Loading...
HomeMy WebLinkAboutChange Order 17-05 Dorner City of W Oshkosh January 4, 2019 Todd Dorner Dorner, Inc. PO Box 129 Luxemburg, WI 54217 RE: Change Order No. 1 (Final) Contract 17-05 Dear Todd: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Dorner, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, eaL6e—'(Th-j- ames Rabe, P.E., CPESC Director of Public Works RF7. JAN 0 7 2019 JERAlt CITY C" r . ' OFFICE Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Jennifer Messerschmidt, Assistant Finance Director (w/copy) File (w/original) I:\Engineering\2017CONTRACTS\17-052ndPaving\Project_Information\Contractlnfo\Change Orders\17- Page I of 1 05 Executed CO$1(Final)Ltr_1-419.docx City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1130 http://www.ci.oshkosh.wi.us TO: DORNER, INC. CHANGE ORDER#1 (FINAL) PO BOX 129 DATE: DECEMBER 7,2018 LUXEMBURG,WI 54217 Your present contract with the City of Oshkosh,Contract No. 17-05, awarded March 28, 2017, is hereby amended amended and changed as follows: NET DECREASE TO SECTION I: ($579,541.42) NET INCREASE TO SECTION I: $452,668.83 NET DECREASE TO CONTRACT ($126,872.59) SECTION I TOTALS BID TOTAL $6,270,243.32 $6,270,243.32 CO#1 ($126,872.59) ($126,872.59) CONTRACT TOTAL $6,143,370.73 $6,143,370.73 CITY OF OSHKOSH BY: ''''''••••—oa ----7��-l�6.,.f City Man ger \.6...2 City Clerk ,� oved an a epted: 1L0/ on tractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Change Order. iRc . k,Ej-\_-\ Comptroll r Approved as form: Q_ City Atto CONTRACT 17-05 CHANGE ORDER#1 (FINAL) 17-05 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Clearing;complete as Inch 1011 specified Diameter 30.00 42.00 12.00 $20.39 $244.68 Grubbing;complete as Inch 1021 specified Diameter 30.00 42.00 12.00 $12.24 $146.88 Removing pavement; Square 1100 complete as specified Yards 19,500.00 19,723.20 223.20 $2.45 $546.84 Removing railroad rails; Linear 1101 complete as specified Feet 1,600.00 825.00 -775.00 $3.06 ($2,371.50) Removing railroad ties; 1102 complete as specified Tons 50.00 22.81 -27.19 $30.59 ($831.74) Hauling removed concrete pavement;complete as Square 1103A specified Yards 8,640.00 9,615.40 975.40 $0.01 $9.75 Hauling removed concrete pavement;complete as Square 1103E specified Yards 8,000.00 10,107.80 2107.80 $0.51 $1,074.98 Stripping topsoil and providing gravel lay down Lump 1104 area;complete as specified Sum 1.00 1.00 $45,887.00 Removing concrete and asphalt sidewalk and driveway;complete as Square 1120 specified Feet 72,450.00 76,969.80 4519.80 $0.41 $1,853.12 Unclassified excavation; Cubic 1200 complete as specified Yards 6,670.00 6,477.50 -192.50 $12.95 ($2,492.88) Excavation special(paving); 1220 complete as specified Tons 850.00 0.00 -850.00 $20.39 ($17,331.50) 7"concrete pavement;with 5"CABC and grading; Square 1301 complete as specified Yards 5,665.00 5,725.50 60.50 $36.27 $2,194.34 8"concrete pavement;with 6"CABC and grading; Square 1311 complete as specified Yards 9,870.00 10,013.90 143.90 $38.74 $5,574.69 8"concrete pavement HES; with 6"CABC and grading; Square 1313 complete as specified Yards 2,115.00 2,328.00 213.00 $42.31 $9,012.03 8"concrete pavement doweled;with 6"CABC and grading;complete as Square 1314A specified Yards 4,020.00 0.00 -4,020.00 $41.70 ($167,634.00) 8"concrete pavement doweled;HES;with 6"CABC and grading;complete as Square 1315 specified Yards 750.00 4,745.50 3995.50 $45.06 $180,037.23 Concrete pavement gaps; 1334 complete as specified Each 4.00 3.00 -1.00 $1,020.00 ($1,020.00) Crushed aggregate base course;complete as 1340 specified Tons 4,200.00 132.83 -4,067.17 $12.03 ($48,928.06) Pavement ties;complete as 1350 specified Each 85.00 166.00 81.00 $7.14 $578.34 Drilled dowel bars; 1"; 1352 complete as specified Each 100.00 44.00 -56.00 $10.20 ($571.20) Page 1 of 15 CONTRACT 17-05 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE No.4 reinforcing rods- deformed,epoxy-coated; Linear 1550 complete as specified Feet 5,300.00 5,880.00 580.00 $1.22 $707.60 Drilled No.4 sidewalk tie bars -deformed,epoxy-coated; 1560 complete as specified Each 390.00 267.00 -123.00 $3.57 ($439.11) Furnish and install tree; 1600 complete as specified Each 2.00 0.00 -2.00 $407.88 ($815.76) Locate existing property monuments;complete as 1650 specified Each 55.00 65.00 10.00 $152.96 $1,529.60 Replace existing property monuments;complete as 1652 specified Each 33.00 24.00 -9.00 $50.99 ($458.91) Sawing existing pavement; Linear 1700 complete as specified Feet 1,760.00 1,979.20 219.20 $1.84 $403.33 Sawing concrete pavement full depth;complete as Linear 1710 specified Feet 745.00 1,074.00 329.00 $2.24 $736.96 Tack coat;complete as 1900 specified Gallons 155.00 28.00 -127.00 $5.06 ($642.62) 5"asphaltic pavement MT with 10"CABC and grading; Square 1905 complete as specified Yards 540.00 527.40 -12.60 $39.77 ($501.10) 5"asphaltic transition MT with 10"CABC and grading; Square 1910 complete as specified Yards 215.00 283.50 68.50 $40.93 $2,803.71 4"asphaltic transition LT with 10"CABC and grading; Square 1911 complete as specified Yards 85.00 97.90 12.90 $37.38 $482.20 5"asphaltic surface MT with 6"CABC and grading; Square 1915 complete as specified Yards 1,240.00 1,110.10 -129.90 $34.37 ($4,464.66) 4"asphaltic surface LT with 6"CABC and grading; Square 1916 complete as specified Yards 135.00 231.50 96.50 $36.41 $3,513.57 2"asphaltic surface LT with 6"CABC and grading; Square 1917 complete as specified Yards 250.00 123.70 -126.30 $28.20 ($3,561.66) Asphaltic cold weather Square 1918 paving;complete as specified Yards 215.00 0.00 -215.00 $38.71 ($8,322.65) Furnish and install 10"storm Linear 2002 sewer;complete as specified Feet 160.00 215.00 55.00 $50.00 $2,750.00 Furnish and install 12"storm Linear 2003 sewer;complete as specified Feet 1,385.00 1,300.70 -84.30 $50.00 ($4,215.00) Furnish and install 18"storm Linear 2009 sewer;complete as specified Feet 925.00 908.70 -16.30 $64.00 ($1,043.20) Furnish and install 21"storm Linear 2012 sewer;complete as specified Feet 330.00 323.30 -6.70 $64.00 ($428.80) Furnish and install 24"storm Linear 2015 sewer;complete as specified Feet 1,130.00 1,342.30 212.30 $72.00 $15,285.60 Furnish and install 30"storm Linear 2021 sewer;complete as specified Feet 390.00 84.60 -305.40 $99.00 ($30,234.60) Furnish and install 36"storm Linear 2024 sewer;complete as specified Feet 60.00 0.00 -60.00 $104.00 ($6,240.00) Page 3 of 15 CONTRACT 17-05 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 54"storm