Loading...
HomeMy WebLinkAboutMichels Civil 17-07 amendment (3L+2T TO: MICHELS CIVIL CHANGE ORDER#1 (FINAL) P.O. BOX 95 DATE: DECEMBER 31, 2018 BROWNSVILLE, WI 53006 Your present contract with the City of Oshkosh, Contract No. 17-07, awarded February 28, 2017, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($97,552.35) NET DECREASE TO ALTERNATIVE SECTION II: ($17,397.94) NET DECREASE TO CONTRACT ($114,950.29) SECTION I TOTALS BID TOTAL $2,903,967.86 $2,903,967.86 CO#1 ($114,950.29) ($114,950.29) CONTRACT TOTAL $2,789,017.57 $2,789,017.57 CITY OF OSHKOSH BY: City Manager I City Clerk � 1 Approved and accepted: L - Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. Comptroller Approved a form: City Attorney CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Removing pavement; Square 1100 complete as specified Yards 3,035.00 3,118.30 83.30 $4.49 $374.02 Removing concrete and asphalt sidewalk and driveway;complete as Square 1120 specified Yards 37,075.00 34,582.50 -2,492.50 $0.40 ($997.00) Unclassified excavation (sidewalk);complete as Cubic 1205 specified Yards 815.00 0.00 -815.00 $17.97 ($14,645.55) 7"concrete pavement;with 5"CABC and grading; Square 1301 complete as specified Yards 1,640.00 1,716.60 76.60 $45.92 $3,517.47 7"concrete pavement HES; with 5"CABC and grading; Square 1303 complete as specified Yards 100.00 0.00 -100.00 $55.80 ($5,580.00) 8"concrete pavement;with 6"CABC and grading; Square 1311 complete as specified Yards 1,230.00 1,365.80 135.80 $58.71 $7,972.82 Pavement ties; complete as 1350 specified Each 250.00 220.00 -30.00 $6.52 ($195.60) Drilled dowel bars; 1"; 1352 complete as specified Each 168.00 34.00 -134.00 $10.86 ($1,455.24) Drilled dowel bars; 1 1/4"; 1354 complete as specified Each 112.00 120.00 8.00 $13.03 $104.24 Adjust manholes and inlets; 1360 complete as specified Each 6.00 24.00 18.00 $446.91 $8,044.38 4"concrete sidewalk with 3" CABC and grading; complete Square 1500 as specified Feet 2,515.00 3,076.00 561.00 $5.90 $3,309.90 6"concrete sidewalk/ driveway/ramp(HES)with 3" CABC and grading;complete Square 1514 as specified Feet 130.00 0.00 -130.00 $15.03 ($1,953.90) Curb ramp detectable warning field(natural/non- painted);complete as Square 1540 specified Feet 76.00 100.00 24.00 $32.58 $781.92 No.4 reinforcing rods- deformed,epoxy-coated; Linear 1550 complete as specified Feet 135.00 420.00 285.00 $1.30 $370.50 Drilled No.4 sidewalk tie bars -deformed,epoxy-coated; 1560 complete as specified Each 36.00 44.00 8.00 $4.34 $34.72 Locate existing property monuments; complete as 1650 specified Each 1.00 0.00 -1.00 $510.12 ($510.12) Locate existing survey monuments; complete as 1651 specified Each 1.00 0.00 -1.00 $510.12 ($510.12) Replace existing property monuments; complete as 1652 specified Each 1.00 0.00 -1.00 $510.12 ($510.12) Replace existing survey monuments; complete as 1653 specified Each 1.00 0.00 -1.00 $510.12 ($510.12) Sawing existing pavement; Linear 1700 complete as specified Feet 30.00 95.00 65.00 $2.50 $162.50 Page 1 of 12 CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Sawing concrete pavement full depth;complete as Linear 1710 specified Feet 965.00 1,418.00 453.00 $2.50 $1,132.50 Tack