WHEREAS, the City Manager prepared, submitted and recommended Capital
Improvement Programs for the years 2016, 2017, 2018, and 2019, wherein were listed all
anticipated revenue and expenditures for said year, which programs have been filed with
the Common Council and City Clerk, and are available for public inspection; and
WHEREAS, the reconstruction of the Ceape Parking lot has been included in the
2019 Capital Improvement Program and, despite higher construction costs, that project
can still be reconstructed through the use of additional funds that remain after other CIP
projects have been completed under-budget; and
WHEREAS, the construction of a fence surrounding the Oshkosh Police
Department parking lot was included in the 2017 Capital Improvement Program but was
not constructed, but with previously budgeted fund(s) along with other unused funds
from previous Capital Improvement Program projects is able to be constructed at this
time; and
WHEREAS, the City of Oshkosh has heretofore advertised for bids for Ceape
Avenue parking lot reconstruction and fencing for the Police Department parking lot;
and
JULY 9, 2019 19-386 RESOLUTION
CONT'D
WHEREAS,upon the opening and tabulation of bids, it appears that the following
is the most advantageous bid combining both projects:
VINTON CONSTRUCTION COMPANY, INC.
PO Sox 1987
Manitowoc, WI 54221-1987
Total Base Sid + Alternate 1: $1,033,593.40
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the 2016, 2017, 2018, and 2019 Capital Improvement Programs, on file in
the City Clerk's Office, are hereby amended with adjustments as listed in attached Exhibit
"6"; and
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 0321-0410-6804-04914 Contract Control Fund - Storm Sewer
0323-1717-7216-63901 Property/Equipment Improvement Fund -
Land Improvement
0323-0211-7216-06719 Property/Equipment Improvement Fund -
Land Improvement
City
of W
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager/City Engineer
DATE: July 4, 2019
RE: Award Bid for Public Works Contract No. 19-14
Ceape Avenue Parking Lot Reconstruction and
Fencing for Police Department Parking Lot
Vinton Construction Company,Inc./($1,033,595.40)
BACKGROUND
The purpose of this project is to reconstruct an existing parking lot on Ceape Avenue and install
a fence around the Oshkosh Police Department parking lot.
The 2014 Jewell Assessment of Municipal Parking Lots identified the Ceape Avenue Parking Lot as
having a poor surface condition and recommended reconstruction in 2020 as part of the pavement
management plan. The lot is heavily used with its proximity to the Leach Amphitheater,
Convention Center, and downtown. Reconstruction of the lot will provide a better visitor
experience with an improved pavement surface, drainage, and lighting.
The Oshkosh Police Department Fence project was originally funded in the 2017 CIP. The
purpose of the fence is to secure the lot to protect City equipment and staff. OPD has had several
incidents where people have jumped on the hoods of squad cars and left nails under the tires of
vehicles. In addition, OPD has employees that work 24 hours a day and the safety of the
employees at night is paramount. The fence will also secure the staff entrance to the Safety
Building. OPD has had incidents where persons have walked through the employee entrance
into the safety building wanting to turn themselves in for serious crimes. Situations like this
creates a safety issue for OPD employees as they are not expecting to receive people in this
manner.
ANALYSIS
Engineering staff reviewed two(2)bids. The bid documents contained an alternate for installing
the fence around the Oshkosh Police Department. After review of the alternate, it is
\\OSHKOSH06\Departments\Engineering\2019 CONTRACTS\19-14Parking Page 1 of 2
Lots\Project_Information\Correspondence\Memo\19-14 Memo for Bid Award_7-4-19.docx
recommended to award Alternate No. 1 with the base bid. The low bid with Alternate No. 1 is
$1,033,593.40 from Vinton Construction Company, Inc. of Manitowoc,Wisconsin.
FISCAL IMPACT
Funding for the parking lot improvement project is in the Property Improvements section of the
2019 Capital Improvement Program (CIP). Funding for the fencing is from the Property
Improvements section of the 2017 CIP. Funding for the storm sewer portion of this project is
available from the 2019 CIP from other projects coming in under budget. Following is a summary
of the available funds and the estimated total construction cost, including ancillary costs such as
engineering fees, landfill tipping fees,construction materials testing fees,and other construction-
related expenses. Special Assessments will be levied to adjoining property owners per the City's
Special Assessment Policy.