sewer casing pipe by trenchless methods; Linear 2361 complete as specified Feet 80.00 0.00 -80.00 $750.00 ($60,000.00) Furnish and install 6"storm sewer lateral;complete as Linear 2400 specified Feet 1,680.00 1,748.50 68.50 $46.00 $3,151.00 Fumish and install 8"storm sewer lateral;complete as Linear 2402 specified Feet 230.00 53.50 -176.50 $51.00 ($9,001.50) Furnish and install storm sewer marker balls;complete 2404 as specified Each 135.00 135.00 $25.00 Furnish and install storm sewer clay dams;complete 2406 as specified Each 71.00 61.00 -10.00 $100.00 ($1,000.00) Furnish and install storm sewer lateral inlet;complete 2408 as specified Each 43.00 35.00 -8.00 $475.00 ($3,800.00) Storm lateral inlet adjustments;complete as 2414 specified Each 12.00 0.00 -12.00 $200.00 ($2,400.00) Fumish;install;maintain;and remove Type D modified inlet protection;complete as 2508 specified Each 155.00 140.00 -15.00 $71.00 ($1,065.00) Sediment removal-Type D modified inlet protection; 2510 complete as specified Each 155.00 24.00 -131.00 $5.00 ($655.00) Furnish;install; maintain;and remove stone tracking pad; 2512 complete as specified Each 1.00 1.00 $1,275.00 Furnish;install;maintain;and remove silt fence;complete Linear 2514 as specified Feet 500.00 0.00 -500.00 $2.55 ($1,275.00) Furnish;install;maintain;and remove stone bag;complete 2516 as specified Each 25.00 34.00 9.00 $5.00 $45.00 Furnish;install;maintain;and remove 12"diameter sediment logs;complete as Linear 2518 specified Feet 50.00 50.00 $5.00 Rock excavation;complete Cubic 2750 as specified Yards 50.00 0.00 -50.00 $0.01 ($0.50) Abandon 8"-12"storm Linear 2800 sewer;complete as specified Feet 1,375.00 1,583.00 208.00 $7.00 $1,456.00 Abandon 15"and larger storm sewer;complete as Linear 2802 specified Feet 1,240.00 1,384.00 144.00 $15.00 $2,160.00 Remove 30"and smaller storm sewer;complete as Linear 2804 specified Feet 500.00 545.00 45.00 $15.00 $675.00 Remove 33"-60"storm Linear 2806 sewer;complete as specified Feet 40.00 100.00 60.00 $20.00 $1,200.00 Abandon storm sewer manholes and inlets; 2810 complete as specified Each 8.00 14.00 6.00 $400.00 $2,400.00 Page 5 of 15 CONTRACT 17-05 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install internal sanitary sewer manhole chimney seal extension; 3120 complete as specified Each 3.00 0.00 -3.00 $300.00 ($900.00) Rebuild sanitary sewer manhole(4'diameter); Vertical 3136 complete as specified Feet 20.00 5.20 -14.80 $400.00 ($5,920.00) Furnish and install 8"x 6" sanitary sewer factory wyes or tees;complete as 3210 specified Each 35.00 34.00 -1.00 $77.00 ($77.00) Furnish and install 10"x 6" sanitary sewer factory wyes or tees;complete as 3212 specified Each 7.00 6.00 -1.00 $162.00 ($162.00) Furnish and install 12"x 6" sanitary sewer factory wyes or tees;complete as 3214 specified Each 28.00 15.00 -13.00 $152.00 ($1,976.00) Furnish and install 6"sanitary sewer"Insert-A-Tee"or"Kor- N-Tee";complete as 3222 specified Each 9.00 18.00 9.00 $190.00 $1,710.00 Furnish and install 4"/6" sanitary sewer lateral(relay); Linear 3234 complete as specified Feet 2,561.00 2,349.00 -212.00 $80.00 ($16,960.00) Furnish and install 4"/6" sanitary sewer riser(relay); Linear 3235 complete as specified Feet 98.00 33.00 -65.00 $95.00 ($6,175.00) Furnish and install sanitary sewer lateral marker balls; 3236 complete as specified Each 148.00 151.00 3.00 $25.00 $75.00 Furnish and install clay 3238 dams;complete as specified Each 75.00 73.00 -2.00 $100.00 ($200.00) Furnish and install connection to existing 8" 3300 mains;complete as specified Each 3.00 2.00 -1.00 $500.00 ($500.00) Furnish and install connection to existing 10" 3302 mains;complete as specified Each 3.00 3.00 $600.00 Furnish and install connection to existing 12" 3304 mains;complete as specified Each 4.00 5.00 1.00 $700.00 $700.00 Furnish and install connection to existing 18" sanitary sewer mains; 3308 complete as specified Each 2.00 2.00 $1,440.00 Furnish and install connection to existing 24" sanitary sewer mains; 3312 complete as specified Each 3.00 1.00 -2.00 $3,530.00 ($7,060.00) Furnish and install 10" sanitary sewer open cut casing pipes;complete as Linear 3404 specified Feet 160.00 236.00 76.00 $125.00 $9,500.00 Furnish and install 16" sanitary sewer open cut casing pipes;complete as Linear 3408 specified Feet 20.00 14.00 -6.00 $160.00 ($960.00) Page 7 of 15 CONTRACT 17-05 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 16"ductile iron water main(relay)with polywrap;complete as Linear 4010 specified Feet 295.00 277.00 -18.00 $129.00 ($2,322.00) Furnish and install 1"water service(relay);complete as Linear 4036 specified Feet 1,987.00 1,621.50 -365.50 $53.00 ($19,371.50) Furnish and install 1-1/4" water service(relay); Linear 4037 complete as specified Feet 281.00 380.00 99.00 $55.00 $5,445.00 Furnish and install 1-1/2" water service(relay); Linear 4038 complete as specified Feet 96.00 193.00 97.00 $57.00 $5,529.00 Furnish and install 2"water service(new);complete as Linear 4046 specified Feet 240.00 116.00 -124.00 $61.00 ($7,564.00) Furnish and install 1" corporation and stop box; 4048 complete as specified Each 59.00 51.00 -8.00 $580.00 ($4,640.00) Furnish and install 1-1/4" corporation and stop box; 4050 complete as specified Each 7.00 10.00 3.00 $950.00 $2,850.00 Furnish and install 1-1/2" corporation and stop box; 4051 complete as specified Each 3.00 4.00 1.00 $1,000.00 $1,000.00 Furnish and install 2" corporation and stop box; 4053 complete as specified Each 5.00 3.00 -2.00 $1,300.00 ($2,600.00) Furnish and install water service clay dams;complete 4055 as specified Each 70.00 66.00 -4.00 $100.00 ($400.00) Furnish and install connections to existing 4" water main;complete as 4056 specified Each 2.00 5.00 3.00 $1,500.00 $4,500.00 Furnish and install connections to existing 6" water main;complete as 4058 specified Each 4.00 1.00 -3.00 $1,575.00 ($4,725.00) Furnish and install connections to existing 8" water main;complete as 4060 specified Each 12.00 9.00 -3.00 $1,600.00 ($4,800.00) Furnish and install connections to existing 10" water main;complete as 4062 specified Each 6.00 5.00 -1.00 $2,000.00 ($2,000.00) Furnish and install connections to existing 16" water main;complete as 4066 specified Each 3.00 3.00 $3,000.00 Furnish and install 8"x 6" water main tee;complete as 4110 specified Each 4.00 3.00 -1.00 $452.00 ($452.00) Furnish and install 8"x 8" water main tee;complete as 4111 specified Each 5.00 4.00 -1.00 $460.00 ($460.00) Furnish