coat;complete as 1900 specified Gallons 340.00 165.00 -175.00 $4.22 ($738.50) 4"asphaltic pavement with 10"CABC and grading; Square 1906 complete as specified Yards 4,850.00 4,400.20 -449.80 $30.19 ($13,579.46) Furnish and install 6" storm Linear 2000 sewer; complete as specified Feet 30.00 29.00 -1.00 $49.29 ($49.29) Furnish and install 12"storm Linear 2003 sewer; complete as specified Feet 135.00 164.40 29.40 $45.67 $1,342.70 Furnish and install 12"RCP Class Ill storm sewer; Linear 2004 complete as specified Feet 250.00 279.35 29.35 $51.28 $1,505.07 Furnish and install 15"storm Linear 2006 sewer;complete as specified Feet 35.00 31.30 -3.70 $56.19 ($207.90) Furnish and install 15"RCP Class Ill storm sewer; Linear 2007 complete as specified Feet 80.00 67.40 -12.60 $56.95 ($717.57) Furnish and install 24"RCP Class Ill storm sewer; Linear 2016 complete as specified Feet 145.00 132.50 -12.50 $72.97 ($912.13) Furnish and install 36"RCP Class III storm sewer; Linear 2025 complete as specified Feet 120.00 101.50 -18.50 $97.82 ($1,809.67) Furnish and install 42"storm Linear 2027 sewer; complete as specified Feet 100.00 80.10 -19.90 $201.59 ($4,011.64) Furnish and install 48"RCP Class III storm sewer; Linear 2031 complete as specified Feet 305.00 297.30 -7.70 $124.35 ($957.49) Furnish and install 38"X 60" HERCP Class Ill storm Linear 2055 sewer; complete as specified Feet 55.00 60.50 5.50 $286.51 $1,575.81 Furnish and install 43"x 68" HERCP Class Ill storm Linear 2057 sewer; complete as specified Feet 35.00 32.90 -2.10 $193.81 ($407.00) Furnish and install 4'x 8'box culvert storm sewer; Linear 2078 complete as specified Feet 155.00 146.80 -8.20 $660.67 ($5,417.49) Furnish and install 6'x 8' box culvert storm sewer; Linear 2080 complete as specified Feet 435.00 414.05 -20.95 $749.12 ($15,694.06) Furnish and install 12"RCP Class Ill apron endwall with joint ties;complete as 2140 specified Each 4.00 4.00 $523.60 Furnish and install 15"RCP Class III apron endwall with joint ties; complete as 2141 specified Each 1.00 1.00 $546.09 Furnish and install 24"RCP Class Ill apron endwall with joint ties; complete as 2144 specified Each 1.00 1.00 $710.12 Furnish and install 48"RCP Class Ill apron endwall with joint ties; complete as 2149 specified Each 1.00 1.00 $1,462.90 Page 2 of 12 • CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE E Remove 33"-60"storm Linear 2806 sewer; complete as specified Feet 625.00 522.00 -103.00 $23.25 94.75) Remove 66"and larger storm Linear 2808 sewer; complete as specified Feet 375.00 375.00 $43.60 Remove storm sewer manholes and inlets; 2812 complete as specified Each 12.00 13.00 1.00 $364.71 $364.71 Remove concrete weir structures; complete as Lump 2813 specified Sum 1.00 1.00 $3,590.18 Historic bridge repairs; Lump 2814 complete as specified Sum 1.00 1.00 $23,032.81 Connect to existing storm sewer main;complete as 2850 specified Each 18.00 18.00 $361.21 Connect to existing storm sewer manhole; complete as 2856 specified Each 1.00 4.00 3.00 $722.42 $2,167.26 Mobilization;complete as Lump 2900 specified Sum 1.00 1.00 $9,923.39 Strip and stockpile topsoil; Square 2902 complete as specified Yards 32,290.00 32,446.61 156.61 $0.65 $101.80 Clear