Estimated Total Construction
CIP Section CIP Funds Budgeted Cost
Storm Sewer *$50,000 $36,752
Property
Improvements-Ceape
Avenue Parking Lot *$921,500 $921,476
Property
Improvements-OPD
Fence *$197,000 $196,608
Totals $1,168,500 $1,154,836
Note: The budget line items denoted with an asterisk(*)include budget transfers from other projects. The Storm Water
CIP includes a$25,000 transfer from the 2019 Hazel Street Reconstruction project and$25,000 from the 2019 Oregon
Street Reconstruction project. The Property Improvements—Ceape Avenue Parking Lot CIP and the OPD Fence CIP
both include transfers from projects that came in under budget.
RECOMMENDATIONS
I recommend award to the low bidder, Vinton Construction Company, Inc. in the amount of
$1,033,595.40.
Approved:
Mark A. Rohloff
City Manager
JG/tlt
\\OSHKOSH06\Departments\Engineering\2019 CONTRACTS\19-14Parking Page 2 of 2
Lots\Project_Information\Correspondence\Memo\19-14 Memo for Bid Award_7-4-19.docx
EXHIBIT 6
2019 CAPITAL IMPROVEMENT PROGRAM ADJUSTMENTS
PROP.IMP.
PAGE EQUIPMENT TOTAL
PROPOSED AMENDMENT:07.09.19 Res 19-386
Add:Parking Lot Improvement Project
Previously borrowed funds $ 250,684 $ 250,684
PROPOSED AMENDMENT:07.09.19 Res 19-386
Add: Install fencing around OPD
Previously borrowed funds $ 36,559 $ 36,559
PROPOSED AMENDMENT:07.09.19 Res 19-386
Add: Storm Sewer on Ceape Avenue
Previously borrowed funds $ 50,000 $ 50,000
$ 337,244 $ 337,244
Contract 19-14-Parking Lot Construction 0;63887891
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Section 1: Base Bid $848,114.40 $1,034,609.35
Clearing;complete as
1011 specified Inch Diameter 85.00 $12.00 $1,020.00 $75.00 $6,375.00
Grubbing;complete as
1021 specified Inch Diameter 85.00 $12.00 $1,020.00 $75.00 $6,375.00
Mobilization;complete as
1050 specified Lump Sum 1.00 $67,000.00 $67,000.00 $60,450.00 $60,450.00
Removing building
foundations;complete as
1103 specified Linear Feet 150.00 $22.23 $3,334.50 $100.00 $15,000.00
Removing curb and
gutter;complete as
1110 specified Linear Feet 760.00 $3.00 $2,280.00 $5.00 $3,800.00
Removing concrete and
asphalt sidewalk and
driveway;complete as
1120 specified Square Feet 6,270.00 $0.44 $2,758.80 $3.00 $18,810.00
Unclassified excavation;
1218) complete as specified Cubic Yards 3,100.00 $15.46 $47,926.00 $15.00 $46,500.00
Excavation special
(paving);complete as
1220 specified Tons 100.00 $35.50 $3,550.00 $30.00 $3,000.00
8"concrete pavement
HES removal and
replacement;including
sawing;pavement ties;
dowel bars;bond
breaker;integral curb and
fine grading;turf
restoration;and traffic
control;complete as
1319 specified Square Yards 250.00 $95.00 $23,750.00 $225.00 $56,250.00
Adjust manholes and
inlets;complete as
1360 specified Each 11.00 $350.00 $3,850.00 $550.00 $6,050.00
Turf restoration;
1370 complete as specified Square Yards 155.00 $15.00 $2,325.00 $15.011 $2,325.00
11Eng,..,gIM19COYIRACT5119-n Put,',I.ablPtvµ.,_Inhmn.,, armlr.,,1nb119-14 Rd T.b n.3o-19 Page 1 of 10 6/28/2019
Contract 19-14-Parking Lot Construction(46388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Cold weather covering
(concrete pavement)-
single visquine;complete
1380 as specified Square Yards 300.00 $0.01 $3.00 $0.01 $3.00