and install 10"x 4" water main tee;complete as 4118 specified Each 1.00 0.00 -1.00 $557.00 ($557.00) Page 9 of 15 CONTRACT 17-05 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install 6"water main gate valve;complete as 4401 specified Each 16.00 14.00 -2.00 $1,000.00 ($2,000.00) Furnish and install 8"water main gate valve;complete as 4402 specified Each 24.00 15.00 -9.00 $1,367.00 ($12,303.00) Furnish and install 10"water main gate valve;complete as 4403 specified Each 14.00 13.00 -1.00 $1,848.00 ($1,848.00) Furnish and install 16"water main gate valve;complete as 4405 specified Each 2.00 2.00 $7,000.00 Furnish and install 16"x 10" tapping valve and sleeve; 4457 complete as specified Each 1.00 1.00 $6,200.00 Furnish and install hydrant; 4500 complete as specified Each 14.00 12.00 -2.00 $3,350.00 ($6,700.00) Jack and bore 24"steel water main casing pipe;complete Linear 4702 as specified Feet 80.00 0.00 -80.00 $500.00 ($40,000.00) Furnish and install 2"water main casing pipe;complete Linear 4712 as specified Feet 70.00 0.00 -70.00 $50.00 ($3,500.00) Furnish and install 4"water main casing pipe;complete Linear 4714 as specified Feet 100.00 120.00 20.00 $75.00 $1,500.00 Furnish and install 8"water main casing pipe;complete Linear 4718 as specified Feet 25.00 30.00 5.00 $100.00 $500.00 Furnish and install 16"water main casing pipe;complete Linear 4724 as specified Feet 65.00 42.00 -23.00 $150.00 ($3,450.00) Furnish and install 20"water main casing pipe;complete Linear 4728 as specified Feet 30.00 14.00 -16.00 $170.00 ($2,720.00) Furnish and install 24"water main casing pipe;complete Linear 4730 as specified Feet 50.00 50.00 $175.00 Fumish and install 30"water main casing pipe;complete Linear 4732 as specified Feet 25.00 15.00 -10.00 $275.00 ($2,750.00) Rock excavation;complete Cubic 4800 as specified Yards 25.00 0.00 -25.00 $0.01 ($0.25) Abandon water main on Dickinson Avenue;complete Lump 4900 as specified Sum 1.00 1.00 $2,600.00 Abandon water main on Maricopa Drive;complete as Lump 4902 specified Sum 1.00 1.00 $5,500.00 Abandon water main on East Murdock Avenue;complete Lump 4904 as specified Sum 1.00 1.00 $4,500.00 Abandon water main on New York Avenue;complete as Lump 4906 specified Sum 1.00 1.00 $3,500.00 Remove water main; Linear 4920 complete as specified Feet 675.00 250.00 -425.00 $37.00 ($15,725.00) Page 11 of 15 CONTRACT 17-05 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Furnish and install Type 2 5502B Base;complete as specified Each 7.00 8.00 1.00 $790.00 $790.00 Furnish and install pull box (steel);24"x 42";complete 5018C as specified Each 4.00 4.00 $663.00 Adjust pull box;complete as 5025C specified Each 4.00 0.00 -4.00 $127.00 ($508.00) Furnish and install 2" Schedule 40 PVC;complete Linear 5120C as specified Feet 40.00 64.00 24.00 $5.10 $122.40 Furnish and install pulling Linear 5299C twine;complete as specified Feet 40.00 0.00 -40.00 $2.04 ($81.60) Furnish and install Type 2 5502C Base;complete as specified Each 7.00 7.00 $790.00 SECTION I(BID ITEMS 1011 -5502C)-SUBTOTAL: $433,204.10 ($1,012,745.52) NET DECREASE TO SECTION: ($579,541.42) ADDITIONAL WORK REQUIRED:CO#1 ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE TM 5-11 Foundation wall removal on New York; Lump 1-10000 complete as specified Sum 0.00 1.00 1.00 $2,478.00 $2,478.00 Extra time and materials to install 4"HES concrete; Square 1-10001 complete as specified Feet 0.00 666.70 666.70 $0.20 $133.34 CO-13 Extra cost to heat the concrete for sidewalks and driveways;complete as Cubic 1-10002 specified Yard 0.00 225.50 225.50 $8.95 $2,018.23 CO-13 Extra time and material to single layer cover sidewalk and driveways; Square 1-10003 complete as specified Feet 0.00 3,028.50 3028.50 $0.55 $1,665.68 CO-13 Extra time and material to double layer cover sidewalk and driveways; Square 1-10004 complete as specified Feet 0.00 3,911.70 3911.70 $1.10 $4,302.87 CO-9 Extra cost to heat the concrete for East Murdock Avenue Paving;complete as Cubic 1-10005 specified Yard 0.00 1,535.00 1535.00 $3.45 $5,295.75 CO-9 Extra time and material to single layer cover the concrete for East Murdock Avenue Paving;complete as Square 1-10006 specified Yard 0.00 6,028.30 6028.30 $1.75 $10,549.53 Extra time and materials to install 18"HES curb and gutter on East Murdock Avenue;complete as Linear 1-10007 specified Feet 0.00 2,072.00 2072.00 $1.05 $2,175.60 Page 13of15 CONTRACT 17-05 CHANGE ORDER#1 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE TM 10-3 24"x18"Sanitary sewer drop;complete as Lump 1-30005 specified Sum 0.00 1.00 1.00 $5,370.68 $5,370.68 TM 10-16 EJM Downtime for Lump 1-30006 AT&T conflict Sum 0.00 1.00 1.00 $8,738.80 $8,738.80 TM 10-16 EJM Downtime for Lump 1-30007 railroad not providing flagging Sum 0.00 1.00 1.00 $5,243.28 $5,243.28 TM 2-21 Sanitary spot repair Lump 1-30008 on Minerva Sum 0.00 1.00 1.00 $8,255.19 $8,255.19 Furnish and install 8"x 4" water main tee;complete as 1-4109 specified Each 0.00 1.00 1.00 $444.00 $444.00 Furnish and install 6"90 degree water main bend; 1-4245 complete as specified Each 0.00 1.00 1.00 $230.00 $230.00 Furnish and install 8"90 degree water main bend; 1-4246 complete as specified Each 0.00 2.00 2.00 $295.00 $590.00 Furnish and install 6"x 4" water main reducer;complete 1-4262 as specified Each 0.00 2.00 2.00 $225.00 $450.00 CO#2 temporary water Maricopa;complete as Lump 1-40000 specified Sum 0.00 1.00 1.00 $18,100.00 $18,100.00 Furnish and install 24"casing pipe by slipping through the existing storm sewer: Linear 1-40001 complete as specified Feet 0.00 110.00 110.00 $200.00 $22,000.00 TM 4-28 Hit unmarked/unknown 4" watermain;complete as Lump 1-40002 specified Sum 0.00 1.00 1.00 $1,025.00 $1,025.00 TM 7-28 Fix a leaking Flare Lump 1-40003 Union;complete as specified Sum 0.00 1.00 1.00 $925.25 $925.25 TM 9-19 remove valves for Muza Metal as the services are not needed;complete as Lump 1-40004 specified Sum 0.00 1.00 1.00 $2,339.00 $2,339.00 TM 10-11 downtime for watermain break on the existing main;complete as Lump 1-40005 specified Sum 0.00 1.00 1.00 $1,876.25 $1,876.25 Furnish and install 6"casing by slipping through the existing storm sewer: Linear 1-50000 complete as specified Feet 0.00 105.00 105.00 $95.00 $9,975.00 ADDITIONAL WORK: CO#1 (ITEMS 1-10000-1-50000)-SUBTOTAL $452,668.83 $0.00 NET INCREASE TO CO#1: $452,668.83 NET INCREASE TO SECTION I $885,872.93 NET DECREASE TO SECTION I ($1,012,745.52) NET DECREASE TO CONTRACT: ($126,872.59) Page 15 of 15