Loading...
HomeMy WebLinkAboutLibbey-Nicolet_Watersheds_Common_Council_Presentation_10-11-20111 City of Oshkosh Stormwater Management Study City Council Meeting; October 11, 2011 2 Project Goals Rain Event Management Goal 10yr 1 hour rain(167” . 100 yr – 1 hour rain (2.98”)Passableroad for emergency vehicles Reduce stormwater pollution 3 Project Area Description Study area includes 2 watersheds: Nicolet Ave. (240 ac) Libbey Ave . (490 ac) Packer Ave. Packer Ave. rr i s o n S t . S t . S t . d S t . North n S t . t. Ja c k s o n S t . North Ha N. M a i Ja c k s o Vi n l a Linwood Ave. Ha r r i s N. M a i n Vi n l a n d S t . Linwood Ave. .. 4 Existing Conditions (10-yr Storm Event) Significant Flooding Locations Packer Ave & HarrisonNorth HS Area ai n S t . Packer Ave. N. M ks o n S t . North Ha r r i s o n S t . Ja an d S t . Jackson St. Vi n l . 5 Alternative Evaluation 12 alternatives analyzed ¾Each alternative included multiple management components ¾Improvements to existing storm sewers ¾New storm sewers ¾Detention basins 6 Alternative Evaluation Potential Detention Basin Sites North BasinName Flood Storage Volume (ac. ft.) 1. Libbey/ No. Main Wet Basin 34 2. Libbey/ No. Main Dry Channel 15 3. Tree Farm Wet Basin 49 4. Packers Ave (south) Wet Basin 17 5. Packers Ave (north) Wet Basin 16 6. North H. S. Wet Basin 15 7 Alternative Evaluation Alternativeswere evaluated basedon:Alternatives ¾Elimination of street flooding in 10-year storm event ¾¾eas y o cons ruc on we an s, u y con c s, e c. ¾Construction cost ¾Reduction of flooding for larger storm events (25-yr & 100-yr) ¾Pollution control 8 Alternative Evaluation Alternative10 OptionAlternative 9 Alternative Evaluation Alternative12 OptionAlternative 10 Alternative Evaluation 25-- Jackson Street (greater than 1-ft) Evaluated larger storm sewer (box culverts) on Jackson ree ¾Replaced circular storm sewer with box culvert (5’ x 8’) ¾Other components remain the same ¾Improved flood control during larger storm events 11 Alternative Evaluation – Pollution Control Sediment RemovalSummary Alternative Sediment Removed tons year Alternative 10 A 48.6 Alternative 12 A 48.1 Cost Summary * (with box culvert in Jackson) lternative Estimated Cos Alternative 10 A $9.4 million Alternative 12 A $8.7million * Cost estimates based on 2010 -2011 City of Oshkosh projects 12 Recommended Alternative Alternative12AAlternative ¾Flood control benefits (Jackson street flooding eliminated un er yr even ¾Water quality benefits ¾Cost ¾Fewer detention basin sites 13 Phased Implementation Im lementation Phase I North Hi h School Area Constructed in 2010 14 G. Discussion/Questions