Cold weather covering
(concrete pavement)-
double visquine;
1382 complete as specified Square Yards 300.00 $0.01 $3.00 $0.01 $3.00
Cold weather covering
(concrete pavement)-
double visquine with 6"
hay;complete as
1384 specified Square Yards 300.00 $0.01 $3.00 $0.01 $3.00
Up-charge for late season
cold weather concrete
pavement;complete as
1390 specified Cubic Yards 70.00 $0.01 $0.70 $0.01 $0.70
36"curb and gutter;
plain;(12"curb head);8";
with 6"CABC and
grading;complete as
1445 specified Linear Feet 990.011 $25.00 $24,750.00 $42.00 $41,580.00
30"concrete curb and
gutter removal and
replacement;including
sawing;pavement ties;
dowel bars;bond
breaker;integral curb and
fine grading;turf
restoration;and traffic
control;complete as
1448 specified Linear Feet 50.00 $50.00 $2,500.00 $75.00 $3,750.00
36"mountable curb and
gutter;8";with 6"CABC
and grading;complete as
1450 specified Linear Feet 220.00 $50.00 $11,000.00 $45.00 $9,900.00
Sidewalk curb;complete
1460 as specified 1_inear Feet 340.00 $20.00 $6,800.00 $45.00 $15,300.00
1 tEnpneerng%/019 CO\IRAtT7\19-14 PAH.,as1Pro.(._inn.rmaiwn,Cmt..n lnw,1r 14 B.J Tab b}819 Page 2 of 10 6/28/2019
Contract 19-14-Parking Lot Construction 06388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
4"concrete sidewalk with
3"CABC and grading;
1500 complete as specified Square Feet 300.00 $11.00 $3,300.00 $12.87 S3,855.0)
6"concrete sidewalk/
driveway/ramp with 3"
CABC and grading;
1510 complete as specified - Square Feet 1,870.00 511.00 $20,570.00 S14.35 $26,834.50
No.4 reinforcing rods-
deformed;epoxy-coated;
1550 complete as specified Linear Feet 60.00 $1.50 $90.00 $12.00 $720.00
Drilled No.4 sidewalk tie
bars-deformed;epoxy-
coated;complete as
1560 specified Each 18.00 $10.00 $180.00 $12.00 $216.00
Cold weather covering
(sidewalk)-single
visquine;complete as
1580 specified Square Feet 500.00 $0.54 $270.00 $0.01 $5.00
Cold weather covering
(sidewalk)-double
visquine;complete as
1582 specified Square Feet 500.00 $1.00 5500.00 S0.01 $5.00
Cold weather covering
(sidewalk)-double
visquine with 6"hay;
1584 complete as specified Square Feet 500.00 $1.67 $835.00 $0.01 $5.00
Up-charge for late season
cold weather concrete
sidewalk;complete as
1590 specified Cubic Yards 15.00 $25.00 $375.00 $0.01 $0.15
Locate existing property
monuments;complete as
1650 specified Each 100 $400.00 $400.00 S250.00 $250.00
Replace existing property
monuments;complete as
1652 specified Each 1 00 $400.00 S400_00 S750.00 $750.00
Sawing existing
pavement;complete as
1700 specified Linear Feet 175.00 $4.00 $700.00 $3.00 $525.00
1\Enpww.lt b19 CONTRACTS\1911 Pukmd SW 14,6IF19 Page 3 o1 10 6/28/2019
Contract 19-14-Parking Lot Construction I:6388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Base aggregate dense;I-
1/4";complete as
1801 specified Tons 1,520.00 $12.00 $18,240.00 $16.50 $25,080.00
Base aggregate dense;3";
1802 complete as specified Tons 2,500.00 $12.00 $30,000.00 $15.50 $38,750.00
Tack coat;complete as
1900 specified Gallons 430.00 $4.04 $1,737.20 $4.00 $1,720.00
HMA Pavement LT;
1901 complete as specified Tons 1,335.00 S84.44 $112,727.40 $83.60 $111,606.00
HMA cold weather
paving;complete as
1903 specified Tons 700.00 $97.77 $68,439.00 596.80 $67,760 00
