HomeMy WebLinkAboutBuildingGuideRaze
1 2/6/2024
This handout will help guide you through the permit application process. Following the steps below will
help to expedite the issuance of your building permit. Please plan ahead and pick one of the following
methods to apply for your permit. We suggest that you apply for the permit a minimum of 2 weeks prior to
your start date. Permits can be applied for by using the following methods below:
In Person:
This is the best method to discuss the specifics of your project with a planner and inspector.
How to Apply:
Step 1: Obtain and/or verify that a lateral permit has been obtained by a licensed plumbing contractor for
disconnection of the sewer/water. Inspectors are available for consultation and permit issuance
7:30am-4:30pm Monday through Friday.
Step 2: Obtain a building permit for razing the structure.
Payment
The City of Oshkosh accepts cash, check or credit/debit cards for payment (a service fee applies when
using cards) . If you have questions on permit fees please see page 2.
Inspection Requests
After the permit is obtained inspections can be requested by calling the Inspection Request Line at (920)
236-5128. This is an automated line, and you will need the permit number or address and inspection type
you are requesting to schedule.
Online:
When applying for a permit online please follow this link: http://www.oshkoshwi.gov/EvolvePublic/
How to Apply
Step 1: Click on “New Account” or “Login” located in the upper right hand corner and enter your contact
information. If you have an existing account with our department you may need to contact our
office at (920) 236-5050 to set up a password.
Step 2: Click on “Permit Application” on the left side of the screen. Select “Raze” or “Lateral” for the
category, click Next.
Step 3: Enter the address of the project, click next. If the address does not show up enter it in the lower
box, click next.
Step 4: Enter the description of your project and the cost. It also needs to include the fair market values for
labor (even if you are doing the work) and material costs. Only the highlighted fields need to be
filled in, click next.
Step 5: If you are applying as the owner, you may also if you choose, add any contractors you may have
hired for your project. This is not required. Only contractors that have obtained permits in the past
with the City of Oshkosh may be added, as they will have an existing account.
Step 6: Read the Esignature statement and check the “I agree to conditions” box, hit finish.
Underground Utilities: Call Diggers Hotline 3 Work Days Before You Dig! 1-800-242-8511
Raze Permits
City of Oshkosh Inspection Services Division
2 2/6/2024
Step 7: You will see a message that your application has been submitted for review. Someone from the City
will contact you if additional information is required and/or when the permit is ready to be issued.
Please check your junk/spam folder if you do not receive contact from the City.
* Please note that no construction can commence until after the permit is approved and obtained.
* When the permit is ready to be issued you’ll be able to make payments.
* Inspections will be able to be scheduled after the permit has been obtained.
Permit Fees:
See the following fee schedules to determine the permit fees:
• Inspection Services fee schedule for building fees. Questions please contact (920) 236-5050.
• Assessors fee schedule for property record maintenance fees. Questions please contact (920) 236-5070.
• Planning Services fee schedule for zoning fees. Questions please contact (920) 236-5059.
Permit fees will need to be payable to the “City of Oshkosh”.
Wisconsin Department of Natural Resource (DNR) Requirements:
• Prior to razing a dwelling, a lateral permit must be obtained to cap the lateral by a licensed
plumber, before the raze permit will be approved.
• The permit shall include the number of living units being razed.
• All utilities must be disconnected.
• Prior to razing any structures please refer to the WI Department of Natural Resource’s code requirements
including NR 447 “Control of Asbestos Emissions” to help determine if your razing project requires an
asbestos inspection and asbestos notification to the DNR.
This can be found at the following website, http://dnr.wi.gov/topic/demo.
Building Demolition Safety Requirement:
When any person desires to demolish any building standing within 10 feet of any public street, alley or side-
walk, he/she shall carefully and completely remove story after story, commencing with the top story first. NO
materials or parts of such building shall be thrown or allowed to fall upon such street, alley or sidewalk or so
near the same as to endanger persons or property thereon, but shall be carefully lowered to the ground upon
displacement. The material to be removed shall be properly wet down to lay the dust incident to its removal.
This handout was developed by the City of Oshkosh Inspection Services Division as a basic plan submittal guide. It is
not intended to cover all circumstances. Check with the Inspection Services Division for additional requirements that
may apply to your specific project.
If after reading this guide you still have questions please feel free to contact the Inspection Services Division at
(920) 236-5050.
Additional Requirements: