HomeMy WebLinkAboutMiron Construction Co C/O#2 17-03 13 5
e b, RECEIVED
JAN 1 7 2019
City f CITY CLERK'S OFFICE
Oshkosh
January 16, 2019
Ms. Jessica Mayer
Miron Construction Co.
PO Box 509
Neenah, WI 54957-0509
RE: Change Order No. 2 (Final)
Contract 17-03
Dear Ms. Mayer:
Enclosed is an executed copy of Change Order No. 2 (Final) between the City of Oshkosh and
Miron Construction Co. regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
S. cerely,
ea)111f
es Rabe, P.E., CPESC V --
Director of Public Works
JER/tlt
Enclosure: Change Order No. 2 (Final)
cc: Pam Ubrig, City Clerk (w/original)
Jennifer Messerschmidt, Assistant Finance Director (w/copy)
Paul Timm, AECOM (w/copy)
File (w/original)
1:\Engineering\2017 CONTRACTS\17-03Oshkosh Ave Swr\Project_Information\Contract Info\Change Page 1 of 1
Orders\17-03 Executed CO t2(Final)Ltr_1-16-19.docx
City Hall,215 Church Avenue P.O.Box 1 130 Oshkosh,WI 54903-1 130 http://www.ci.oshkosh.wi.us
TO: MIRON CONSTRUCTION CHANGE ORDER#2 (FINAL)
1471 MCMAHON DRIVE DATE: DECEMBER 3, 2018
NEENAH, WI 54956
Your present contract with the City of Oshkosh, Contract No. 17-03, awarded October 24, 2017, is hereby
amended and changed as follows:
NET INCREASE: $46,056.63
NET DECREASE: ($32,298.53)
NET INCREASE TO CONTRACT $13,758.10
BID TOTAL $2,981,403.60 $2,981,403.60
CO#1 $112,427.00 $112,427.00
PREVIOUS CONTRACT TOTAL $3,093,830.60 $3,093,830.60
CO#2 $13,758.10 $13,758.10
CONTRACT TOTAL $3,107,588.70 $3,107,588.70'
CITY OF OSHKOSH
BY:
(1. City Man
City Clerk •
A/D1 '/ .
oved and acc t :
Contractor
David G.Voss Jr.,President
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as t rm:
/1ti
City Attor
CONTRACT 17-03 CHANGE ORDER#2(FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Removing pavement; Square
1100 complete as specified Yards 300.00 300.00 $2.36
7"concrete pavement;with
5"CABC and grading; Square
1301 complete as specified Yards 550.00 482.00 -68.00 $72.32 ($4,917.76)
Sawing existing pavement; Linear
1700 complete as specified Feet 250.00 30.00 -220.00 $3.15 ($693.00)
2"asphaltic surface LT with
6"CABC and grading; Square
1917 complete as specified Yards 400.00 400.00 $24.94
Furnish and install 12"storm Linear
2003 sewer;complete as specified Feet 70.00 87.00 17.00 $78.75 $1,338.75
Furnish and install Type 1
inlet(with 18"sump);
2235 complete as specified Each 1.00 1.00 $2,415.00
Furnish;install;maintain;and
remove Type D modified inlet
protection;complete as
2508 specified Each 10.00 10.00 $152.25
Sediment removal-Type D
modified inlet protection;
2510 complete as specified Each 10.00 1.00 -9.00 $52.50 ($472.50)
Furnish;install;maintain;and
remove stone tracking pad:
2512 complete as specified Each 1.00 1.00 $3,307.50
Furnish;install;maintain;and
remove silt fence;complete Linear
2514 as specified Feet 900.00 699.00 -201.00 $3.68 ($739.68)
Install salvaged topsoil 6" Square
2602 depth;complete as specified Yards 2,400.00 1,623.00 -777.00 $4.78 ($3,714.06)
Furnish and install native
seeding;complete as Square
2610 specified Yards 2,100.00 1,264.00 -836.00 $2.36 ($1,972.96)
Furnish and install annual
cover crop;complete as Square
2624 specified Yards 2,400.00 1,564.00 -836.00 $0.42 ($351.12)
Furnish and install Moist
Meadow-Rain Garden Square
2625 Seed;complete as specified Yards 300.00 300.00 $2.36
Furnish and install grass
pavers;complete as Square
2629 specified Feet 2,200.00 2,018.00 -182.00 $14.28 ($2,598.96)
Furnish and install
hydraulically-applied erosion
control product;complete as Square
2644 specified Yards 2,400.00 1,564.00 -836.00 $0.68 ($568.48)
Connect to existing storm
sewer manhole;complete as
2856 specified Each 1.00 1.00 $1,470.00
Strip and stockpile topsoil; Square
2902 complete as specified Yards 3,085.00 2,717.20 -367.80 $4.36 ($1,603.61)
Furnish and install 8"sanitary
sewer(new);complete as Linear
3030 specified Feet 15.00 7.00 -8.00 $262.50 ($2,100.00)
Furnish and install 8"sanitary
sewer;DIP with tracer wire
and include 3-45 degree
mega lug connections;and
all mega lug connections as
needed from 10'from the
building to 8"HDPE; Linear
3031 complete as specified Feet 140.00 131.00 -9.00 $102.90 ($926.10)
Page 1 of 4
• CONTRACT 17-03 CHANGE ORDER*2(FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 12"
sanitary sewer(new); Linear
3034 complete as specified Feet 220.00 194.25 -25.75 $336.00 ($8,652.00)
Furnish and install 8"sanitary
sewer drop;complete as Vertical
3060 specified Feet 10.00 12.00 2.00 $136.50 $273.00