trees; complete as Lump 2906 specified Sum 1.00 1.00 $12,217.43 Grub stumps;complete as Lump 2912 specified Sum 1.00 1.00 $8,059.94 Storm sewer utility line opening(UL0);complete as 2914 specified Each 5.00 1.00 -4.00 $753.29 ($3,013.16) General excavation; Lump 2930 complete as specified Sum 1.00 1.00 $128,000.96 Excavation below subgrade; Cubic 2931 complete as specified Yards 1,000.00 100.40 -899.60 $13.84 ($12,450.46) Import clay material; Cubic 2932 complete as specified Yards 13,500.00 13,500.00 $4.78 Construct clay liner; complete Lump 2934 as specified Sum 1.00 1.00 $55,796.87 Construct clay berms and sediment forebays;complete Lump 2935 as specified Sum 1.00 1.00 $15,442.77 Sediment dredging and disposal(PCB sediment); 2940 complete as specified Tons 5,980.00 0.00 -5,980.00 $20.79 ($124,324.20) Sediment dredging and disposal(-non-PCB sediment); complete as 2941 specified Tons 8,050.00 15,288.35 7238.35 $13.61 $98,513.94 Furnish and install fountain/ aerator;complete as 2942 specified Each 2.00 2.00 $7,500.00 Furnish and install hydraulic structure(west lagoon spillway); complete as 2944A specified Each 1.00 1.00 $8,797.60 Furnish and install hydraulic structure(east lagoon secondary spillway); 2944B complete as specified Each 1.00 1.00 $140,092.99 Page 5 of 12 CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Furnish and install hydraulic structure(east lagoon emergency spillway); 2944C complete as specified Each 1.00 1.00 $31,599.94 Furnish and install concrete overlook structure;complete 2945 as specified Each 1.00 1.00 $31,774.11 Furnish and install aluminum railings;complete as Lump 2946 specified Sum 1.00 1.00 $5,101.23 Remove;store; and re-install existing pedestrian bridge; Lump 2947 complete as specified Sum 1.00 1.00 $3,747.36 Furnish and install 12" sanitary sewer(relay); Linear 3004 complete as specified Feet 30.00 20.00 -10.00 $154.78 ($1,547.80) Furnish and install standard sanitary sewer manhole(4' diameter); complete as Vertical 3100 specified Feet 5.00 3.79 -1.21 $408.15 ($493.85) Furnish and install connection to existing 12" 3304 mains;complete as specified Each 2.00 2.00 $884.97 Furnish and install connection to existing 18" sanitary sewer mains; 3308 complete as specified Each 1.00 1.00 $965.31 Furnish and install 18" sanitary sewer open cut casing pipes; complete as Linear 3410 specified Feet 20.00 20.00 $92.60 Remove sanitary sewer; Linear 3854 complete as specified Feet 90.00 38.00 -52.00 $24.44 ($1,270.88) Sanitary sewer utility line opening (ULO); complete as 3890 specified Each 5.00 1.00 -4.00 $753.29 ($3,013.16) Furnish and install 16"ductile iron water main(relay)with polywrap; complete as Linear 4010 specified Feet 66.00 80.00 14.00 $71.10 $995.40 Furnish and install connections to existing 16" water main;complete as 4066 specified Each 2.00 2.00 $1,395.00 Furnish and install 16"45 degree water main bend; 4240 complete as specified Each 2.00 4.00 2.00 $2,443.64 $4,887.28 Furnish and install 16"water main sleeve;complete as 4303 specified Each 1.00 1.00 $1,805.70 Furnish and install 16"water main gate valve;complete as 4405 specified Each 1.00 2.00 1.00 $4,082.88 $4,082.88 Furnish and install 24"water main