wide replacement of the City's signal heads (these are the upraised hand/walking symbols, which indicate to pedestrians when it is safe to cross the street). LED Replacement 10,000$ Document/Study/Planning Document: N/A This item will involve replacement of LED signal heads at City-maintained traffic signals. Total 2018 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .130,000$ 2018 - 21 Park Improvements Project Descriptions Menominee Park Tennis Court Reconstruction 300,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan and Park Master Plan The tennis courts at Menominee Park will be reconstructed and the lights replaced. Menominee Park Parking Lot and Reetz Fields Design 250,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan and Park Master Plan Design/consulting services necessary for the redevelopment of parking lot (Miller's Bay) and Reetz ball fields. Spanbauer Field Improvements 250,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan Renovate the existing ball field, fencing, batting cage areas, and scoreboard. Rainbow Park Launch Improvements - South Phase Design 200,000$ Document/Study/Planning Document: Rainbow Park Master Plan & CORP Design consulting services necessary for the development of the parking lot and boat launch area. Anticipated construction in 2019. 2018 - 22 Stoegbauer Park Restrooms/Shelter 150,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan Construct a new restroom/small shelter building in Stoegbauer Park, as a result of public requests and increased use of the park. Stoegbauer Park Play Equipment and Surfacing 126,800$ Document/Study/Planning Document: Park and Open Space Plan The Park and Open Space Plan for the City recommends, as a high priority, the replacement of the play equipment at Stoegbauer Park. This equipment was installed in 1999. The project will include installation of poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than the existing wood fiber used in the playgrounds. 2018 - 22 Park Improvements Project Descriptions 120,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The Comprehensive Outdoor Recreation Plan for the City recommends, as a high priority, an ADA-accessible route to the play structure, as well as an accessible perimeter walk around the play structure. The play equipment was installed in 2003 and is due for replacement. The project will include installation of new play equipment; and poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than wood fiber. Mt. Vernon Tot Lot Play Equipment and Surfacing 80,000$ Document/Study/Planning Document: Park and Open Space Plan The Park and Open Space Plan for the City recommends, as a high priority, the replacement of the play equipment at the Mt. Vernon Tot Lot. This equipment was installed in 1997. The project will include installation of poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than the existing wood fiber used in the playgrounds. Westhaven Park Restrooms Update 80,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The restrooms at Westhaven Park are in very poor condition, as noted in the updated Comprehensive Outdorr Recreation Plan, as well as the citizen surveys for the Plan update. The project will include updating the entire restroom building to be ADA-compliant, including new plumbing, lighting, fixtures, Congress Avenue Tot Lot Play Equipment, Surfacing, and Accessible Route and Perimeter Walk 2018 - 23 updating the entire restroom building to be ADA-compliant, including new plumbing, lighting, fixtures, ceiling, walls, partitions, etc. Menominee Park Trail Improvements 50,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan Asphalt trails throughout the park will be reconstructed in some of the worst sections, as well as potential new trail connections. Soil Storage Shed 50,000$ Document/Study/Planning Document: N/A Construct a dry storage shed structure for topsoil on the Parks Department property. Stevens Park Lighting 25,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The lights in Stevens Park are some of the oldest in the park system. The replacement of site lights at Stevens Park is ranked as a high priority in the CORP. 2018 - 23 Park Improvements Project Descriptions Congress Avenue Tot Lot Fencing Replacement 20,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The Comprehensive Outdoor Recreation Plan for the City recommends, as a high priority, replacement of fencing around the Congress Avenue Tot Lot. Rainbow Park Accessible Route and Perimeter Walk 18,500$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The Comprehensive Outdoor Recreation Plan for the City recommends, as a high priority, an ADA-accessible route to the play structure, as well as an accessible perimeter walk around the play structure. Total 2018 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1,720,300$ 2018 - 24 2018 - 24 Public Property Improvements - Non-Utility Project Descriptions Community Development: Great Neighborhoods Initiative 250,000$ Document/Study/Planning Document: Healthy Neighborhood Initiative/Strategic Plan/ Comprehensive Plan Construct neighborhood improvements that support the Healthy Neighborhood Initiative in concert with Neighborhood Associations and neighborhood improvement partners. Projects are located in the right-of-way or on public property, and include streetscape improvements and signage, pedestrian and bicycle safety improvements, park improvements, safe routes to school improvements, and others identified and approved by the City Council. Downtown Blight Removal - High Street Parking Lot 250,000$ Document/Study/Planning Document: Business Improvement District Request Construction of parking lot in the place of a demolished and remediated site on High Avenue near the Grand Opera House. Blight Removal for Neighborhood Redevelopment 200,000$ Document/Study/Planning Document: Strategic Plan/Comprehensive Plan Acquisition, demolition, and remediation of various sites with WDNR permitting/site closure, if required. Riverwalk Signage 50,000$ Document/Study/Planning Document: Riverwalk Corridor Design Guidelines Purchase and installation of riverwalk signage and banners, way-finding signage, kiosks, and park regulations. Fire Department: Fire Training Facility - Burn Structure 320,000$ Document/Study/Planning Document: N/A The fire department training facility will include a structure and surrounding property for carrying out simulated fire and rescue scenarios. This would include a structure that would allow live fire training, as well as rescue, ladder training evolutions, etc. The surrounding area would also include training props for natural gas fires, car fires, and confined space and trench rescue. We have proposed several locations including property adjacent to the airport, Fernau Avenue by the north water tower, or West Fernau Avenue by the City's DPW storage site. The burn structure would be constructed in 2019 and a storage building and restroom would be constructed in the future. 2018 - 25 Public Property Improvements - Non-Utility Project Descriptions General Services: Roofing/HVAC Improvements 500,000$ Document/Study/Planning Document: Roofing and HVAC Study Ongoing program to address improvements for roofing and HVAC projects, based on McKinstry/Summit Designs HVAC Inventory Assessment and Specialty Engineering Group Roofing Inventory Assessment. Projects are prioritized annually based on condition. Safety Building Locker Room Renovations 200,000$ Document/Study/Planning Document: N/A The lower level locker rooms of the Safety Building are original to the building and have suffered much wear and tear in the last 25+ years. The locker rooms are in need of larger lockers, various plumbing and shower fixture upgrades, and new flooring. Safety Building Elevator 1 Modernization 80,000$ Document/Study/Planning Document: 2014 Performance Elevator Consulting Assessment Based on the elevator assessment completed by Performance Elevator Consulting in 2014, the Safety Building Elevator 1 serving the Police Department is +30 years old and is at, or near, the end of its normal service life. The report recommends a full modernization of the elevator. Oshkosh Convention Center Ceape Island Concrete Reconstruction 75,000$ Document/Study/Planning Document: N/A The Ceape Street Island on the north side of the Oshkosh Convention Center is in need of various road and sidewalk repairs and/or replacement. Many sections of the street are probably 20+ years old and have suffered large cracks, uneven areas, or settling. City Hall Window Replacement Program 50,000$ Document/Study/Planning Document: 2009 McKinstry Energy Efficiency Assessment Throughout City Hall, there is a mix of circa-1963, double-hung windows and circa-1980 aluminum frame windows. In both styles, many of the windows are either inoperable, have leaking seals causing fog/ condensation issues, or are misaligned/deficient and do not allow for proper weatherization/ waterproofing. It is our recommendation that we begin a phase-in of window replacement by floors and move towards higher-efficiency, weatherproof windows. 2018 - 26 Public Property Improvements - Non-Utility Project Descriptions Safety Building Exterior Signage 25,000$ Document/Study/Planning Document: N/A There are two large signs for the Police Department located on the Safety Building grounds (one at the Jackson Street/Algoma Boulevard intersection and one at the Jackson Street/Church Avenue intersection). Both signs are original to the building and have experienced sinking foundations for several years. Staff are recommending taller signs with exterior lighting to make them more visible to the public. Museum: 645,000$ Document/Study/Planning Document: Previous and various museum reviews and assessments, 1994 through 2011; Strategic and Site Master Plans This project involves conceptual planning, design, and construction of an expanded entrance in the 1982 Steiger Wing. The area would be rebuilt to include a larger lobby, visitor restrooms, other amenities, and other changes designed to enhance and improve the visitor experience. This work is a critical part of ensuring the Museum continues to meet public needs. The project resolves building problems, such as the leaking roof, leaking windows and energy loss, and access to the handicap lift. The redesign may also involve the archives and the library, which are located below the entrance and have their own problems. This project should be done concurrently with the reconstruction of the public parking lot and making the current (basement) visitor restrooms ADA compliant. Implement Site Plan Phase II - Event Garden 360,000$ Document/Study/Planning Document: N/A CIP Project Score: 65/200 Implementation of the site master plan. This project will be done in five (5) phases (2015-2021), to be coordinated with work on the entrance and parking lots. Phase I, Entry Walk, will be constructed in 2015. Phase II (2018) is the "Event Garden" on the north lawn and moving The Hiker monument. Phase III (2019) is the "Pergola and Fountain," which is a continuation of the Event Garden. Phase IV (2020) is the most costly, which is the "Arrival Garden" and the Museum's two parking lots. This