Furnish and install standard
sanitary sewer manhole(4'
diameter);complete as Vertical
3100 specified Feet 75.00 76.00 1.00 $630.00 $630.00
Furnish and install external
sanitary sewer manhole
chimney seal;complete as
3114 specified Each 4.00 4.00 $420.00
Furnish and install 12"x 4"
sanitary sewer factory wyes
or tees;complete as
3204 specified Each 1.00 1.00 $525.00
Furnish and install 4"sanitary
sewer riser(new);complete Linear
3231 as specified Feet 6.00 6.00 $52.50
Furnish and install sanitary
sewer lateral marker balls;
3236 complete as specified Each 8.00 6.00 -2.00 $52.50 ($105.00)
Core into existing manhole;
3332 complete as specified Each 1.00 1.00 $1,575.00
Furnish and construct lift
station and park shelter
facility;complete as
specified;including"A"items
from Major Equipment
Schedule(inclusive of:sign
relocation;temporary site
safety fence;oak tree
removal;abandonment of
two(2)groundwater
monitoring wells;foundation
excavation;backfilling;
structure;adjoining concrete
slabs and approaches;site
landscaping bushes;and
mulch;all electrical(including
pull box
on extra conduit and
transformer pad);
mechanical;HVAC;and
control features and
equipment;all building
internal/external connections
to water;sanitary;(extended
10'from the building for
influent and force main);gas;
and including conduit/wiring
from transformer.Include site
dewatering and storm water
management;mobilization/
demobilization;bonds;
insurance;and all incidental Lump
3998 costs);complete as specified Sum 1.00 1.00 $2,647,025.00
Page 2 of 4
CONTRACT 17-03 CHANGE ORDER#2(FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Furnish and install 8"sanitary
sewer force main(new)
HDPE;SDR 19 with tracer
wire;pipe insulation;and
inside drop including all
supplies;labor;and materials
in MH-W-21 (SE-property); Linear
3999 complete as specified Feet 440.00 437.00 -3.00 $91.35 ($274.05)
Furnish and install 2"water
service(new);complete as Linear
4046 specified Feet 180.00 145.00 -35.00 $74.55 ($2,609.25)
Furnish and install 2"
corporation and stop box;
4053 complete as specified Each 1.00 1.00 $1,417.50
BID ITEMS(1100-4053)-SUBTOTAL 52,241.75 ($32,298.53)
NET DECREASE: (530,056.78)
ADDITIONAL WORK REQUIRED: CO#1
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE . PRICE CONTRACT PRICE CONTRACT PRICE.,
1001 -Revise roof dormers; Lump
10001 complete as specified Sum 1.00 1.00 $19,509.00
1002-Replace split face
CMU with stone veneer; Lump
10002 complete as specified Sum 1.00 1.00 $25,368.00
1003-Increase height of
stone veneer;complete as Lump
10003 specified Sum 1.00 1.00 $28,994.00
1004-Add stone veneer and
sill to wood posts;complete Lump
10004 as specified Sum 1.00 1.00 $22,781.00
1005-Revised roof trusses
to lower roof;complete as Lump
10005 specified Sum 1.00 1.00 $13,312.00
1006-Replace cement
board siding on gabled
building ends;complete as Lump
10006 specified Sum 1.00 1.00 $2,463.00
ADDITIONAL WORK REQUIRED:CO#1 (ITEMS 10001 -10006)-SUBTOTAL $0.00 $0.00
NET INCREASE CO#1: $0.00
ADDITIONAL WORK REQUIRED:CO#2
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
Frost protection;complete as Lump
20001 specified Sum 0.00 1.00 1.00 $3,675.00 $3,675.00
F05-Wood coating for
exposed timbers and wood
trusses;complete as Lump
30001 specified Sum 0.00 1.00 1.00 $2,730.00 $2,730.00
F06-Gate relocation; Lump
30002 complete as specified Sum 0.00 1.00 1.00 $6,818.11 $6,818.11
F07-Accelerate schedule; Lump
30003 complete as specified Sum 0.00 1.00 1.00 $20,900.00 $20,900.00
F08-CB 1 changes; Lump
30004 complete as specified Sum 0.00 1.00 1.00 ($319.65)4 ($319.65)
F09-Soffit material change; Lump
30005 complete as specified Sum 0.00 1.00 1.00 $3,612.00 $3,612.00
F010-Paving;trusses and Lump
30006 jamb;complete as specified Sum 0.00 1.00 1.00 ($3,845.00) ($3,845.00)
Page 3of4
CONTRACT 17-03 CHANGE ORDER#2(FINAL)
ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE
FO11 -WWTP doors;
hardware;complete as Lump
30007 specified Sum 0.00 1.00 1.00 $1,376.38 $1,376.38
F012-Electrical strikes and
light fixtures;complete as Lump
30008 specified Sum 0.00 1.00 1.00 $6,115.72 $6,115.72
F013-Interface cards; Lump
30009 complete as specified Sum 0.00 1.00 1.00 $2,752.32 $2,752.32
Final contract discussions;
30010 complete as specified Days 0.00 0.00 ($1,500.00)
ADDITIONAL WORK REQUIRED: CO#2(ITEMS 20001 -30010)-SUBTOTAL $43,814.88 $0.00
NET INCREASE CO#2: $43,814.88
NET INCREASE: $46,056.63
NET DECREASE: ($32,298.53)
NET INCREASE TO CONTRACT: S13,758.10
Page 4 of 4