casing pipe;complete Linear 4730 as specified Feet 20.00 12.00 -8.00 $265.90 ($2,127.20) Water main utility line opening(ULO);complete as 4950 specified Each 5.00 1.00 -4.00 $753.29 ($3,013.16) Page 6 of 12 • CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE/N NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Furnish and install pull box (steel);24"x 36";complete 5016 as specified Each 32.00 30.00 -2.00 $714.17 ($1,428.34) Furnish and install communication vault; 30"x 5032 48"; complete as specified Each 2.00 2.00 $1,530.36 Furnish and install control cabinet;complete as 5050 specified Each 2.00 2.00 $9,896.34 Furnish and install 1" Schedule 40 PVC;complete Linear 5100 as specified Feet 2,176.00 1,972.60 -203.40 $4.08 ($829.87) Furnish and install 3" Schedule 40 PVC; complete Linear 5130 as specified Feet 5,400.00 5,596.30 196.30 $6.12 $1,201.36 Install single head fixture, "City Supplied"; complete as 5400 specified Each 33.00 0.00 -33.00 $663.16 ($21,884.28) Furnish and install Type 5 5504 Base;complete as specified Each 36.00 33.00 -3.00 $688.66 ($2,065.98) SECTION I(BID ITEMS 1100-5504)-SUBTOTAL: $182,773.75 ($263,414.55) NET DECREASE TO SECTION I: ($80,640.80) ADDITIONAL WORK REQUIRED: CO#1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PR/rF Unclassified excavation(5" existing base); complete as Cubic 1-1200 specified Yards 0.00 45.75 45.75 $36.40 $1,665.30 18"Curb and gutter; 8";with 6"CABC and grading; Linear 1-1422 complete as specified Feet 0.00 15.00 15.00 $87.03 $1,305.45 30"Curb and gutter; 7";with 5"CABC and grading; Linear 1-1440 complete as specified Feet 0.00 68.30 68.30 $38.67 $2,641.16 6"Concrete sidewalk/ driveway/ramp with 3"CABC and grading; complete as Square 1-1510 specified Feet 0.00 763.60 763.60 $7.98 $6,093.53 Furnish and install 3"dense base aggregate;complete as 1-1802 specified Tons 0.00 220.80 220.80 $21.27 $4,696.42 Liquidated damages for truck route infractions;complete as 1-1996 specified Each 0.00 2.00 2.00 ($200.00) ($400.00) Furnish and install 5"CABC and grading; complete as Square 1-1997 specified Yards 0.00 329.40 329.40 $17.91 $5,899.56 Furnish and install detour; traffic control; and signage; Lump 1-1998 complete as specified Sum 0.00 1.00 1.00 $2,300.00 $2,300.00 Furnish; install and remove temporary pavement; Lump 1-1999 complete as specified Sum 0.00 1.00 1.00 $2,875.00 $2,875.00 Furnish and install Type 3 inlet riser; complete as Vertical 1-2239 specified Feet 0.00 1.50 1.50 $519.71 $779.57 Page 7 of 12 CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE 6'diameter storm sewer manhole cover with Type 3 inlet opening;complete as 1-2240 specified Each 0.00 1.00 1.00 $4,131.70 $4,131.70 Furnish and install 6"storm sewer lateral;complete as Linear 1-2400 specified Feet 0.00 27.50 27.50 $49.29 $1,355.48 Furnish and install storm sewer marker balls;complete 1-2404 as specified Each 0.00 7.00 7.00 $42.00 $294.00 Furnish and install storm sewer clay dams;complete 1-2406 as specified Each 0.00 1.00 1.00 $250.00 $250.00 Liquidated damages for tree damage;complete as Lump 1-2639 specified Sum 0.00 1.00 1.00 ($3,850.00) ($3,850.00) Furnish and install storm sewer bulkhead; complete as 1-2814 