work should be coordinated with revisions to the Steiger Wing entrance. The final phase (2021) is the "Pavillion Garden" in the far northwest corner. Floor and Wall Coverings 75,000$ Document/Study/Planning Document: N/A Replace floor and wall coverings in the Steiger Wing basement corridors and two stairwells. These were installed in 1995 and are showing their age. This work should be done after the completion of the remodeling project of the restrooms and main entrance in 2018. Steiger Wing Entrance Renovation 2018 - 27 Public Property Improvements - Non-Utility Project Descriptions Memories & Dreams Exhibit Gallery 25,000$ Document/Study/Planning Document: Strategic Plan; and various assessments, planning studies, This project is the next generation Memories & Dreams exhibition gallery. The current exhibit opened in 1997. An exhibit firm will be used to plan and fabricate a new exhibit for this second floor, 2,200 square foot gallery. The work will be done in three phases: Conceptual Design (2018); Design Development (2019); and Fabrication and Installation (2020). The exhibit plan for this gallery will be based on the input received from the 2013 strategic planning process and incorporate current best practices of the profession. A full gallery replacement of this magnitude is typically a three or four year project. Parks: Parks Department Building Renovation - Phase I 250,500$ Document/Study/Planning Document: N/A The existing Parks Department building at 805 Witzel Avenue is proposed for renovation/ expansion to accommodate current operations, as well as future operations. The first phase will include design services and property acquisition. A renovated/expanded facility is necessary to support current and future operations. It will also complement recent commercial development in the neighborhood, as well as the new Central Garage. Efficiency and customer service will be improved. Seniors Center North - Phase 2 750,000$ Document/Study/Planning Document: Oshkosh Senior Donations/Building Fund: 250,000$ Center Vision 2020 Phase 1 of this renovation will be specifically determined by Dimension IV, the architectural consultant; their analysis was completed in 2014. It is likely to include HVAC, a new roof, walls and insulation for the steel shed portion of the north building. Additional aspects of Phase 1 could include: relocation of the Adult Day Services into the north building, the creation of a full-service kitchen, or the relocation and expansion of the Fitness Center. The project will include the entire footprint of the Seniors Center North building, 234 North Campbell Road. Senior Services have been in this building since 2001. The building itself originated as "Badger Lumber" in the early 1900's and the Pole Storage Shed was added on as part of the "Do It Center" in approximately 1985. Lakeshore Municipal Golf Course - No. 5 Green Complex 80,000$ Document/Study/Planning Document: N/A Reconstruction of the No. 5 green and surrounding area, including drainage tee expansion and cart paths leading to and away from the area. and reports. 2018 - 28 Public Property Improvements - Non-Utility Project Descriptions Lakeshore Municipal Golf Course - Rain Shelters 60,000$ Document/Study/Planning Document: N/A Construct three (3) rain/sun shelters for players and staff use. They will be located at the No. 2 and 8 tee complex; at the No. 12 tee, No. 14 green, and No. 15 tee complex; and at the No. 2 green, No. 3 green, No. 6 green, and No. 7 tee complex. Public Works: Landfill Gas Remediation 800,000$ Document/Study/Planning Document: N/A Complete investigation of methane generation at 2 former quarries filled with refuse from City, south of 17th Avenue, between Knapp Street and Sanders Street. Transportation: Parking Lot Improvements 700,000$ Document/Study/Planning Document: 2015 Parking Lot Assessment This allocates funding toward future reconstruction of municipal parking lots. LED Streetlighting Upgrades 25,000$ Document/Study/Planning Document: N/A This project would replace high-pressure sodium lights at various locations with LED lighting. HPS lights have a 3-5 year life and are not typically replaced with a CIP. LED lamps, conversely are expected to last 10-20 years and therefore qualify as a capital improvement. Purchase Streetlighting Poles 25,000$ Document/Study/Planning Document: N/A The City owns over 1,000 streetlighting poles. While these poles are expected to have a long, serviceable life, we do lose poles through damage from car accidents (about half of which are hit and run/ unrecoverable). In addition, we are trying to expand the number of City-owned poles. This project would help to increase our inventory for both replacement of varying types of lighting poles we have and to allow for future expansion. Replace Bus Shelters 12,000$ Document/Study/Planning Document: 2011 Transit Development Plan Federal Grant:9,600$ This project would result in replacement of several older bus shelters. 2018 - 29 Public Property Improvements - Non-Utility Project Descriptions Pedestrian Accessibility Improvements 10,000$ Document/Study/Planning Document: 2011 Transit Development Plan This project will pay for paving and curbing improvements to bring high-usage transit stops into compliance with the Americans with Disabilities Act. Locations will be prioritized based on the level of current ridership, and the cost of making the improvement. Total 2018 Public Property Improvements - Non-Utility . . . . . . . . . .5,817,500$ 2018 - 30 Public Property Improvements - Utility Project Descriptions Clearwell Replacement (Water Filtration)3,517,000$ Document/Study/Planning Document: Wisconsin Department of Natural Resources 2007 Sanitary Survey; 2014 CH2M Hill Study The Water Filtration Plant clearwells store treated water prior to pumping into the water distribution system. The north and middle clearwells were installed in 1916 and the south clearwell was installed in the 1950's. These structures have exceeded their useful life and no longer meet WDNR Code requirements for in-ground water storage structuresand need to be replaced. Dual Media Filter #2 Concrete Repairs (Water Filtration)170,000$ Document/Study/Planning Document: N/A The dual media filters were constructed in 1998 and put into service in 1999. The filters need to be inspected and repairs made to concrete and control joints. Replace 12" Water Main at Plant (Water Filtration)154,000$ Document/Study/Planning Document: N/A The 12" water main is old and is a backup to the water distribution system. Phosphorus Regulatory Compliance Project - Design (Wastewater)1,500,000$ Document/Study/Planning Document: WPDES Permit Requirements This is a multi-year project to implement compliance with regulatory requirements for phosphorus treatment. Chlorine Contact Chamber Concrete Repairs (Wastewater)300,000$ Document/Study/Planning Document: N/A To refurbish our current chlorine contact chambers, which are concrete and have been in service since 1973 Stairs and Storage Closet Floor Covering Replacement (Wastewater)15,000$ Document/Study/Planning Document: N/A Replace flooring in janitor's closets and staircases in administration building. The existing floor is beginning to lift in places and is showing wear and causing safety concerns. Total 2018 Public Property Improvements - Utility . . . . . . . . . . . . . . . .5,656,000$ Total Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3,841,000$ Total Wastewater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1,815,000$ Total Storm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .-$ 2018 - 31 Major Equipment Amount 85,000$ 50,000$ 18,000$ 18,000$ 275,000$ 2,266,000$ 2,500,000$ 2,200,000$ 25,000$ 18,000$ 7,455,000$ Replace Computers and Related Equipment Wastewater Total 2018 Major Equipment Computer Server Room Air Conditioning Unit Library Electronic Fareboxes (Transit)Transportation Air Compressor (replaces #217, 1994 Sullair)Street Replace Motor Control Centers 1-11 Prairie Court Lift Station Control Panel and Equipment Upgrade Wastewater Replace Plant Emergency Generator and Switchgear Water Filtration Wastewater Major Equipment Department Anaerobic Digester Mixing Upgrade Wastewater Production Control Equipment Replacement General Services Grand Opera House Emergency Generator Replacement General Services 2018 - 32 Major Equipment - Vehicles Amount 250,000$ 40,000$ 32,000$ 55,000$ 45,000$ 40,000$ 275,000$ 275,000$ 130,000$ 205,000$ 275,000$ 65,000$ 45,000$ 40,000$ 45,000$ 40,000$ 95,000$ 1,500,000$ 109,000$ Water Distribution 90,000$ 82,000$ 45,000$ 3,778,000$ Pickup Truck (replaces #973, 2005)Wastewater Major Equipment - Vehicles Department Roller (replaces #167, 1993 Bomag)Street Leaf Vac with Front Mount (replaces #243, 2001)Street 1/2-Ton Extended Cab CNG Pickup Truck (replaces #35, 2006 GMC)Street 3/4-Ton Extended Cab Pickup Truck (replaces #31, 2005 GMC)Street Step Van (replaces #425, 2002 Ford Ranger)Parks Aerial Lift Truck (replaces #478, 1992 F700) (Forestry)Parks Transportation Pickup Truck (replaces #474, 2003 Chevrolet 2500) (Forestry)Parks Sweeper (replaces #150, 2007 Elgin)Storm Water Utility Zero-Turn Trim Mower (replaces 2006) (Golf Course)Parks Street Tandem Dump Truck with Stainless Steel Box, with Slide-In V-Box and Pre- Wet, Plow and Wing (replaces #63, 2007 Sterling)Street Tractor (Mower/Plow/Blower/Broom) Replacements Parks Pickup Truck (replaces #417, 2007 Ford Workhorse)Parks Total 2018 Major Equipment - Vehicles 2 - 3/4-Ton CNG Full-Size Vans (replaces #823 & #831, 2008 Vans)Water Distribution Used Semi-Tractor (replaces #93, 2002 Sterling)Street Dual-Steer, Tandem Dump Truck with Stainless Steel Box, with Slide-In V- Box and Pre-Wet, Plow and Wing (replaces #62, 2004 IH)Street 5-Ton 4-Wheel Drive Dump Truck with Tool Box (replaces #20, 2004 Isuzu)Street Area Truck with Wing and Plow (replaces #43, 2008 IHC) Street Backhoe/Front End Loader (replaces #815, 2008)Water Distribution 1-Ton Service Truck with Valve Turning Machine (replaces #828, 2008) Water Pump (replaces #234, 1968 Hercules) 3 - 35' Diesel Buses (replaces 2003) (Transit) 2018 - 33 Tax Increment Financing (TIF) Districts Improvements Project Descriptions Jeld Wen Zone Riverwalk - Central, Year 2 of 2 Construction 3,040,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan State Grant:500,000$ TIF: TID #21 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. Jeld Wen Zone Riverwalk - West of Oregon, Year 2 of 2 Construction 1,852,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan State Grant:500,000$ TIF: TID #21 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. South Shore East - Riverwalk (Pioneer Drive), Year 2 of 2 Construction 1,630,000$ Document/Study/Planning Document:Fox River Corridor-Riverwalk Plan State Grant:500,000$ TIF: TID #20 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, boat docks, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. 