HomeMy WebLinkAboutconstruction_access_agreement_blankI:\Engineering\Storm Water Information\Mini-Storm Sewer Program Information\Property Owner
Information\Construction Access Agreement Blank.docx Page 1 of 1
CONSTRUCTION ACCESS AGREEMENT
Owner:
Parcel Address:
Parcel Number:
Settlement Amount:For Mutual Benefit
Purpose:Installation of new or relayed storm laterals; installation of storm lateral inlets; removal
and installation of sidewalk and driveways; root pruning;grading operations;lawn
restoration; and installation of sidewalk curb, if necessary.
For the above stated amount, the undersigned owner(s) grant to the City of Oshkosh, a Construction Access
Agreement to occupy and use the owner’s land for the above-stated purposes; so long as required for such purpose,
and to operate necessary equipment thereon, including the right to preserve, protect, remove, or plant any
vegetation the authorities may deem desirable to prevent the erosion of soil.
The Construction Access Agreement, as described, will begin on the date of the final signature below, and except
for warranty work, will terminate at the completion of the project. After completion of the project, the Construction
Access Agreement will continue for the limited purpose of undertaking warranty work. City projects include a
two (2) year warranty period, and the City must notify its Contractor of defects within that period. The City will
send a reminder notice and contact information to property owners shortly before the warranty expiration.
___________________
Owner/Title (Printed)Contact Phone Number
Signature Date
___________________
Owner/Title (Printed)Contact Phone Number
Signature Date
___________________
Owner/Title (Printed)Contact Phone Number
Signature Date
City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.oshkoshwi.gov