specified Each 0.00 1.00 1.00 $1,034.88 $1,034.88 Historic bridge repair concrete foundations; Lump 1-2815 complete as specified Sum 0.00 1.00 1.00 $14,355.60 $14,355.60 Historic bridge repair rip rap; Lump 1-2818 complete as specified Sum 0.00 1.00 1.00 $11,039.62 $11,039.62 Connect to existing storm sewer lateral;complete as 1-2852 specified Each 0.00 1.00 1.00 $361.21 $361.21 Furnish and install hydraulic structure(east lagoon secondary spillway); 1-2944B complete as specified Each 0.00 1.00 1.00 $2,875.00 $2,875.00 Liquidated damages for days past substantial completion; 1-2994 complete as specified Each 0.00 93.00 93.00 ($1,500.00) ($139,500.00) Complete work associated with installation of sheet pile cutoffs per engineers direction; complete as Square 1-2995 specified Feet 0.00 60.00 60.00 $31.50 $1,890.00 Furnish and install one package of fish cribs; Lump 1-2996 complete as specified Sum 0.00 1.00 1.00 $743.03 $743.03 Liquidated damages for erosion and sediment control infractions; complete as 1-2997 specified Each 0.00 15.00 15.00 ($200.00) ($3,000.00) Furnish and install 36"x 58" corrugated metal storm Linear 1-2998 sewer;complete as specified Feet 0.00 10.50 10.50 $928.67 $9,751.04, Furnish; install; maintain and remove 4'x 8'temporary project signs;complete as 1-2999 specified Each 0.00 4.00 4.00 $1,158.39 $4,633.56 Furnish and install sanitary sewer external manhole chimney seal; complete as 1-3114 specified Each 0.00 2.00 2.00 $768.22 $1,536.44 Furnish and install 6"ductile iron water main(relay)with polywrap;complete as Linear 1-4002 specified Feet 0.00 12.00 12.00 $152.49 $1,829.88 Page 8 of 12 CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Furnish and install new 6" ductile iron water main with polywrap;complete as Linear 1-4020 specified Feet 0.00 70.00 70.00 $152.49 $10,674.30 Furnish and install 1" corporation;complete as 1-4047 specified Each 0.00 2.00 2.00 $834.50 $1,669.00 Furnish and install 6"22.5 degree water main bend; 1-4227 complete as specified Each 0.00 2.00 2.00 $1,190.14 $2,380.28 Furnish and install 6"45 degree water main;complete 1-4236 as specified Each 0.00 3.00 3.00 $1,190.14 $3,570.42 Furnish and install 6"water main sleeve;complete as 1-4299 specified Each 0.00 2.00 2.00 $813.85 $1,627.70 Furnish and install 6"water main gate valve; complete as 1-4401 specified Each 0.00 3.00 3.00 $1,957.48 $5,872.44 Furnish and install fire hydrant; complete as 1-4500 specified Each 0.00 1.00 1.00 $8,781.88 $8,781.88 Furnish and install 16"water main casing pipe;complete Linear 1-4724 as specified Feet 0.00 18.00 18.00 $69.80 $1,256.40 Furnish and install one(1) concrete anchor wall per Lump 1-4997 plans;complete as specified Sum 0.00 1.00 1.00 $1,454.65 $1,454.65 Furnish and install two(2) gravity thrust blocks per Lump 1-4998 plans;complete as specified Sum 0.00 1.00 1.00 $1,905.99 $1,905.99 Furnish and install 16"x 6" locking water main tee; 1-4999 complete as specified Each 0.00 1.00 1.00 $3,580.76 $3,580.76 Furnish and install trees; move tree;complete as 1-2-2626 specified Each 0.00 1.00 1.00 $612.15 $612.15 Remove existing tree; 1-2-2907 complete as specified Each 0.00 1.00 1.00 $290.55 $290.55 Furnish and install