Loading...
HomeMy WebLinkAboutMarch_28_1012_Meeting_PresentationExcellence in Engineering Since 1946 Sawyer Creek Channel Improvements Public Information Meeting March 28, 2012 Introductions City Engineering Staff •David Patek – Director of Public Works •Steve Gohde – Assistant Director of Public Works •Jame Rabe – Civil Engineer II Strand Associates Inc.® •Matt Yentz – Project Manager Municipality Area (Acres) Area (%) City of Oshkosh 31.7 14.1 9.5 30.1 14.6 Total 100% Project Location Sawyer Creek Watershed 10,000 Acres Existing Channel Ditch Like upper section Meandering Stream middle section Open Channel lower section Project Limits Sawyer Creek from Koeller Street to Fox River Proposed Improvements – Channel Proposed Improvements – Channel Red Arrow Park Fishing Hole N. E a g l e S t r e e t Adams Avenue N. W e s t f i e l d S t r e e t Bank Stabilization Area West Algoma Park Canoe Launch Pu n h o q u a St r e e t Evergreen Fishing Hole Ha w k S t r e e t Br o o k w o o d Ct Proposed Improvements – Invasive Plant Removal Buckthorn Spreads Rapidly Degrades Natural Communities Destroys Wildlife Habitat Proposed Improvements – Fish Habitat Red Arrow Park West Algoma Park Proposed Improvements – Canoe Access Proposed Improvements – Slope Stabilization Proposed Dredging Features Geotubes Geotubes Cofferdam Oshkosh Northwestern photo by Joe Sienkiewicz Hydraulic Dredging 2012 Schedule Opinion of Construction Cost •$1.5 to 2 million Estimated Project Cost •30,000 to 40,000 cubic yards Estimated Sediment Removal Thank You for Your Time! Questions and Answers Excellence in Engineering Since 1946