2018 - 34 South Shore Redevelopment Sites and Pioneer Island and Marina Design 1,000,000$ Document/Study/Planning Document: South Shore Redevelopment Plan/TIF #20 TIF: TID #20 State Grant:500,000$ Land acquisition, demolition, and remediation of multiple sites in the South Shore Redevelopment Area is required for the implementation of the riverwalk plan and the redevelopment of the South Shore. Project also includes design services needed to build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches and signage. Marion Road Redevelopment Area Remediation 240,000$ Document/Study/Planning Document:Marion Road Redevelopment Plan TIF: TID #21 In order to implement the redevelopment and revitalization of the Marion Road Redevelopment Area, environmental contamination at three sites within this area needs to be remediated. Total 2018 TIF Districts Improvements . . . . . . . . . . . . . . . . . . . . . . . . .7,762,000$ 2018 - 34 2019 CIP Comprehensive Streets/Utility Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Public Infrastructure Improvements - Other Streets . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Public Infrastructure Improvements - Storm Water Utility. . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Public Infrastructure Improvements - Wastewater Utility . . . . . . . . . . . . . . . . . . . . . . . .12 Public Infrastructure Improvements - Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 Public Property Improvements - Non-Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18 Public Property Improvements - Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21 Major Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Major Equipment - Vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23 Tax Increment Financing (TIF) Districts Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24 2019 - 1 Comprehensive Streets/Utility Improvements Project Descriptions Oregon Street Reconstruction 7,525,000$ Document/Study/Planning Document: N/A PASER Rating: 3, 5 Full reconstruction of the street, including public utilities and laterals,from West 21st Avenue to West 28th Avenue. Proposed 44'-48' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1948 Water - Pre-1920's Storm - 1956, 1960, and 1976 CIP Section Assessment Other City Total Street 703,300$1,012,000$1,715,300$ Storm 42,800$661,300$704,100$ Wastewater 67,400$3,749,800$3,817,200$ Water 25,000$1,018,500$1,043,500$ Sidewalk 58,000$86,900$144,900$ Traffic -$100,000$100,000$ Total 896,500$-$6,628,500$7,525,000$ 2019 - 2 Hazel Street Reconstruction 3,485,300$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle PASER Rating: 3 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Washington Avenue to East Irving Avenue . Proposed 26'-42' concrete pavement in 50'-80' right-of-way. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and/or shareway facility. Age of Infrastructure: Sanitary - 1884 and 1901 Water - Pre-1920's Storm - 1892, 1958, and 1978 CIP Section Assessment Other City Total Street 231,800$-$902,300$1,134,100$ Storm 30,000$-$401,000$431,000$ Wastewater 77,200$-$534,300$611,500$ Water 5,600$-$1,187,000$1,192,600$ Sidewalk 46,400$-$69,700$116,100$ Total 391,000$-$3,094,300$3,485,300$ 2019 - 2 Comprehensive Streets/Utility Improvements Project Descriptions Court Street Reconstruction 2,022,400$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle PASER Rating: 4 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from Ceape Avenue to Washington Avenue. Proposed 36'-50' concrete pavement in 80' right-of-way. Sidewalk sections will be repaired, as needed.Project includes storm sewer from the Fox River to Ceape Avenue. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and/or shareway facility. Age of Infrastructure: Sanitary - 1886 Water - Pre-1920's Storm - 1959 CIP Section Assessment Other City Total Street 92,700$-$445,500$538,200$ Storm 20,300$-$585,800$606,100$ Wastewater 23,900$-$319,300$343,200$ Water 18,500$-$462,400$480,900$ Sidewalk 21,600$-$32,400$54,000$ Total 177,000$-$1,845,400$2,022,400$ 2019 - 3 Otter Avenue Reconstruction 1,402,700$ Document/Study/Planning Document: N/A PASER Rating: 3 Full reconstruction of the street, including public utilities and laterals, from State Street to the railroad tracks. Proposed 36'-44' concrete pavement in 64' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1886 and 1959 Water - Pre-1920's Storm - 1977 and 1978 CIP Section Assessment Other City Total Street 154,200$-$365,000$519,200$ Storm 18,800$-$192,300$211,100$ Wastewater 11,900$-$220,300$232,200$ Water 15,000$-$374,400$389,400$ Sidewalk 20,300$-$30,500$50,800$ Total 220,200$-$1,182,500$1,402,700$ 2019 - 3 Comprehensive Streets/Utility Improvements Project Descriptions Washington Avenue Reconstruction 3,550,700$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle PASER Rating: 3, 4, 5 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from North Main Street to Broad Street. Proposed 32'-48' concrete pavement in 60'-67.5' right-of-way. Sidewalk sections will be repaired, as needed.Water main will be installed from water treatment plant to Hazel Street. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign andstripe facility. Age of Infrastructure: Sanitary - 1884 and 1902 Water - Pre-1920's Storm - 1959, 1969, and 1978 CIP Section Assessment Other City Total Street 140,100$-$461,900$602,000$ Storm 31,500$-$379,500$411,000$ Wastewater 46,600$-$423,800$470,400$ Water 24,000$-$1,671,300$1,695,300$ Sidewalk 28,800$-$43,200$72,000$ Traffic -$-$300,000$300,000$ Total 271,000$-$3,279,700$3,550,700$ 2019 - 4 Ripon Lane Reconstruction 809,900$ Document/Study/Planning Document: N/A PASER Rating: 5 Installation of public utilities and laterals,from West South Park Avenue to the west end of Ripon Lane. Proposed 22' asphalt pavement without curb and gutter in 60' right-of-way. This area was attached to the City from the Town of Algoma in 2013. The area currently does not have sanitary sewer, water main, or storm sewer. This area has storm water drainage issues. Age of Infrastructure: Sanitary - None Water - None Storm - None CIP Section Assessment Other City Total Street 86,800$-$130,600$217,400$ Storm 4,500$-$109,500$114,000$ Wastewater 81,200$-$121,800$203,000$ Water 50,900$-$224,600$275,500$ Sidewalk -$-$-$-$ Total 223,400$-$586,500$809,900$ 2019 - 4 Comprehensive Streets/Utility Improvements Section Summary CIP Section Assessment Other City Total Street 1,408,900$-$3,317,300$4,726,200$ Storm 147,900$-$2,329,400$2,477,300$ Wastewater 308,200$-$5,369,300$5,677,500$ Water 139,000$-$4,938,200$5,077,200$ Sidewalk 175,100$-$262,700$437,800$ Traffic -$-$400,000$400,000$ Total 2,179,100$-$16,616,900$18,796,000$ 2019 - 5 2019 - 5 Public Infrastructure Improvements - Other Streets Project Descriptions Asphalt Mill and Overlay Program (Annual)885,000$ Document/Study/Planning Document: N/A PASER Rating: Varies Project restores the asphalt surface of existing streets to a very good condition. Work can include curb and gutter repair; stone base course; and spot repairs to sanitary sewer, storm sewer, and water main systems. CIP Section Assessment Other City Total Street 287,500$-$287,500$575,000$ Storm -$-$235,000$235,000$ Wastewater -$-$50,000$50,000$ Water -$-$25,000$25,000$ Sidewalk -$-$-$-$ Total 287,500$-$597,500$885,000$ Concrete Pavement Repairs (Annual)225,000$ Document/Study/Planning Document: N/A PASER Rating: Varies Spot repairs to deteriorated panels of concrete pavement will be made on various arterial, collector, and local streets. Some work will be done in coordination with sanitary manhole rehabilitation project. CIP Section Assessment Other City Total Street -$-$180,000$180,000$ 2019 - 6 Street -$-$180,000$180,000$ Storm -$-$15,000$15,000$ Wastewater -$-$15,000$15,000$ Water -$-$15,000$15,000$ Sidewalk -$-$-$-$ Total -$-$225,000$225,000$ 396,900$ Document/Study/Planning Document: N/A PASER Rating: N/A Up-front engineering services to help in the design of 2020 CIP projects. CIP Section Assessment Other City Total Street -$-$14,400$14,400$ Storm -$-$185,000$185,000$ Wastewater -$-$185,000$185,000$ Water -$-$12,500$12,500$ Sidewalk -$-$-$-$ Total -$-$396,900$396,900$ Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2020 Construction Projects 2019 - 6 Public Infrastructure Improvements - Other Streets Section Summary CIP Section Assessment Other City Total Street 287,500$-$481,900$769,400$ Storm -$-$435,000$435,000$ Wastewater -$-$250,000$250,000$ Water -$-$52,500$52,500$ Sidewalk -$-$-$-$ Total 287,500$-$1,219,400$1,506,900$ 2019 - 7 2019 - 7 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Fernau Avenue Watershed Construction 2,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Construction of first identified flood reduction alternative. The Fernau Avenue watershed generally encompasses an area from the Canadian National railroad spur in the north and the Northwest Industrial Park north of Snell Road, and from Progress Drive east to Lake Winnebago. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,500,000$2,500,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$2,500,000$2,500,000$ Campbell Creek Watershed Land Acquisition 2,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,500,000$2,500,000$ Wastewater -$-$-$-$ Water -$-$-$-$ 2019 - 8 Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$2,500,000$2,500,000$ Gallups/Merritts Creek Watershed Construction 2,000,000$ Document/Study/Planning Document: N/A PASER Rating: N/A The watershed generally encompasses an area starting southwest of the City of Oshkosh, near S.T.H. 26 and C.T.H. N and northeasterly towards West 28th Avenue and South Main Street. Major landmarks within the watershed include the Ford Festival Grounds and Airport Industrial Park (between West 35th Avenue and West 29th Avenue). CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,000,000$2,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$2,000,000$2,000,000$ 2019 - 8 Public Infrastructure Improvements - Storm Water Utility Project Descriptions West Murdock Avenue Watershed Land Acquisition 1,000,000$ Document/Study/Planning Document: N/A PASER Rating: N/A The West Murdock Avenue watershed is roughly bounded by Liberty Street on the east, New York Avenue on the south, Linwood Avenue on the north, and Algoma Boulevard and the Fox River on the west. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$1,000,000$1,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,000,000$1,000,000$ Sawyer Creek Watershed Design 200,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Prepare design for construction of additional strategies. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$200,000$200,000$ Wastewater -$-$-$-$ 2019 - 9 Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$200,000$200,000$ Johnson Creek Watershed Design 200,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Design of first identified flood reduction alternative. The Johnson Creek Watershed generally encompasses an area of approximately one-half mile wide, from the intersection of Knapp Street and C.T.H. N northeasterly to Lake Winnebago. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$200,000$200,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$200,000$200,000$ 2019 - 9 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Mini Storm Sewers/Storm Laterals 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Provide mini storm sewers and laterals to property owners that have requested them. The laterals allow property owners to connect to the storm sewer system without discharging water over the sidewalk. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$285,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$285,000$300,000$ 2019 - 10 2019 - 10 Public Infrastructure Improvements - Storm Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$8,685,000$8,700,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$8,685,000$8,700,000$ 2019 - 11 2019 - 11 Public Infrastructure Improvements - Wastewater Utility Project Descriptions 1,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Work includes identification and elimination of clear water entering the sanitary sewer system and implementation of CMOM/SECAP recommendations. Work can include manhole inspections and repairs, flow monitoring, and/or sewer lining or replacement. Sanitary sewer lining and grouting of laterals and mainline will be performed in areas that have newer concrete streets with aging sanitary sewer infrastructure. Televising inspections will be used to determine the areas of work. This helps to remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a significant problem. The sanitary sewer system is not designed to handle these flows. The result of the excess flow is sanitary sewer backups into residents' homes. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$1,500,000$1,500,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,500,000$1,500,000$ Abandon Sawyer Creek Siphon 150,000$ Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 2019 - 12 Abandon Sawyer Creek Siphon 150,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Abandon inverted siphon river crossing once new lift station is installed. Sewer is currently in an easement between Oshkosh Avenue and a public alley. With the elimination of the inverted siphon, we are eliminating a maintenance issue for the Streets Division and improving the sanitary sewer system. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$150,000$150,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$150,000$150,000$ 2019 - 12 Public Infrastructure Improvements - Wastewater Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$1,650,000$1,650,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,650,000$1,650,000$ 2019 - 13 2019 - 13 Public Infrastructure Improvements - Sidewalks Project Descriptions Sidewalk Rehabilitation and Reconstruction Program 750,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Program rotates through the City on a 10-year cycle to repair defective sidewalk squares. Program also includes citizen complaint locations. Handicap ramps are installed at intersections currently without ramps. Program will also fix deteriorated driveway aprons. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 550,000$-$200,000$750,000$ Total 550,000$-$200,000$750,000$ Sidewalks: New Walk Ordered In 65,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Install new sidewalk along street segments without sidewalk. Selection to be coordinated through Pedestrian/Bicycle committee. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ 2019 - 14 Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 60,000$-$5,000$65,000$ Total 60,000$-$5,000$65,000$ Sidewalks: Subdivision Agreements 55,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Install sidewalks at various locations within newer subdivisions. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 50,000$-$5,000$55,000$ Total 50,000$-$5,000$55,000$ 2019 - 14 Public Infrastructure Improvements - Sidewalks Section Summary CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 660,000$-$210,000$870,000$ Total 660,000$-$210,000$870,000$ 2019 - 15 2019 - 15 Traffic Improvements Project Descriptions Bicycle and Pedestrian Infrastructure 50,000$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle Circulation Plan Provide designated funds for bicycle and pedestrian infrastructure improvements. Primary improvements will be bicycle lane striping and symbols and bike facility signage for existing and future routes. Traffic Signal Equipment 45,000$ Document/Study/Planning Document: N/A This item pays for traffic signal equipment to be installed at various intersections as needed, in order to repair knockdowns and/or replace obsolete equipment. Typical purchases include poles, cabinets, controllers, and vehicle detection equipment. LED Replacement 10,000$ Document/Study/Planning Document: N/A This item will involve replacement of LED signal heads at City-maintained traffic signals. Total 2019 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .105,000$ 2019 - 16 Total 2019 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .105,000$ 2019 - 16 Park Improvements Project Descriptions Menominee Park Improvements - Reetz Complex and Parking Lot 2,600,000$ Document/Study/Planning Document: Menominee Park Master Plan Reconstruct Reetz north and south fields and entire complex. Construct new parking lot to serve athletic fields, as well as boat launch. Rainbow Park Launch Improvements - South Phase Construction 1,650,000$ Document/Study/Planning Document: Rainbow Park Master Boat Launch Fees: 200,000$ Plan & CORP Construction of parking lot and boat launch improvements per 2013 Park Master Plan. The existing traffic flow near and around the boat launch is congested and there are traffic flow conflicts while boats are launching. Rainbow Park Restrooms/Shelter/Storage Building 400,000$ Document/Study/Planning Document:Rainbow Park Master Plan Construct a new restroom/shelter/storage building in Rainbow Park as a result of elimination of the shelter near the boat launch, as recommended in the Rainbow Park Master Plan. 44th Parallel Park Play Equipment and Accessible Route and Perimeter Walk 120,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The Comprehensive Outdoor Recreation Plan for the City recommends, as a high priority, an ADA-accessible route to the play structure, as well as an accessible perimeter walk around the play structure. The play equipment is due for replacement. It was installed in 2003. The project will include installation of new play equipment; and poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than wood fiber. Westhaven Park Play Equipment and Surfacing 100,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The CORP for the City recommends the replacement of the equipment at Westhaven Park. The equipment was installed in 2001. The project will include installation of poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than the existing wood fiber used in the playgrounds. Total 2019 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4,870,000$ 2019 - 17 Public Property Improvements - Non-Utility Project Descriptions Community Development: Great Neighborhoods Initiative 250,000$ Document/Study/Planning Document: Healthy Neighborhood Initiative/Strategic Plan/ Comprehensive Plan Construct neighborhood improvements that support the Healthy Neighborhood Initiative in concert with Neighborhood Associations and neighborhood improvement partners. Projects are located in the right-of-way or on public property, and include streetscape improvements and signage, pedestrian and bicycle safety improvements, park improvements, safe routes to school improvements, and others identified and approved by the City Council. Blight Removal for Neighborhood Redevelopment 200,000$ Document/Study/Planning Document: Strategic Plan/Comprehensive Plan Acquisition, demolition, and remediation of various sites with WDNR permitting/site closure, if required. Riverwalk Signage 50,000$ Document/Study/Planning Document: Riverwalk Corridor Design Guidelines Purchase and installation of riverwalk signage and banners, way-finding signage, kiosks, and park regulations. 2019 - 18 General Services: Roofing/HVAC Improvements 500,000$ Document/Study/Planning Document: Roofing and HVAC Study Ongoing program to address improvements for roofing and HVAC projects, based on McKinstry/Summit Designs HVAC Inventory Assessment and Specialty Engineering Group Roofing Inventory Assessment. Projects are prioritized annually based on condition. City Hall Window Replacement Program 50,000$ Document/Study/Planning Document: 2009 McKinstry Energy Efficiency Assessment Throughout City Hall, there is a mix of circa-1963, double-hung windows and circa-1980 aluminum frame windows. In both styles, many of the windows are either inoperable, have leaking seals causing fog/ condensation issues, or are misaligned/deficient and do not allow for proper weatherization/ waterproofing. It is our recommendation that we begin a phase-in of window replacement by floors and move towards higher-efficiency, weatherproof windows. 2019 - 18 Public Property Improvements - Non-Utility Project Descriptions Museum: Implement Site Plan Phase II - Event Garden 175,000$ Document/Study/Planning Document: N/A Implementation of the site master plan. This project will be done in five (5) phases (2015-2021), to be coordinated with work on the entrance and parking lots. Phase I, Entry Walk, will be constructed in 2015. Phase II (2018) is the "Event Garden" on the north lawn and moving The Hiker monument. Phase III (2019) is the "Pergola and Fountain," which is a continuation of the Event Garden. Phase IV (2020) is the most costly, which is the "Arrival Garden" and the Museum's two parking lots. This work should be coordinated with revisions to the Steiger Wing entrance. The final phase (2021) is the "Pavillion Garden" in the far northwest corner. Memories & Dreams Exhibit Gallery 150,000$ Document/Study/Planning Document: Strategic Plan; and various assessments, planning studies, This project is the next generation Memories & Dreams exhibition gallery. The current exhibit opened in 1997. An exhibit firm will be used to plan and fabricate a new exhibit for this second floor, 2,200 square foot gallery. The work will be done in three phases: Conceptual Design (2018); Design Development (2019); and Fabrication and Installation (2020). The exhibit plan for this gallery will be based on the input received from the 2013 strategic planning process and incorporate current best practices of the profession. A full gallery replacement of this magnitude is typically a three or four year project. and reports. 2019 - 19 Parks: Parks Department Building Renovation - Phase 2 2,000,000$ Document/Study/Planning Document: N/A The existing Parks Department building at 805 Witzel Avenue is proposed for renovation/ expansion to accommodate current operations, as well as future operations. The second phase will include construction. A renovated/expanded facility is necessary to support current and future operations. It will also complement recent commercial development in the neighborhood, as well as the new Central Garage. Efficiency and customer service will be improved. Lakeshore Municipal Golf Course - No. 14 Green Complex Relocation 100,000$ Document/Study/Planning Document: N/A Relocation of No. 14 green and surroundings, incorporating all the material from the existing No. 14 green and the current nursery green. The project will also include necessary drainage improvements in the area, including green side and fairway bunkers. 2019 - 19 Public Property Improvements - Non-Utility Project Descriptions Cemetery Roads Repaving 25,000$ Document/Study/Planning Document: N/A Re-pave deteriorating access roads in Riverside Cemetery. In 2009, 2013, and 2015, funds were allocated. The roads continue to be in very poor condition. Transportation: Parking Lot Improvements 700,000$ Document/Study/Planning Document: 2015 Parking Lot Assessment This allocates funding toward future reconstruction of municipal parking lots. Purchase Streetlighting Poles 25,000$ Document/Study/Planning Document: N/A The City owns over 1,000 streetlighting poles. While these poles are expected to have a long, serviceable life, we do lose poles through damage from car accidents (about half of which are hit and run/ unrecoverable). In addition, we are trying to expand the number of City-owned poles. This project would help to increase our inventory for both replacement of varying types of lighting poles we have and to allow for future expansion. LED Streetlighting Upgrades 25,000$ Document/Study/Planning Document: N/A 2019 - 20 Document/Study/Planning Document: N/A This project would replace high-pressure sodium lights at various locations with LED lighting. HPS lights have a 3-5 year life and are not typically replaced with a CIP. LED lamps, conversely are expected to last 10-20 years and therefore qualify as a capital improvement. Pedestrian Accessibility Improvements 10,000$ Document/Study/Planning Document: 2011 Transit Development Plan This project will pay for paving and curbing improvements to bring high-usage transit stops into compliance with the Americans with Disabilities Act. Locations will be prioritized based on the level of current ridership, and the cost of making the improvement. Total 2019 Public Property Improvements - Non-Utility . . . . . . . . . .4,260,000$ 2019 - 20 Public Property Improvements - Utility Project Descriptions Clearwell Replacement (Water Filtration)3,517,000$ Document/Study/Planning Document: Wisconsin Department of Natural Resources 2007 Sanitary Survey; 2014 CH2M Hill Study The Water Filtration Plant clearwells store treated water prior to pumping into the water distribution system. The north and middle clearwells were installed in 1916 and the south clearwell was installed in the 1950's. These structures have exceeded their useful life and no longer meet WDNR Code requirements for in-ground water storage structuresand need to be replaced. Re-Paint Fernau Water Tower and Add Mixing (Water Filtration)760,000$ Document/Study/Planning Document: N/A Fernau Water Tower needs to be repainted to protect surfaces and mixing needs to be added to improve water quality and disinfection. Dual Media Filter #3 Concrete Repairs (Water Filtration)170,000$ Document/Study/Planning Document: N/A The dual media filters were constructed in 1998 and put into service in 1999. The filters need to be inspected and repairs made to concrete and control joints. 26,400,000$ Document/Study/Planning Document: WPDES Permit Requirements This is a multi-year project to implement compliance with regulatory requirements for phosphorus treatment. 28th Avenue Lift Station Upgrade (Wastewater)20,000$ Document/Study/Planning Document: N/A This station has been in service since 1966, went through a partial upgrade in 2002, and is in need of further upgrades. Total 2019 Public Property Improvements - Utility . . . . . . . . . . . . . . . .30,867,000$ Total Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4,447,000$ Total Wastewater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26,420,000$ Total Storm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .-$ Phosphorus Regulatory Compliance Project - Bidding and Construction (Wastewater) 2019 - 21 Major Equipment Amount 18,000$ 35,000$ 30,000$ 83,000$Total 2019 Major Equipment Major Equipment Department Air Compressor (replaces #216, 1987 Davey)Street Portable Welder (replaces #236, 1973 Miller)Street Prairie Court Lift Station Control Panel and Equipment Upgrade Wastewater 2019 - 22 Major Equipment - Vehicles Amount 475,000$ 665,000$ 65,000$ 55,000$ 54,000$ 30,000$ 150,000$ 275,000$ 105,000$ 275,000$ 40,000$ 140,000$ 110,000$ 25,000$ 380,000$ 38,000$ 2,882,000$ Tandem Dump Truck with Stainless Steel Box, with Slide-In V-Box and Pre- Wet, Plow and Wing (replaces #67, 2007 Sterling)Street 3/4-Ton Extended Cab Pickup Truck (replaces #22, 2008 Ford)Street Major Equipment - Vehicles Department Rubber Tire Back Hoe (replaces #106, 2004 JD)Street Tandem Dump Truck with Stainless Steel Box, with Slide-In V-Box and Pre- Wet, Plow and Wing (replaces #54, 1990 Ford)Street Heavy Rescue Vehicle (replaces 1999)Fire Department 3 - Ambulances (replaces 2008)Fire Department Tractor (Mower/Plow/Blower/Broom) (replaces P04, 2001 John Deere 1435)Parks Tractor (replaces #174, 2001 Tiger)Street 2 - Pickup Trucks (replaces #407 and #491, 2005 Chevrolet Colorado and 2005 Ford F-250)Parks Stump Grinder (replaces #343, 1995 Vermeer) (Forestry)Parks Turf Truck with Lift (replaces 2002) (Golf Course)Parks Total 2019 Major Equipment - Vehicles 5-Ton Truck with Box and Crane (replaces #21, 2002 IHC)Street Tandem Trailer (replaces #233, 1992 Chilton)Street Water Tanker (replaces #239, 1979 Freuhuf)Street Jetter-Vac (replaces #55, 2009 International)Wastewater WastewaterFork Lift (replaces 1947) 2019 - 23 Tax Increment Financing (TIF) Districts Improvements Project Descriptions South Shore - Pioneer Island and Marina, Year 2 of 3 Construction 2,265,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan TIF: TID #20 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. South Shore Central Zone Riverwalk (Sweetwater/Dockside) - Design 278,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan TIF: TID #20 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. Total 2019 TIF Districts Improvements . . . . . . . . . . . . . . . . . . . . . . . . .2,543,000$ 2019 - 24 2019 - 24 2020 CIP Comprehensive Streets/Utility Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Public Infrastructure Improvements - Other Streets. . . . . . . . . . . . . . . . . . . . . . . . . . . .7 Public Infrastructure Improvements - Storm Water Utility. . . . . . . . . . . . . . . . . . . . . . . . .10 Public Infrastructure Improvements - Wastewater Utility . . . . . . . . . . . . . . . . . . . . . . . .13 Public Infrastructure Improvements - Sidewalks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15 Traffic Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18 Public Property Improvements - Non-Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19 Public Property Improvements - Utility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Major Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23 Major Equipment - Vehicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24 Tax Increment Financing (TIF) Districts Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . .25 2020 - 1 Comprehensive Streets/Utility Improvements Project Descriptions Snell Road Reconstruction 2,734,800$ Document/Study/Planning Document: N/A PASER Rating: 4 Full reconstruction of the street, including public utilities and laterals,from Jackson Street to Moser Street. Proposed 36' concrete pavement in 66' right-of-way. Sidewalk sections will be installed. Age of Infrastructure: Sanitary - 1974 Water - 1974 and 1980 Storm - None Present CIP Section Assessment Other City Total Street 430,200$-$636,400$1,066,600$ Storm 14,300$-$573,800$588,100$ Wastewater 24,100$395,100$419,200$ Water 1,700$-$539,900$541,600$ Sidewalk 47,700$-$71,600$119,300$ Total 518,000$-$2,216,800$2,734,800$ Bowen Street Reconstruction 2,116,400$ Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 5 2020 - 2 Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 5 Circulation Plan Full reconstruction of the street, including public utilities and laterals,from East Nevada Avenue to East Murdock Avenue. Proposed 42' concrete pavement in 60' right-of-way. Sidewalks will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and stripe facility. Age of Infrastructure: Sanitary - 1947 and 1968 Water - Pre-1920's and 1948 Storm - 1968 CIP Section Assessment Other City Total Street 152,800$-$463,900$616,700$ Storm 30,500$-$293,500$324,000$ Wastewater 47,000$-$468,900$515,900$ Water 3,000$-$494,900$497,900$ Sidewalk 24,800$-$37,100$61,900$ Traffic -$-$100,000$100,000$ Total 258,100$-$1,858,300$2,116,400$ 2020 - 2 Comprehensive Streets/Utility Improvements Project Descriptions Ceape Avenue Reconstruction 4,541,500$ Document/Study/Planning Document: N/A PASER Rating: 2, 3, 4 Full reconstruction of the street, including public utilities and laterals,from Bowen Street to Lake Winnebago. Proposed 32' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1936 and 1938 Water - Pre-1920's Storm - 1978 CIP Section Assessment Other City Total Street 368,100$-$610,000$978,100$ Storm 70,500$-$799,500$870,000$ Wastewater 181,200$-$1,007,800$1,189,000$ Water -$-$1,382,900$1,382,900$ Sidewalk 48,600$-$72,900$121,500$ Total 668,400$-$3,873,100$4,541,500$ Bay Shore Drive Reconstruction 1,569,400$ Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 2 2020 - 3 Document/Study/Planning Document:2011 Pedestrian and Bicycle PASER Rating: 2 Circulation Plan Full reconstruction of the street, including public utilities and laterals, from Broad Street to Mill Street . Proposed 32' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. 2011 Pedestrian and Bicycle Circulation Plan recommends bike sign and/or shareway facility. Age of Infrastructure: Sanitary - 1986 Water - Pre-1920's Storm - 1968 CIP Section Assessment Other City Total Street 184,500$-$232,400$416,900$ Storm 18,800$-$192,300$211,100$ Wastewater 45,200$-$336,900$382,100$ Water 5,400$-$501,700$507,100$ Sidewalk 20,900$-$31,300$52,200$ Total 274,800$-$1,294,600$1,569,400$ 2020 - 3 Comprehensive Streets/Utility Improvements Project Descriptions East Lincoln Avenue Reconstruction 2,086,400$ Document/Study/Planning Document: N/A PASER Rating: 3, 4 Full reconstruction of the street, including public utilities and laterals,from North Main Street to railroad tracks. Proposed 30'-32' concrete pavement in 50'-60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1889, 1907, and 1914 Water - Pre- 1920's Storm - None Present CIP Section Assessment Other City Total Street 225,500$-$315,800$541,300$ Storm 30,800$-$334,300$365,100$ Wastewater 81,800$-$433,500$515,300$ Water 3,000$-$593,700$596,700$ Sidewalk 27,200$-$40,800$68,000$ Total 368,300$-$1,718,100$2,086,400$ Cherry Street Reconstruction 801,500$ Document/Study/Planning Document: N/A PASER Rating: 2 2020 - 4 Document/Study/Planning Document: N/A PASER Rating: 2 Full reconstruction of the street, including public utilities and laterals,from West Lincoln Avenue to West Irving Avenue. Proposed 36' concrete pavement in 60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1886 Water - Pre-1920's Storm - 1968 CIP Section Assessment Other City Total Street 73,600$-$167,900$241,500$ Storm 18,000$-$122,000$140,000$ Wastewater 11,300$-$153,700$165,000$ Water -$-$228,000$228,000$ Sidewalk 10,800$-$16,200$27,000$ Total 113,700$-$687,800$801,500$ 2020 - 4 Comprehensive Streets/Utility Improvements Project Descriptions West Lincoln Avenue Reconstruction 2,517,300$ Document/Study/Planning Document: N/A PASER Rating: 3, 5 Full reconstruction of the street, including public utilities and laterals,from Elmwood Avenue to Jackson Street. Proposed 36' concrete pavement in 44'-60' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1896, 1911, and 1977 Water - 1963 Storm - 1968 CIP Section Assessment Other City Total Street 209,600$-$434,400$644,000$ Storm 30,900$-$620,100$651,000$ Wastewater 67,600$-$443,400$511,000$ Water -$-$639,300$639,300$ Sidewalk 28,800$-$43,200$72,000$ Total 336,900$-$2,180,400$2,517,300$ McKinley Street Reconstruction 846,100$ Document/Study/Planning Document: N/A PASER Rating: 2 2020 - 5 Document/Study/Planning Document: N/A PASER Rating: 2 Full reconstruction of the street, including public utilities and laterals, from West Lincoln Avenue to Scott Avenue. Proposed 19' concrete pavement in 30' right-of-way. Sidewalk sections will be repaired, as needed. Age of Infrastructure: Sanitary - 1886 Water - Pre-1920's Storm - 1968 CIP Section Assessment Other City Total Street 37,800$-$107,100$144,900$ Storm 10,500$-$155,500$166,000$ Wastewater 28,700$-$179,700$208,400$ Water -$-$295,300$295,300$ Sidewalk 12,600$-$18,900$31,500$ Total 89,600$-$756,500$846,100$ 2020 - 5 Comprehensive Streets/Utility Improvements Section Summary CIP Section Assessment Other City Total Street 1,682,100$-$2,967,900$4,650,000$ Storm 224,300$-$3,091,000$3,315,300$ Wastewater 486,900$-$3,419,000$3,905,900$ Water 13,100$-$4,675,700$4,688,800$ Sidewalk 221,400$-$332,000$553,400$ Traffic -$-$100,000$100,000$ Total 2,627,800$-$14,585,600$17,213,400$ 2020 - 6 2020 - 6 Public Infrastructure Improvements - Other Streets Project Descriptions West 9th Avenue Reconstruction 460,000$ Document/Study/Planning Document: N/A PASER Rating: 5, 6 This project includes the reconstruction of West 9th Avenue,from Knapp Street to Michigan Street. Project includes new public utilities and the undergrounding of electric cable, and telephone.This phase includes undergrounding of utilities. CIP Section Assessment Other City Total Street -$-$460,000$460,000$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$460,000$460,000$ Mockingbird Way Traffic Calming 87,800$ Document/Study/Planning Document: N/A PASER Rating: N/A 2020 - 7 Document/Study/Planning Document: N/A PASER Rating: N/A The intersection of Mockingbird Way and Sawyer Creek Drive will be retrofitted to slow traffic. Part of the approval of the Casey's Meadow plat required that traffic calming be installed on Mockingbird Way. CIP Section Assessment Other City Total Street -$-$74,800$74,800$ Storm -$-$10,000$10,000$ Wastewater -$-$3,000$3,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$87,800$87,800$ 2020 - 7 Public Infrastructure Improvements - Other Streets Project Descriptions Asphalt Mill and Overlay Program (Annual)777,500$ Document/Study/Planning Document: N/A PASER Rating: Varies Project restores the asphalt surface of existing streets to a very good condition. Work can include curb and gutter repair; stone base course; and spot repairs to sanitary sewer, storm sewer, and water main systems. CIP Section Assessment Other City Total Street 287,500$-$180,000$467,500$ Storm -$-$235,000$235,000$ Wastewater -$-$50,000$50,000$ Water -$-$25,000$25,000$ Sidewalk -$-$-$-$ Total 287,500$-$490,000$777,500$ Concrete Pavement Repairs (Annual)147,000$ Document/Study/Planning Document: N/A PASER Rating: Varies Spot repairs to deteriorated panels of concrete pavement will be made on various arterial, collector, and local streets. Some work will be done in coordination with sanitary manhole rehabilitation project. CIP Section Assessment Other City Total Street -$-$102,000$102,000$ 2020 - 8 Street -$-$102,000$102,000$ Storm -$-$15,000$15,000$ Wastewater -$-$15,000$15,000$ Water -$-$15,000$15,000$ Sidewalk -$-$-$-$ Total -$-$147,000$147,000$ 396,900$ Document/Study/Planning Document: N/A PASER Rating: N/A Up-front engineering services to help in the design of 2021 CIP projects. CIP Section Assessment Other City Total Street -$-$14,400$14,400$ Storm -$-$185,000$185,000$ Wastewater -$-$185,000$185,000$ Water -$-$12,500$12,500$ Sidewalk -$-$-$-$ Total -$-$396,900$396,900$ Environmental Assessments, Subsurface Explorations, and Storm and Sanitary Sewer Televising for 2021 Construction Projects 2020 - 8 Public Infrastructure Improvements - Other Streets Section Summary CIP Section Assessment Other City Total Street 287,500$-$831,200$1,118,700$ Storm -$-$445,000$445,000$ Wastewater -$-$253,000$253,000$ Water -$-$52,500$52,500$ Sidewalk -$-$-$-$ Total 287,500$-$1,581,700$1,869,200$ 2020 - 9 2020 - 9 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Stringham Watershed Construction 3,000,000$ Document/Study/Planning Document: N/A PASER Rating: N/A This project will include dredging sediment from lagoons, repairing shoreline erosion, and reconfiguring lagoons for improved storm water management. The Stringham watershed generally encompasses an area from the Universal Business Park, northeasterly to Iowa Street at the Fox River. Major landmarks within the watershed include the Vulcan Quarry and South Park. This project will help reduce the flooding impacts experienced in the South Park vicinity and the Ohio Street area between West 9th Avenue and South Park Avenue. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$3,000,000$3,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$3,000,000$3,000,000$ Johnson Creek Watershed Construction 2,000,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Design of first identified flood reduction alternative. The Johnson Creek Watershed generally encompasses an area of approximately one-half mile wide, from the intersection of Knapp Street and C.T.H. N northeasterly to Lake Winnebago. 2020 - 10 Street and C.T.H. N northeasterly to Lake Winnebago. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$2,000,000$2,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$2,000,000$2,000,000$ 2020 - 10 Public Infrastructure Improvements - Storm Water Utility Project Descriptions Gallups/Merritts Creek Watershed Land Acquisition 1,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A The watershed generally encompasses an area starting southwest of the City of Oshkosh, near S.T.H. 26 and C.T.H. N and northeasterly towards West 28th Avenue and South Main Street. Major landmarks within the watershed include the Ford Festival Grounds and Airport Industrial Park (between West 35th Avenue and West 29th Avenue). CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$1,500,000$1,500,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,500,000$1,500,000$ West Murdock Avenue Watershed Design 200,000$ Document/Study/Planning Document: N/A PASER Rating: N/A The West Murdock Avenue watershed is roughly bounded by Liberty Street on the east, New York Avenue on the south, Linwood Avenue on the north, and Algoma Boulevard and the Fox River on the west. CIP Section Assessment Other Utility Total 2020 - 11 CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$200,000$200,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$200,000$200,000$ Mini Storm Sewers/Storm Laterals 300,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Provide mini storm sewers and laterals to property owners that have requested them. The laterals allow property owners to connect to the storm sewer system without discharging water over the sidewalk. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$285,000$300,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$285,000$300,000$ 2020 - 11 Public Infrastructure Improvements - Storm Water Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm 15,000$-$6,985,000$7,000,000$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 15,000$-$6,985,000$7,000,000$ 2020 - 12 2020 - 12 Public Infrastructure Improvements - Wastewater Utility Project Descriptions Oregon Street Sanitary Interceptor Sewer 7,762,300$ Document/Study/Planning Document: N/A PASER Rating: N/A Installation of new sanitary sewer interceptor from 28th Avenue to south of 35th Avenue to support future development and relieve flows in existing sanitary sewers. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 187,900$-$7,574,400$7,762,300$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 187,900$-$7,574,400$7,762,300$ 1,500,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Work includes identification and elimination of clear water entering the sanitary sewer system and implementation of CMOM/SECAP recommendations. Work can include manhole inspections and repairs, flow monitoring, and/or sewer lining or replacement. Sanitary sewer lining and grouting of laterals and mainline will be performed in areas that have newer concrete streets with aging sanitary sewer infrastructure. Televising inspections will be used to determine the areas of work. This helps to remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a Inflow/Infiltration Removal, Sanitary Sewer Rehabilitation, and Emergency Sanitary Sewer Repairs 2020 - 13 remove clear water from the sanitary sewer system. Clear water entering the sanitary system is a significant problem. The sanitary sewer system is not designed to handle these flows. The result of the excess flow is sanitary sewer backups into residents' homes. CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$1,500,000$1,500,000$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total -$-$1,500,000$1,500,000$ 2020 - 13 Public Infrastructure Improvements - Wastewater Utility Section Summary CIP Section Assessment Other Utility Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater 187,900$-$9,074,400$9,262,300$ Water -$-$-$-$ Sidewalk -$-$-$-$ Total 187,900$-$9,074,400$9,262,300$ 2020 - 14 2020 - 14 Public Infrastructure Improvements - Sidewalks Project Descriptions Sidewalk Rehabilitation and Reconstruction Program 750,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Program rotates through the City on a 10-year cycle to repair defective sidewalk squares. Program also includes citizen complaint locations. Handicap ramps are installed at intersections currently without ramps. Program will also fix deteriorated driveway aprons. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 550,000$-$200,000$750,000$ Total 550,000$-$200,000$750,000$ Sidewalks: New Walk Ordered In 65,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Install new sidewalk along street segments without sidewalk. Selection to be coordinated through Pedestrian/Bicycle committee. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ 2020 - 15 Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 60,000$-$5,000$65,000$ Total 60,000$-$5,000$65,000$ Sidewalks: Subdivision Agreements 55,000$ Document/Study/Planning Document: N/A PASER Rating: N/A Install sidewalks at various locations within newer subdivisions. CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 50,000$-$5,000$55,000$ Total 50,000$-$5,000$55,000$ 2020 - 15 Public Infrastructure Improvements - Sidewalks Section Summary CIP Section Assessment Other City Total Street -$-$-$-$ Storm -$-$-$-$ Wastewater -$-$-$-$ Water -$-$-$-$ Sidewalk 660,000$-$210,000$870,000$ Total 660,000$-$210,000$870,000$ 2020 - 16 2020 - 16 Traffic Improvements Project Descriptions Permanent Traffic Signal at South Westhaven Drive and West 9th Avenue 85,000$ Document/Study/Planning Document: N/A This project would install a permanent traffic signal at the intersection of South Westhaven Drive and West 9th Avenue. The existing temporary signal was installed to support U.S. 41 reconstruction. Although it is not warranted and has arguably degraded safety, the temporary signal has proven to be popular. Bicycle and Pedestrian Infrastructure 50,000$ Document/Study/Planning Document: 2011 Pedestrian and Bicycle Circulation Plan Provide designated funds for bicycle and pedestrian infrastructure improvements. Primary improvements will be bicycle lane striping and symbols and bike facility signage for existing and future routes. Traffic Signal Equipment 45,000$ Document/Study/Planning Document: N/A This item pays for traffic signal equipment to be installed at various intersections as needed, in order to repair knockdowns and/or replace obsolete equipment. Typical purchases include poles, cabinets, controllers, and vehicle detection equipment. LED Replacement 10,000$ 2020 - 17 LED Replacement 10,000$ Document/Study/Planning Document: N/A This item will involve replacement of LED signal heads at City-maintained traffic signals. Total 2020 Traffic Improvements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .190,000$ 2020 - 17 Park Improvements Project Descriptions Rainbow Park Play Equipment and Surfacing 175,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan and Rainbow Park Master Plan Replace the play equipment that was installed in 2004 and is due for replacement. The project will include installation of new play equipment; and poured-in-place rubberized surfacing that is safer, more accessible, more durable, and requires less maintenance than wood fiber. Quarry Park Restrooms Update 80,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The restrooms at the park are in very poor condition, as noted in the updated CORP, as well as the citizen surveys for the Plan update. The project will include updating the entire building to be ADA-compliant, including new plumbing, lighting, fixtures, ceiling, walls, partitions, etc. Quarry Park Dog Park Development 75,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan A fenced dog park will be constructed at Quarry Park in conjunction with the renovation of the restroom building at the park. Westhaven Circle Park Splash Pad 200,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The CORP for the City recommends the installation of a splash pad at Westhaven Circle Park. With the popularity of the splash pad at South Park, citizens have requested a splash pad on the west side of the City. Menominee Park Zoo Improvements 200,000$ Document/Study/Planning Document: Menominee Park Zoo Master Plan The Menominee Park Zoo Master Plan identified several new exhibits and projects. This would be the City's contribution to improvements that will be identified by staff and the Zoological Society. Westhaven Circle Park Ball Field Updates 135,000$ Document/Study/Planning Document: Comprehensive Outdoor Recreation Plan The Park and Open Space Plan for the City recommends, as a high priority, improvements to the ball field at Westhaven Circle Park. Improvements would include a renovated infield, fencing, bleachers, irrigation, etc. Total 2020 Park Improvements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .865,000$ 2020 - 18 Public Property Improvements - Non-Utility Project Descriptions Community Development: Great Neighborhoods Initiative 250,000$ Document/Study/Planning Document: Healthy Neighborhood Initiative/Strategic Plan/ Comprehensive Plan Construct neighborhood improvements that support the Healthy Neighborhood Initiative in concert with Neighborhood Associations and neighborhood improvement partners. Projects are located in the right-of-way or on public property, and include streetscape improvements and signage, pedestrian and bicycle safety improvements, park improvements, safe routes to school improvements, and others identified and approved by the City Council. Blight Removal for Neighborhood Redevelopment 200,000$ Document/Study/Planning Document: Strategic Plan/Comprehensive Plan Acquisition, demolition, and remediation of various sites with WDNR permitting/site closure, if required. Riverwalk Signage 50,000$ Document/Study/Planning Document: Riverwalk Corridor Design Guidelines Purchase and installation of riverwalk signage and banners, way-finding signage, kiosks, and park regulations. 2020 - 19 General Services: Roofing/HVAC Improvements 500,000$ Document/Study/Planning Document: Roofing and HVAC Study Ongoing program to address improvements for roofing and HVAC projects, based on McKinstry/Summit Designs HVAC Inventory Assessment and Specialty Engineering Group Roofing Inventory Assessment. Projects are prioritized annually based on condition. City Hall Elevator Modernization 165,000$ Document/Study/Planning Document: 2014 Performance Elevator Consulting Assessment Based on the elevator assessment completed by Performance Elavator Consulting in 2014, the City Hall elevator will be 30+ years old in 2020 and is at, or near, the end of its normal service life. The report recommends a full modernization of this elevator. 2020 - 19 Public Property Improvements - Non-Utility Project Descriptions Museum: Implement Site Plan Phase IV - Event Garden 525,000$ Document/Study/Planning Document: N/A Implementation of the site master plan. This project will be done in five (5) phases (2015-2021), to be coordinated with work on the entrance and parking lots. Phase I, Entry Walk, will be constructed in 2015. Phase II (2018) is the "Event Garden" on the north lawn and moving The Hiker monument. Phase III (2019) is the "Pergola and Fountain," which is a continuation of the Event Garden. Phase IV (2020) is the most costly, which is the "Arrival Garden" and the Museum's two parking lots. This work should be coordinated with revisions to the Steiger Wing entrance. The final phase (2021) is the "Pavillion Garden" in the far northwest corner. Memories & Dreams Exhibit Gallery 400,000$ Document/Study/Planning Document: Strategic Plan; and avrious assessments, planning studies, This project is the next generation Memories & Dreams exhibition gallery. The current exhibit opened in 1997. An exhibit firm will be used to plan and fabricate a new exhibit for this second floor, 2,200 square foot gallery. The work will be done in three phases: Conceptual Design (2018); Design Development (2019); and Fabrication and Installation (2020). The exhibit plan for this gallery will be based on the input received from the 2013 strategic planning process and incorporate current best practices of the profession. A full gallery replacement of this magnitude is typically a three or four year project. and reports. 2020 - 20 year project. Parks: Lakeshore Municipal Golf Course High Capacity Well 110,000$ Document/Study/Planning Document: N/A New well is needed as a source for irrigation water reservoir. Transportation: Parking Lot Improvements 700,000$ Document/Study/Planning Document: 2015 Parking Lot Assessment This allocates funding toward future reconstruction of municipal parking lots. LED Streetlighting Upgrades 25,000$ Document/Study/Planning Document: N/A This project would replace high-pressure sodium (HPS) lights at various locations with LED lighting. HPS lights have a 3-5 year lifespan and are not typically replaced within a CIP. LED lamps, conversely, are expected to last 10-20 years, and therefore qualify as a capital improvement. 2020 - 20 Public Property Improvements - Non-Utility Project Descriptions Purchase Streetlighting Poles 25,000$ Document/Study/Planning Document: N/A The City owns over 1,000 streetlighting poles. While these poles are expected to have a long, serviceable life, we do lose poles through damage from car accidents (about half of which are hit and run/ unrecoverable). In addition, we are trying to expand the number of City-owned poles. This project would help to increase our inventory for both replacement of varying types of lighting poles we have and to allow for future expansion. Pedestrian Accessibility Improvements 10,000$ Document/Study/Planning Document: 2011 Transit Development Plan This project will pay for paving and curbing improvements to bring high-usage transit stops into compliance with the Americans with Disabilities Act. Locations will be prioritized based on the level of current ridership, and the cost of making the improvement. Total 2020 Public Property Improvements - Non-Utility. . . . . . . . . .2,960,000$ 2020 - 21 2020 - 21 Public Property Improvements - Utility Project Descriptions Clearwell Replacement (Water Filtration)3,517,000$ Document/Study/Planning Document: Wisconsin Department of Natural Resources 2007 Sanitary Survey; 2014 CH2M Hill Study The Water Filtration Plant clearwells store treated water prior to pumping into the water distribution system. The north and middle clearwells were installed in 1916 and the south clearwell was installed in the 1950's. These structures have exceeded their useful life and no longer meet WDNR Code requirements for in-ground water storage structuresand need to be replaced. Dual Media Filter #4 Concrete Repairs (Water Filtration)170,000$ Document/Study/Planning Document: N/A The dual media filters were constructed in 1998 and put into service in 1999. The filters need to be inspected and repairs made to concrete and control joints. Phosphorus Regulatory Compliance Project - Construction (Wastewater)25,000,000$ Document/Study/Planning Document: WPDES Permit Requirements This is a multi-year project to implement compliance with regulatory requirements for phosphorus treatment. Floor Replacement for Clarifier #1 and #2 (Wastewater)400,000$ Document/Study/Planning Document: N/A Current floor is in poor condition and will need to be replaced as the clarifier loses efficiency. 28th Avenue Lift Station Upgrade (Wastewater)80,000$ Document/Study/Planning Document: N/A This station has been in service since 1966, went through a partial upgrade in 2002, and is in need of further upgrades. Total 2020 Public Property Improvements - Utility . . . . . . . . . . . . . . . .29,167,000$ Total Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3,687,000$ Total Wastewater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25,480,000$ Total Storm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .-$ 2020 - 22 Major Equipment Amount 113,000$ 89,000$ 38,000$ 325,000$ 50,000$ 40,000$ 542,000$ Dual Media Filter Mud Valve Replacement Water Filtration South Main Street Lift Station Generator Replacement Wastewater Major Equipment Department Ozone Residual Monitor Replacement Water Filtration Sedimentation Basins Sludge Pump Replacement Water Filtration Ground Water Pumps and Controls Replacement for Plant Complex Wastewater Chlorine Feed System Upgrade Wastewater Total 2020 Major Equipment 2020 - 23 Major Equipment - Vehicles Amount 665,000$ 65,000$ 55,000$ $ 55,000 30,000$ 70,000$ 65,000$ 45,000$ 110,000$ 275,000$ 205,000$ 40,000$ 90,000$ 202,000$ 49,000$ 2,021,000$ Parks Street CNG Tandem-Axle Dump Truck with Stainless Steel Dump Body (replaces #834, 2010) Street Water Distribution Major Equipment - Vehicles Department End Dump Trailer (replaces #254, 2002 Raven)Street Roller (replaces #158, 1977 Hyster)Street Fire Engine (replaces 1997), Grass Fire Unit (replaces 1995), and Twelve- Passenger Van (replaces 2000) Tar Kettle (replaces #264, 2008 Lee-Boy) Tractor (Mower/Plow/Blower/Broom) (replaces #454, Toro 7200 Groundmaster)Parks 2 - Pickup Trucks (replaces #418, 2006 Ford F-250 and #406, 2008 Ford Ranger)Parks Fire Department Step Van (replaces #401, 2009 Workhorse)Parks Forklift (Replaces P26, 1967 Clark Forklift) Total 2020 Major Equipment - Vehicles Area Truck with Wing and Plow (replaces #40, 2009 IH) Water Tanker (replaces #246, 1979 Freuhuf)Street Street Tandem Dump Truck with Stainless Steel Box, with Slide-In V-Box and Pre- Wet, Plow and Wing (replaces #68)Street 1/2-Ton CNG Extended Cab 4x4 Pickup Truck (replaces #801, 2010)Water Distribution 3/4-Ton Crew Cab Pickup Truck (replaces #34, 2009 Ford) Boom Truck (replaces #522, 2004 F450) (Signs)Transportation 2020 - 24 Tax Increment Financing (TIF) Districts Improvements Project Descriptions South Shore - Pioneer Island and Marina, Year 3 of 3 Construction 2,265,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan TIF: TID #20 Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. South Shore Central Zone Riverwalk (Sweetwater/Dockside) - Construction 3,424,000$ Document/Study/Planning Document: Fox River Corridor-Riverwalk Plan TIF: TID #20 State Grant: 500,000$ Build riverwalk and associated infrastructure necessary for the installation of the trail including, but not limited to, riverwalk concrete, boardwalk, dredging, bank stabilization, seawall reconstruction, lighting installation, benches, and signage. Total 2020 TIF Districts Improvements . . . . . . . . . . . . . . . . . . . . . . . .5,689,000$ 2020 - 25 2020 - 25 òò òò òò òò òò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòò òò òòòòòò òò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòò òò òò òò òò òò òò òòòò òò òò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòò òòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòòòòòòòò òòòò òò òò òò òò òò òò òò òò òò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òò òòòò òò òòòòòòòòòò ò ò ò ò ò òòòòò òò òò òòòò òò òòòòòò òò òò òòòò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòò òòòòòòòò òòòòòòòòòòòòòò òò òò òòòò òòòòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òòòòòò òò òòòòòòòòòò òò òòòòòòòò òò òò òòòò òòòòòò òò òò òò òòòò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòò òòòòòòòòòòòò òòòòòòòòòò òòòòòò òò òòòò òò òò òò òò òò òòòò òò òò òòòòòòòòòò òòòòòò òòòò òò òò òò òòòò òò òò òò òòòò òò òò òò òòòòòòòòòò òò òòòò òò òò òò òò òò òòòòòòòò òò òòòòòòòò òò òò òò ò !!!!!!!! FOND DU LAC RD (SANITARY) W RIPPLE AVE (SANITARY, WATER) MARY JEWELL PARK (SANITARY) W 5TH AVE (WATER) W 20TH AVE (SANITARY) E MURDOCK LIFT STATION ABANDONMENT (SANITARY) LIBBEY/NICOLET BASINS (STORM WATER) CEAPE AVE (CONCRETE) FARMINGTON AVE (CONCRETE) CASEYS MEADOW SOUTH 2ND ADDN CASEY TR CLOE JUDE DR MOCKINGBIRD WAY (CONCRETE) BISMARCK AVE (CONCRETE) W SNELL RD (SANITARY, ASPHALT) MILL ST (CONCRETE) OTTER AVE (CONCRETE) BOWEN ST (CONCRETE) W SOUTH PARK AVE (SIDEWALK) N WESTFIELD ST (CONCRETE) SOUTH PARK POND RETROFIT (STORM WATER) N MAIN ST (CONCRETE) JOHNSON CREEK WATERSHED (STUDY) GALLUPS/MERRITTS CREEK WATERSHED (LAND ACQUISITION) FERNAU AVE WATERSHED (LAND ACQUISITION) SAWYER CREEK WATERSHED (STORM WATER) Map By: KPK CITY OF OSHKOSH 2016 CAPITAL IMPROVEMENT PROGRAM ASYLUM BAY LAKE BUTTE DES MORTS FOX RIVER LAKE WINNEBAGO . Legend Concrete Pavement Asphalt Pavement Grade/Gravel Sanitary Sewer Storm Water Water Main ! ! !Sidewalk ûû ûû ûû Future Project òò òò ò Study, Design or Land Sidewalk Rehab Area Approved 11/24/2015 Printed 12/7/2015 òò òò òò òò òò òò òòòòòò òò òò òò òò òòòòòòòòòòòò òòòòòò òòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòò òòòò òò òò òò òò òò òò òò òò òò òòòò òò òò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò ò òòò òòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòò òòòòòò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòò òòòòòòòòòòòòòò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòò òòòòòò òòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòòòòòòòò òòòò òò òò òò òòòòòòòò òòòòòòòòòò òòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòò òò òò òò òò òò òò òò òò òò òò òò òò òò òò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòò òòòòòòòòòòòòòò òò òò òò òòòò òòòò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòò òòòò òò òò òòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòò òòòò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòò òòòòòòòòòòòò ò ò òòòòòòòò òòòòòò òò òòòò òò òò òò òò òò òòòò òò òò òò òòòòòòòò òòòòòò òòòò òò òò òò òòòò òò òò òò òòòò òò òò òò òò òò òòòòòò òò òòòò òò òò òò òò òò òòòòòòòòòò òòòòòòòò òò òò òò ò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòò òòòòòò òòòòòò òò òòòòòòòòòòòòòòòò òò òòòòòòòò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòò òò òò òòòò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòò òòòò òòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò E PARKWAY AVE (STORM WATER)OSCEOLA (CONCRETE) E MURDOCK AVE (CONCRETE) EICHSTADT RD (STORM WATER) W NEW YORK AVE (CONCRETE) OSHKOSH AVE (SANITARY) OREGON ST (CONCRETE) BAY SHORE DR (CONCRETE) WEST MURDOCK AVE WATERSHED (STUDY) STRINGHAM CREEK WATERSHED (DESIGN) FERNAU AVE WATERSHED (DESIGN) SAWYER CREEK WATERSHED (STUDY) Map By: KPK CITY OF OSHKOSH 2017 CAPITAL IMPROVEMENT PROGRAM ASYLUM BAY LAKE BUTTE DES MORTS FOX RIVER LAKE WINNEBAGO . Legend Concrete Pavement Asphalt Pavement Grade/Gravel Sanitary Sewer Storm Water Water Main ! ! !Sidewalk ûû ûû ûû Future Project òò òò ò Study, Design or Land Sidewalk Rehab Area Approved 11/24/2015 òòòòòòòò òò òòòòòòòòòòòòòòòò òò òò òòòòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òò òòòò òò òòòòòòòòòò ò ò ò ò ò òòòòò òò òò òòòò òò òòòòòò òò òò òòòò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òò òòòòòòòòòòòòòòòòòò òò òò òòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòò òò òò òò òò òò òò òò òò òò òò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòò òòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òò òòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòò ò òòòòòòò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòò ò òò òò òò òò òò òò òòòòòòòòòòòò òòòòòòòòòò òò òò òò òò òò òò òò òò òò òò òò òò òòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òò òò òò òò òòòò òò òò òòòòòòòò òò òò òòòòòòòò òò òò òò òò òòòòòò òò òò òò òò òò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òò òòò òòòòòòòòòò ò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòò òò òòòò òò òò òò òò òò òò òò òò òòòò òò òò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòò òòòò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòò òò òòòòòò òòòòòòòòòòòòòò òòòòòòòòòòòòòòòò òò òò òòòòòò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòò òòòò òò òò òò òò òò òò òò òòòò òò òò òò òò òòòòòòòòòòòò òòòòòò òòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòò òòòò òò òò òò òò òò òò òò òò òò òòòò òò òò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòò òò òòòò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòò òòòòòòòòòòòòòò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòòòòòòòòòòòòòò òòòò òò òò òò òòòòòòòòòòòòòòòòòò òòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòò òò òò òò òò òò òò òò òò òò òò òò òò òò òò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòò òòòòòòòòòòòòòò òò òò òòòòòò òòòò òò WAUGOO AVE (CONCRETE) HAWK ST (SANITARY) PUNHOQUA ST (SANITARY) ARTHUR AVE (VAC) (SANITARY) MAPLE ST (SANITARY) COURT ST (STORM WATER) MILL ST (CONCRETE) BUCHANAN AVE (SANITARY) GRAND ST (CONCRETE) PUNHOQUA ST (CONCRETE) N EAGLE ST (SANITARY) LAKE ST (CONCRETE) CLAIRVILLE RD TID #23 (WATER) BOWEN ST (CONCRETE) OREGON ST (CONCRETE) JOHNSON CREEK WATERSHED (LAND ACQUISITION) GALLUPS/MERRITTS CREEK WATERSHED (DESIGN) FERNAU AVE WATERSHED (STORM WATER) SAWYER CREEK WATERSHED (LAND ACQUISITION) CAMPBELL CREEK WATERSHED (STUDY) Map By: MFF CITY OF OSHKOSH 2018 CAPITAL IMPROVEMENT PROGRAM ASYLUM BAY LAKE BUTTE DES MORTS FOX RIVER LAKE WINNEBAGO . Legend Concrete Pavement Asphalt Pavement Grade/Gravel Sanitary Sewer Storm Water Water Main ! ! !Sidewalk ûû ûû ûû Future Project òò òò ò Study, Design or Land Sidewalk Rehab Area Approved 11/24/2015 òòòòòòòò òò òòòòòòòòòòòò òò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò ò ò ò òòò òò òòòò òò òòòòòòòòòò òò òò òòòòòò òò òò òòòò òò òòòòòò òò òò òòòò òò òò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòò òòòòòòòò òò òòòò òò òò òò òò òò òòòò òòòòòò òò òò òò òò òòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òò òò òò òò òò òò òò òò òò òòòò òò òò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòò òòòòòò òò òò òò òò òòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòò ò òòòòòòòòòòòòòòòòòòòò òòòò òò òò òò òòòòòòòò òòòòòòòòòò òòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòò òò òò òò òò òò òò òò òò òò òò òò òò òò òò òòòòòòòòòò òò òòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòò òò òò òòòòòòòòòò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òòòòòòòò òòòò òò òò òòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòò òòòò òò òò òòòòòòòò òòòòòòòòòòòòòòòòòò òòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òò òò òò òò òò òò òò òò òò òòòò òò òò òò òò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òòòòòòòòòòòòòòòòòòòòòò òòòò òòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òò òò òòòòòòòò òòòòòòòò òò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòòò òòòò òòòòòòòòòòòò MOCKINGBIRD WAY TRAFFIC CALMING (CONCRETE) COURT ST (CONCRETE) BOWEN ST (CONCRETE) OTTER AVE (CONCRETE) WASHINGTON AVE (CONCRETE) OREGON ST (CONCRETE) RIPON LN (ASPHALT) JOHNSON CREEK WATERSHED (DESIGN) WEST MURDOCK AVE WATERSHED (LAND ACQUISITION) GALLUPS/MERRITTS CREEK WATERSHED (STORM WATER) STRINGHAM CREEK WATERSHED (STORM WATER) SAWYER CREEK WATERSHED (DESIGN) CAMPBELL CREEK WATERSHED (LAND ACQUISITION) Map By: KPK CITY OF OSHKOSH 2019 CAPITAL IMPROVEMENT PROGRAM ASYLUM BAY LAKE BUTTE DES MORTS FOX RIVER LAKE WINNEBAGO . Legend Concrete Pavement Asphalt Pavement Grade/Gravel Sanitary Sewer Storm Water Water Main ! ! !Sidewalk ûû ûû ûû Future Project òò òò ò Study, Design or Land Sidewalk Rehab Area Approved 11/24/2015 ûûûûûûûûûûûûûûûûûûûûûûûûûûûû MOCKINGBIRD WAY TRAFFIC CALMING (CONCRETE) CHERRY ST (CONCRETE) MCKINLEY ST (CONCRETE) BAY SHORE DR (CONCRETE) BOWEN ST (CONCRETE) E LINCOLN AVE (CONCRETE) W LINCOLN AVE (CONCRETE) W SNELL RD (CONCRETE) CEAPE AVE (CONCRETE)W 9TH AVE (FUTURE PROJECT) Map By: KPK CITY OF OSHKOSH 2020 CAPITAL IMPROVEMENT PROGRAM ASYLUM BAY LAKE BUTTE DES MORTS FOX RIVER LAKE WINNEBAGO . Legend Concrete Pavement Asphalt Pavement Grade/Gravel Sanitary Sewer Storm Water Water Main ! ! !Sidewalk ûû ûû ûû Future Project òò òò ò Study, Design or Land Sidewalk Rehab Area Approved 11/24/2015