Loading...
HomeMy WebLinkAboutWesthaven_Clubhouse_PIM_06-01-2011_Slideshow1 City of Oshkosh Stormwater Management Westhaven Clubhouse Area Detention Basin Neighborhood MeetingNeighborhood Meeting June 1, 2011June 1, 2011 James Rabe, P.E., CPESCJames Rabe, P.E., CPESC Civil Engineer IICivil Engineer II Storm Water UtilityStorm Water Utility 2 Overview •Watershed Characteristics •Purpose of the Project •Detention Basin Design •Discussion 3 Watershed Characteristics Project Area Watershed = 72 acres W. 20th Ave. S. W e s t h a v e n D r . Newport Ave.Detention Basin Ma r i c o p a D r . 4 Purpose of Project •Eliminate Street Flooding for 10 -year Rain Storm –2.06”of rain in 2 hours. •Reduce Street Flooding for Larger Storms Look at performance during –25-year rain (2.59”in 2 hours); and –100-year rain (3.68”in 2 hours) •Keep Flooding on Streets and Away from Homes for Larger Storms 5 Detention Basin Design •Flood Control Benefits –Storm sewer improvements reduce flooding in watershed •Westhaven Circle •Westhaven Drive •Maricopa Drive •Newport Court –Stormwater stored and slowly released •Reduce flooding downstream 6 Detention Basin Design Considerations •Add Inlet Capacity –Increase size of inlets –Add more inlets –Newport Court, Westhaven Circle, Westhaven Drive, & Maricopa Drive •Detention Basin –Maximize stormwater storage (Approx 17 ac-ft) –Reduce stormwater pollution (trap sediment) 7 Detention Basin Design Considerations Forebay (Sediment Capture) 8 Detention Basin Design Considerations •Safety Considerations –Gradual side slopes above water –14 foot wide safety shelf area (1 foot or less of water) •Aesthetics –Prairie grasses/flowers on side slopes –Wetland plantings in shallow water areas –Trees & shrubs 9 Discussion