4"asphaltic surface LT
with 6"CABC and
grading;complete as
1916 specified Square Yards 90.00 $33.13 $2,981.70 $32.80 $2,952.00
Asphaltic cold weather
paving;complete as
1918 specified Square Yards 40.00 $11.32 5452.80 $11.20 $448.00
Prepare foundation for
asphaltic paving;
1960 complete as specified Lump Sum 1.00 523,634.00 $23,634.00 $23,400.00 $23,400.00
Pavement markings;
epoxy;4"(white);
1974 complete as specified Linear Feet 3,38)1.00 $5.00 $16,900.00 $5.00 $16,900.00
Pavement markings;
symbol epoxy;
handicapped(white);
1984 complete as specified Each 4.00 $225.00 $900,00 $225.00 $900.00
Temporary pavement
markings;paint;4"
(white);complete as
1985 specified Linear Feet 800.00 $0.95 $760.00 $12.00 $9,600.00
Furnish and install 12"
storm sewer;complete as
2003 specified Linear Feet 460.00 $64.16 $29,513.60 $74.00 $34,040.00
Furnish and install 15"
storm sewer;complete as
2006 specified Linear Feet 5.00 $72.00 $360.00 $85.00 $425.00
I\EnRmernns,2019 CONTRAC 5\19-14 Parke,Lab\ihNeb-InMiubon\ean rad Idol1,1 a d Ta&_6-2619 Page 4 ot It) 6/28/2019
Contract 19-14-Parking Lot Construction I«6388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Furnish and install 18"
storm sewer;complete as
2009 specified Linear Feet 100.00 $74.00 $7,400.00 598.00 $9,800.00
Furnish and install 30"
storm sewer;complete as
2021 specified Linear Feet 165.00 S101.20 516,698.00 $108.00 $17,820.00
Furnish and install 36"
storm sewer;complete as
2024 specified Linear Feet 120.00 $134.80 516,176.00 5147.00 $17,640.00
Furnish and install
standard storm sewer
manhole(4'diameter);
2201 complete as specified Vertical Feet 9.80 $553.00 $5,419.40 $1,125.00 $11,025.00
Furnish and install
standard storm sewer
manhole(5'diameter);
2202 complete as specified Vertical Feet 22.40 $647.00 $14,492.80 $975.00 $21,840.00
Furnish and install
standard storm sewer
manhole(6'diameter);
2203 complete as specified Vertical Feet 6.40 $650.00 $4,160.00 $1,200.00 $7,680.00
Furnish and install Type
1 inlet;complete as
2236 specified Each 1.00 $2,180.00 $2,180.00 $2,400.00 $2,400.00
Furnish and install Type
3 inlet(with 18"sump);
2237 complete as specified Each 2.00 $2,188.00 $4,376.00 $2,650.00 $5,300.00
Furnish and install pave
drain inlet;complete as
2240 specified Each 2.00 $2,067.00 $4,134.00 $2,400.00 $4,800.00
Perforated drain tile;
2416 complete as specified Linear Feet 235.00 $12.30 $2,890.50 $15.00 $3,525.00
Furnish;install;maintain;
and remove Type D
modified inlet protection;
2508 complete as specified Each 19.00 $80.00 $1,520.00 $125.00 $2,375.00
11 Es6vrvin6\2019 CONfRACT5\19.19 Park,lob\1,,1_Inbrmahon,Cmnael Info,19.14 Rid ra1 62N 19 Page 5 of 10 6/28/2019
Contract 19-14-Parking Lot Construction 06388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Sediment removal-Type
D modified inlet
protection;complete as
2510 specified Each 19.00 $5.00 $95.00 $50.00 $950.00
Furnish;install;maintain;
and remove stone
tracking pad;complete as
2512 specified Each 1.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00
Furnish;install;maintain;
and remove stone bag;
2516 complete as specified Each 150.00 $10.00 $1,500.00 $12.00 $1,800.00
Furnish;install;maintain;
and remove 12"diameter
sediment logs;complete