sanitary 1-2-3236 sewer lateral marker balls; Each 0.00 1.00 1.00 $42.00 $42.00 Furnish and install Type 2 1-2-5502 Base; complete as specified Each 0.00 2.00 2.00 $891.25 $1,782.50 ADDITIONAL WORK REQUIRED: (BID ITEMS 1-1200-1-2-5502)-SUBTOTAL: ($16,911.55) $0.00 NET DECREASE: ($16,911.55) SECTION II:ALTERNATIVE ITEM CONTRACT ' INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICF Furnish and install sign 2-1023 posts;complete as specified Each 8.00 10.00 2.00 $357.08 $714.16 Relocate existing signs; 2-1024 complete as specified Each 2.00 0.00 -2.00 $76.52 ($153.04) Removing pavement; Square 2-1100 complete as specified Yards 2,640.00 2,402.00 -238.00 $1.63 ($387.94) Removing concrete and asphalt sidewalk and driveway; complete as Square 2-1120 specified Feet 2,025.00 1,840.00 I -185.00 $1.03 ($190.55) Page 9 of 12 • CONTRACT 17-07 CHANGE ORDER#1 (FINAL) • ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Common excavation; Lump 2-1201 complete as specified Sum 1.00 1.00 $18,639.25 Excavation below subgrade; Cubic 2-1203 complete as specified Yards 800.00 705.85 -94.15 $13.44 ($1,265.38) Adjust manholes and inlets; 2-1360 complete as specified Each 5.00 5.00 $223.46 30"curb and gutter;with 12" curb head;8";with 6"CABC and grading;complete as Linear 2-1445 specified Feet 1,320.00 1,220.30 -99.70 $19.00 ($1,894.30) 36"mountable curb and gutter;8";with 6"CABC and grading; complete as Linear 2-1450 specified Feet 100.00 101.50 1.50 $22.80 $34.20 4"concrete sidewalk with 3" CABC and grading;complete Square 2-1500 as specified Feet 595.00 696.20 101.20 $6.30 $637.56 4"concrete sidewalk with false curb; 3"CABC; and grading; complete as Square 2-1506 specified Feet 115.00 0.00 -115.00 $8.74 ($1,005.10) 6"concrete sidewalk/ driveway/ramp with 3"CABC and grading;complete as Square 2-1510 specified Feet 2,035.00 1,746.20 -288.80 $6.57 ($1,897.42) 6"concrete sidewalk/ driveway/ramp with false curb; 3"CABC;and grading; Square 2-1516 complete as specified Feet 615.00 552.60 -62.40 $9.84 ($614.02) Curb ramp detectable warning field (natural/non- painted);complete as Square 2-1540 specified Feet 108.00 108.00 $32.58 Sawing existing pavement; Linear 2-1700 complete as specified Feet 335.00 350.00 15.00 $2.50 $37.50 Base aggregate dense; 1- 2-1801 1/4";complete as specified Tons 1,760.00 1,552.87 -207.13 $9.83 ($2,036.09) Tack coat; complete as 2-1900 specified Gallons 220.00 100.00 -120.00 $4.22 ($506.40) 4"asphaltic pavement with 10"CABC and grading; Square 2-1906 complete as specified Yards 2,970.00 2,620.95 -349.05 $18.26 ($6,373.65) 4"asphaltic surface with 6" CABC and grading; complete Square 2-1916 as specified Yards 17.00 19.40 2.40 $51.72 $124.13 Collapsible bollard; complete 2-1920 as specified Each 7.00 7.00 $382.59 Parking; handicap; and crosswalk expoxy striping; Lump 2-1921 complete as specified Sum 1.00 1.00 $5,884.42 Furnish and install 12"storm Linear 2-2003 sewer;complete as specified Feet 510.00 499.80 -10.20 $33.31 ($339.76) Furnish and install standard storm sewer inlet manhole(4' diameter); complete as Vertical 2-2213 specified Feet 10.60 10.67 0.07 $592.42 $41.47 Furnish and install Type 3 2-2238 inlet; complete as specified Each 1.00 1.00 $1,495.16 Furnish; install; maintain; and remove Type D modified inlet protection; complete as 2-2508 specified Each 11.00 10.00 -1.00 $112.23 ($112.23) Page 10 of 12 • CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Sediment removal-Type D modified inlet protection; 2-2510 complete as specified Each 11.00 0.00 -11.00 $25.51 ($280.61) Furnish;install; maintain;and remove stone tracking pad; 2-2512 complete as specified Each 1.00 1.00 $1,538.80 Furnish;install; maintain; and remove silt fence;complete Linear 2-2514 as specified Feet 770.00 741.50 -28.50 $1.99 ($56.71) Furnish;install; maintain:and remove stone bag;complete 2-2516 as specified Each 45.00 44.00 -1.00 $8.16 ($8.16) Furnish; install; maintain; and remove 20"diamter sediment Linear 2-2520 logs;complete as specified Feet 215.00 189.00 -26.00 $9.18 ($238.68) Install salvaged topsoil 6" Square 2-2602 depth; complete as specified Yards 1,210.00 1,672.37 462.37 $1.84 $850.76 Furnish and install native seeding; complete as Square 2-2610 specified Yards 1,210.00 1,633.90 423.90 $0.46 $194.99 Furnish and install annual cover crop;complete as Square 2-2624 specified Yards 1,210.00 1,633.90 423.90 $0.18 $76.30 Furnish and install hardwood Square 2-2625 mulch;complete as specified Yards 45.00 45.00 $17.34 Furnish and install trees; 2-2626 complete as specified Each 6.00 6.00 $612.15 Furnish and install hydraulically-applied erosion control product; complete as Square 2-2644 specified Yards 1,210.00 1,633.90 423.90 $0.31 $131.41 Remove 30"and smaller storm sewer;complete as Linear 2-2804 specified Feet 32.00 27.50 -4.50 $18.06 ($81.27) Connect to existing storm sewer manhole; complete as 2-2856 specified Each 1.00 1.00 $361.24 Mobilization;complete as Lump 2-2900 specified Sum 1.00 1.00 $2,106.38 Strip and stockpile topsoil; Square 2-2902 complete as specified Yards 1,905.00 1,401.00 -504.00 $1.37 ($690.48) Clear trees;complete as Lump 2-2906 specified Sum 1.00 1.00 $763.14 Grub stumps;complete as Lump 2-2912 specified Sum 1.00 1.00 $510.12 Furnish; install; maintain; and remove HDPE safety fencing; Linear 2-2956 complete as specified Feet 905.00 858.40 -46.60 $3.06 ($142.60) Furnish and install pull box (steel);24"x 36";complete 2-5016 as specified Each 1.00 2.00 1.00 $714.17 $714.17 Furnish and install 1" Schedule 40 PVC;complete Linear 2-5100 as specified Feet 550.00 641.00 91.00 $4.08 $371.28 Furnish and install 2" Schedule 40 PVC;complete Linear 2-5120 as specified Feet 200.00 187.00 -13.00 $5.10 ($66.30) Furnish and install 3" Schedule 40 PVC;complete Linear 2-5130 as specified Feet 500.00 454.00 -46.00 $6.12 ($281.52) Page 11 of 12 CONTRACT 17-07 CHANGE ORDER#1 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE PRICE Install single head fixture; "City Supplied"; complete as 2-5400 specified Each 2.00 0.00 -2.00 $663.16 ($1,326.32) Furnish and install Type 5 2-5504 Base;complete as specified Each 2.00 0.00 -2.00 $688.67 ($1,377.34) SECTION II ALTERNATIVE: (BID ITEMS 2-1023-2-5504)-SUBTOTAL: $3,927.93 ($21,325.87) NET DECREASE : ($17,397.94) NET DECREASE TO SECTION I ($97,552.35) NET DECREASE TO SECTION II ALTERNATIVE ($17,397.94) NET DECREASE TO CONTRACT: ($114,950.29) Page 12 of 12