HomeMy WebLinkAbout08. 19-384 JULY 9, 2019 19-384 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 19-02 TO ADVANCE CONSTRUCTION, INC. FOR JELD-WEN/STRINGHAM WATERSHED OUTFALL RECONSTRUCTION ($2,901,799.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Jeld- Wen/Stringham Watershed Outfall Reconstruction; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: ADVANCE CONSTRUCTION, INC. 2141 Woodale Avenue Green Bay, WI 54313 Total Base Bid w/Alternate No. 1 & 2: $2,901,799.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0317-0410-7480-03302 Special Assessments Fund - Sewer 0321-0410-6804-04902 Contract Control Fund - Storm Sewer City of W Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager/City Engineer DATE: July 4, 2019 RE: Award Bid for Public Works Contract No. 19-02 Jeld-Wen/Stringham Watershed Outfall Reconstruction Advance Construction, Inc. (Advance)/($2,901,799) BACKGROUND The purpose of this project is to reconstruct the Jeld-Wen/Stringham Watershed outfall. Improvements have been made within the Stringham Watershed and improving the outfall size will continue to reduce flooding within the watershed. Additionally,this project will be dredging out contaminated sediment from the outfall area,which will not only help clean up the river bed, but will also help maintain the storm sewer flows out to the river. A deeper, more reliable sanitary connection will be installed off of West 5th Avenue under the box culvert for future development within the Jeld-Wen site. ANALYSIS Engineering staff reviewed two (2) bids. The bid documents contained two (2) alternates for installing additional storm and sanitary sewer and for sediment stabilization. After review of the alternatives, it is recommended to award both Alternate No. 1 and No. 2 with the base bid. The low bid with Alternate No. 1 and No. 2 is $2,901,799 from Advance Construction, Inc. of Green Bay, Wisconsin. 1.\Engineering\2019 CONTRACTS\19-02 Jeld-Wen Page 1 of 2 Outfall\Project_Information\Correspondence\Memo\19-02 Memo for Bid Award_7-4-19.docx FISCAL IMPACT Funding for the Jeld-Wen/Stringham Watershed outfall reconstruction project is in the 2019 Capital Improvement Program (CIP). Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees,construction materials testing fees, and other construction-related expenses. Special Assessments will be levied to adjoining property owners per the City's Special Assessment Policy. Estimated Total Construction CIP Section CIP Funds Budgeted Cost Storm Sewer *$3,409,191 $3,362,856 Sanitary Sewer *$90,000 $78,719 Sidewalk *$10,000 $8,881 Totals $3,509,191 $3,450,456 Note: The budget lines item denoted with an asterisk(*)include budget transfers from other projects. The Storm Water CIP includes a $144,191.25 transfer from the 2018 Jeld-Wen/Stringham Watershed Outfall Reconstruction project; $75,000 from the 2018 Sanitary Sewer and Lateral Relay and Miscellaneous Utility Repair, $35,000 from the 2018 Concrete Pavement Repairs project;$100,000 from the 2019 Hazel Street Reconstruction project;and$455,000 from the 2019 Miscellaneous Utility Improvements project. The Sanitary CIP includes a $90,000 transfer from the 2019 CIP Inflow/Infiltration Removal/Sanitary Sewer Rehabilitation project, and the Sidewalk CIP includes a$10,000 transfer from the 2019 Oregon Street Reconstruction project. RECOMMENDATIONS I recommend award to the low