2518 as specified Linear Feet 50.00 $10.00 S500.00 510.00 $500.00
Furnish;install;maintain;
and remove ditch check;
2522 complete as specified Each 5.00 $125.00 S625.00 $150.00 $750.00
Furnish;install;maintain;
and remove dewatering
tank system;complete as
2524 specified Each 1.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00
Furnish and install
shredded bark mulch;
2625 complete as specified Square Yards 390.00 $10.25 $3,997.50 $22.50 $8,775.00
Furnish and install
Hackberry trees;
2626A complete as specified Each 3.00 $555.00 $1,665.00 $617.50 $1,852.50
Furnish and install
Service Berry trees;
2626B complete as specified Each 6.00 $675.00 $4,050.00 $585.00 $3,510.00
Furnish and install White
Oak trees;complete as
2626C specified Each 12.00 $750.00 $9,000.00 $731.25 $8,775.00
Furnish and install
Arborvitae trees;
2626D complete as specified Each 9.00 $250.00 $2,250.00 $292.50 $2,632.50
I1Enginnirtngl 019 CONTRACTS\1411 Parkins laal Pr,Info99 fl.,UConlran Ink,.19 la Ski lab&i919 Page 6 of 10 6/28/2019
Contract 19-14-Parking Lot Construction(#6388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Furnish and install
Japanese Tree Lilac
shrubs;complete as
2628A specified Each 5.00 $615.00 $3,075.00 S650.00 $3,250.00
Furnish and install Shrub
Rose shrubs;complete as
2628B specified Each 25.00 $48.00 $1,200.00 $39.00 $975.00
Furnish and install
Ninebark shrubs;
2628C complete as specified Each 28.00 $60.00 $1,680.011 S55.25 $1,547.00
Furnish and install
Viburnum shrubs;
2628D complete as specified Each 28.00 $75.00 $2,100.00 $55.25 $1,547.00
Furnish and install
Weigala shrubs;complete
2628E as specified Each 20.00 $80.00 $1,600.00 $55.25 $1,105.00
Abandon 8"-12"storm
sewer;complete as
2800 specified Linear Feet 325.00 $12.00 $3,900.00 $26.00 $8,450.00
Abandon 15"and larger
storm sewer;complete as
2802 specified Linear Feet 195.00 $20.00 $3,900.00 $35.00 $6,825.00
Abandon storm sewer
manholes and inlets;
2810 complete as specified Each 4.00 $400.00 $1,600.00 $800.00 $3,200.00
Connect to existing storm
sewer main;complete as
2850 specified Each 3.00 $459.00 $1,377.00 $800.00 $2,400.00
Storm sewer utility line
opening(ULO);complete
2914 as specified Each 1.00 $1,500.00 $1,500.00 $500.00 $500.00
Excavation special
(storm);complete as
2950 specified Tons 292.00 $30.50 $8,906.00 $27.00 $7,884.00
Furnish and install
geotextile fabric;
2951 complete as specified Square Yards 770.00 $4.75 $3,657.50 $6.50 $5,005.00
u‘Enginet.g12019 cOMVAC1<\1944 nrung I or,Prq..._irb.,,,am„'Contract I.,1414 ea roe M1.zx iu Page 7 of 10 6/28/2019
Contract 19-14-Parking Lot Construction(#6388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Furnish and install 3/4"
clear stone;complete as
2953 specified Tons 675.00 518.83 512,71(1.25 $1650 $11,137.50
Furnish and install heavy
biaxial geogrid;complete
2957 as specified Square Yards 485.00 $2.25 $1,091.25 S250 51,21250
Install permeable
articulating concrete
block(PACB);complete
2958 as specified Square Yards 485.00 5165.50 $80,267.50 5153.00 $74,205.00
Furnish and install
geomembrane liner;
2961 complete as specified Square Yards 660.00 $17.10 $11,286.00 $65.00 $42,900.00
Furnish and install pull
box-non-conductive;24"
