HomeMy WebLinkAboutVinton Construction Change Order 2 PW 17-19 • 13961 1-j TO: VINTON CONSTRUCTION COMPANY CHANGE ORDER#2 (REVISED) P.O. BOX 1987 DATE: MAY 2,2019 MANITOWOC,WI 54221-1987 Your present contract with the City of Oshkosh, Contract No. 17-19,awarded July 25,2017, is hereby amended and changed as follows: NET INCREASE: $17,108.85 NET DECREASE: $0.00 NET INCREASE TO CONTRACT $17,108.85 TOTALS BID TOTAL $1,598,113.98 $1,598,113.98 CO#1 $137,990.00 $137,990.00 PREVIOUS BID TOTAL $1,736,103.98 $1,736,103.98 CO#2 $17,108.85 $17,108.85 CONTRACT TOTAL $1,753,212.83 $1,753,212.83 CITY OF OSHKOSH City Manager City Clerk Approve and accepted: ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. . flrc tt' Co ptroller Approved 1sto form: City A r • CONTRACT 17-19 CHANGE ORDER#2 FINAL(REVISED) 17-19 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Clearing;complete as 1010 specified Stations 3.80 4.50 0.70 $986.00 $690.20 Grubbing; complete as 1020 specified Stations 3.80 4.50 0.70 $986.00 $690.20 Removing pavement; Square 1100 complete as specified Yards 790.00 667.70 -122.30 $2.50 ($305.75) Removing concrete and asphalt sidewalk and driveway;complete as Square 1120 specified Feet 240.00 156.60 -83.40 $0.80 ($66.72) Unclassified excavation; Cubic 1200 complete as specified Yards 219.00 149.90 -69.10 $16.50 ($1,140.15) Restore gravel driveway/ Square 1372 apron;complete as specified Yards 150.00 516.00 366.00 $4.00 $1,464.00 Sawing existing pavement; Linear 1700 complete as specified Feet 905.00 700.20 -204.80 $3.00 ($614.40) Tack coat;complete as 1900 specified Gallons 56.00 0.00 -56.00 $5.05 ($282.80) 5"asphaltic pavement with 10"CABC and grading; Square 1905 complete as specified Yards 790.00 667.70 -122.30 $44.65 ($5,460.70) 4"asphaltic surface with 6" CABC and grading; complete Square 1916 as specified Yards 240.00 156.20 -83.80 $48.14 ($4,034.12) Furnish and install 10"storm Linear 2002 sewer; complete as specified Feet 25.00 20.00 -5.00 $44.50 ($222.50) Furnish and install 12"storm Linear 2003 sewer; complete as specified Feet 85.00 69.50 -15.50 $46.50 ($720.75) Furnish and install 15"storm Linear 2006 sewer; complete as specified Feet 35.00 34.00 -1.00 $48.50 ($48.50) Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2508 specified Each 2.00 2.00 $150.00 Sediment removal-Type D modified inlet protection; 2510 complete as specified Each 2.00 0.00 -2.00 $100.00 ($200.00) Furnish; install;maintain; and remove stone tracking pad; 2512 complete as specified Each 2.00 0.00 -2.00 $1,500.00 ($3,000.00) Furnish;install; maintain;and remove stone bag; complete 2516 as specified Each 10.00 0.00 -10.00 $150.00 ($1,500.00) Furnish; install; maintain;and remove 12"diameter sediment logs;complete as Linear 2518 specified Feet 40.00 10.00 -30.00 $10.00 ($300.00) Furnish; install; maintain; and remove ditch check; 2522 complete as specified Each 77.00 66.00 -11.00 $250.00 ($2,750.00) Install salvaged topsoil 6" Square 2602 depth;complete as specified Yards 9,184.00 8,851.50 -332.50 $4.00 ($1,330.00) Furnish and install native seeding;complete as Square 2610 specified Yards _ 9,184.00 13,250.05 4066.05 $1.01 $4,106.71 Page 1 of 3 • CONTRACT 17-19 CHANGE ORDER#2 FINAL(REVISED) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Furnish and install Class I; Type A erosion control mat; Square 2630 complete as specified Yards 9,184.00 13,250.05 4066.05 $1.85 $7,522.19 Furnish and install 8"sanitary sewer(new); complete as Linear 3030 specified Feet 300.00 298.00 -2.00 $28.20 ($56.40) Furnish and install standard sanitary sewer manhole(4' diameter);complete as Vertical 3100 specified Feet 14.76 14.00 -0.76 $179.00 ($136.04) Furnish and install internal sanitary sewer manhole chimney seal; complete as 3118 specified Each 1.00 1.00 $382.00 Furnish and install internal sanitary sewer manhole chimney seal extension; 3120 complete as specified Each 1.00 0.00 -1.00 $186.00 ($186.00) Core into existing manhole; 3332 complete as specified Each 1.00 1.00 $990.00 Trenchless 18"sanitary sewer casing pipe;complete Linear 3500 as specified Feet 240.00 240.00 $370.00 Closed circuit televising; Linear 3700 complete as specified Feet 300.00 298.00 -2.00 - $3.00 ($6.00) Furnish and install new 6" ductile iron water main with polywrap;complete as Linear 4020 specified Feet 132.00 163.60 31.60 $45.70 $1,444.12 Furnish and install new 16" ductile iron water main with polywrap; complete as Linear 4028 specified Feet 10,990.00 10,993.00 3.00 $83.42 $250.26 Furnish and install new 16" ductile iron water main with polywrap and TR Flex restrained joints;complete as Linear 4029 specified Feet 380.00 380.00 $78.80 Furnish and install connections to existing 16" water main;complete as 4066 specified Each 2.00 2.00 $1,679.00 Furnish and install 16"x 6" water main tee;complete as 4137 specified Each 14.00 16.00 2.00 $1,481.00 $2,962.00 Furnish and install 6"45 degree water main bend; 4236 complete as specified Each 28.00 20.00 -8.00 $321.00 ($2,568.00) Furnish and install 16"45 degree water main bend; 4240 complete as specified Each 14.00 14.00 $1,371.00 Furnish and install 6"water main gate valve;complete as 4401 specified Each 14.00 16.00 2.00 $1,086.00 $2,172.00 Furnish and install 16"water main gate valve; complete as 4405 specified Each 14.00 16.00 2.00 $7,006.00 $14,012.00 Page 2 of 3 • CONTRACT 17-19 CHANGE ORDER#2 FINAL(REVISED) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Furnish and install 16"x 16" tapping valve and sleeve; 4459 complete as specified Each 1.00 1.00 $13,788.00 Furnish and install hydrant; 4500 complete as specified Each 14.00 16.00 2.00 $3,362.00 $6,724.00 Jack and bore 30"steel water main casing pipe; complete Linear 4704 as specified Feet 380.00 380.00 $417.00 SECTION (BID ITEMS 1010-4704)-SUBTOTAL: $42,037.68 ($24,928.83) NET INCREASE TO SECTION: $17,108.85 ADDITIONAL WORK REQUIRED: CO#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRIC:F PRIC:F Install the Ripple Avenue Pressure Regulating Valve (PRV)Station; complete as FO1 specified Stations 1.00 1.00 $137,990.00 ADDITIONAL WORK: CO#1 (BID ITEM FO1)-SUBTOTAL: $0.00 $0.00 NET DECREASE TO SECTION: $0.00 NET INCREASE TO SECTION $17,108.85 NET DECREASE TO SECTION $0.00 NET INCREASE TO CONTRACT: $17,108.85 Page 3 of 3