x 42";complete as
5019 specified Each 5.00 $1,500.00 $7,500.00 $1,500.00 $7,500.00
Furnish and install
electric manhole(2'
diameter);complete as
5021 specified Each 4.00 $4,500.00 $18,000.00 $4,500.00 $18,000.00
Adjust pull box;complete
5025 as specified Each 5.00 $5.00 $25.00 $5.00 $25.00
Furnish and install
communication vault;30"
x 48";complete as
5032 specified Each 2.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00
Furnish and install 1"
Schedule 40 PVC;
5100 complete as specified Linear Feet 520.00 $5.00 $2,600.00 $5.00 $2,600.00
Furnish and install 2"
Schedule 40 PVC;
5120 complete as specified Linear Feet 800.00 S6.00 $4,800.00 $6.00 $4,800.00
Furnish and install 3"
Schedule 40 PVC;
5130 complete as specified Linear Feet 700.00 57.00 54,900.00 $7.00 $4,900.00
Connect to existing pull
box;complete as
5180 specified Each 4.00 $125.00 $500.00 $125.00 $500.00
I:1F gknenmg\2019 CVNTRACTf119-14 Parking Tar,Pro,jobrmumonl('unnrl Nb119.14 gd Tab 69819 Page 8 of 10 6/28/2019
Contract 19-14-Parking Lot Construction(46388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Connect to existing
conduit;complete as
5184 specified Each 3.00 $125.00 $375.00 S125.00 $375.00
Furnish and install 8
gauge red-coated wire;
5250 complete as specified Linear Feet 1,05(1.00 $0.90 $945.00 $1190 $945.00
Furnish and install 8
gauge black-coated wire;
5251 complete as specified Linear Feet 1,0511.00 $0.90 S945.00 $0.9(1 $945.00
Furnish and install 10
gauge green-coated wire;
5262 complete as specified Linear Feet 800.00 $0.65 $520.00 50.65 $520.00
Furnish and install 12
gauge red-coated wire;
5270 complete as specified Linear Feet 300.00 50.60 $180.00 50.60 $180.00
Furnish and install 12
gauge black-coated wire;
5271 complete as specified Linear Feet 300.00 $0.60 $180.00 50.60 $180.00
Furnish and install 12
gauge green-coated wire;
5272 complete as specified Linear Feet 300.00 $0.60 $180.00 $0.60 $180.00
Furnish and install 14
gauge green-coated wire;
5282 complete as specified Linear Feet 1,100.00 $0.60 $660.00 50.60 $660.00
Furnish and install fuse
holder;complete as
5380 specified Each 22.00 $50.00 $1,100.00 $50.00 $1,100.00
Furnish and install 5A
fuse;complete as
5392 specified Each 22.00 $5.00 $110.00 $5.00 $110.00
Install single head
fixture;"City Supplied';
5400 complete as specified Each 5.00 $500.00 $2,500 00 $500.00 $2,500.00
Install double head
fixture;"City Supplied";
5402 complete as specified Each 3.00 $750.00 $2,250.00 $750.00 $2,250.00
Furnish and install Type
2 base;complete as
5502 specified Each 11.00 $975.00 $10,725.00 $975.00 $10,725.00
i.�E,,g,,..,o,R\mis CON1RACR\1411 P.no,s Loa\h$t_lnk.m.m.\Uno-n hdo\1911 Sid r.66S19 Page 9 of 10 6/28/2019
Contract 19-19-Parking Lot Construction 06388789)
Owner:Oshkosh WI,City of
Solicitor:Oshkosh WI,City of
Bid Opening: 06/28/2019 10:00 AM CDT
Vinton Construction Company Highway Landscapers,Inc.
PO Box 1987
Manitowoc,WI 54221-1987
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
iSection2: Alternate 1 $185,479.00 $172,500.00
Oshkosh Police
Department metal fence
and gate installation;
10000-1 complete as specified Lump Sum 1.00 $185,479.00 $185,479.00 $172,500.00 $172,500.00
Bid Total: $1,033,593.40 $1,207,109.35