bidder,Advance Construction, Inc., in the amount of$2,901,799. Approved: Mark A. Rohloff City Manager JG/tlt I:\Engineering\2019 CONTRACTS\19-02 Jeld-Wen Page 2 of 2 Outfall\Project_lnformation\Correspondence\Memo\19-02 Memo for Bid Award_7419.do« Contract 19-02-Jeld-Wen/Stringham Watershed Outfall Reconstruction 06376379) Owner;Oshkosh WI,City of Solicitor.Oshkosh WI,City of Bid Opening: 06/24/2019 10:00 AM CDT Advance Construction Inc. PTS Contractors,Inc 2141 Woodale Avenue Green Bay,WI 54313 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Base Bid $1,855,335.00 $2,485,180.00 Existing fence removal and replacement; 1190 complete as specified Lump Sum 00 $35,000.00 $35,000.00 $17,200.00 $17,200.00 Sediment storage area; 1223 complete as specified Lump Sum 1.00 $35,000.00 $35,000.00 $145,000.00 $145,000.00 Dredge material; 1224 complete as specified Lump Sum 1.00 $1,100,000.00 $1,100,000.00 $1,100,000.00 $1,100,000.00 Load;transport;and dispose of dewatered sediment;complete as 1225 specified Tons 5,000.00 $14.00 $70,000.00 $16.00 $80,000.00 Riverwalk removal and replacement;complete as 1335 specified Lump Sum 1.00 $50,000.00 $50,000.00 $70,250.00 $70,250.00 Furnish and install 27" storm sewer;complete as 2018 specified Linear Feet 5.00 $630.00 $3,150.00 $625.00 $3,125.00 Furnish and install 30" storm sewer;complete as 2021 specified Linear Feet 5.00 $650.00 $3,250.00 $635.00 $3,175.00 Furnish and install 6'x 12' box culvert storm sewer; 2088 complete as specified Linear Feet 24 00 $3,000.00 $72,000.00 $3,320.00 $79,680.00 Furnish and install 6'x 12' box culvert end section with joint ties;complete 2187 as specified Each 1.00 $25,000.00 $25,000.00 $27,810.00 $27,810.00 Furnish and install storm sewer transition chamber M-2 with neoprene gasket;complete as 2225A specified Each 1.00 $58,000.00 $58,000.00 $78,400.00 $78,400.00 Furnish;install;maintain; and remove Type D modified inlet protection; 2508 complete as specified Each 25.00 $100.00 $2,501)00 $160.00 $4,000.00 Sediment removal-Type D modified inlet protection;complete as 2510 specified Each 25.00 $15.00 S375.00 $52.00 $1,300.00 1:\Erpavu612019 CONTRACTS\1fUlteW-Wu,OuJe1l\PrgmJ,,Mrsaau,iC aEJa1194t 1.1 TaFb24-19 Page I of 5 6/27/2019 Contract 19-02-Jeld-Wen/Stringham Watershed Outfall Reconstruction(16376379) Owner:Oshkosh WI,City of Solicitor:Oshkosh WI,City of Bid Opening: 06/24/2019 10:00 AM CDT Advance Construction Inc. PTS Contractors,Inc 2141 Woodale Avenue Green Bay,WI 54313 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish;install;maintain; and remove stone tracking pad;complete as 2512 specified Each 1.00 $6,500.00 $6,500.00 $3,300.00 $3,300.00 Furnish;install;maintain; and remove silt fence; 2514 complete as specified Linear Feet 900.15) $3.00 $2,700.00 $2.00 $1,800.00 Furnish;install;maintain; and remove 12"diameter sediment logs;complete 2518 as specified Linear Feet 280.00 $17.00 $4,760.00 $10.00 $2,800.00 Conned to existing storm sewer main;complete as 2850 specified Each 3.00 $3,300.00 $9,900.00 $1,750.00 $5,250.00 Mobilization;complete as 2900 specified Lump Sum 1.00 $350,000.00 $350,000.00 $848,700.00 $848,700.00 Clear trees;complete as 2906 specified Lum_p Sum 1.00 $7,000.00 $7,000.00 $3,500.00 $3,500.00 Clear shrubs;complete as 2908 specified Lump Sum 1.011 $4,000.00 $4,000.00 $2,300.00 $2,300.00 Grub stumps;complete 2912 as specified Lump Sum 1.00 $7,000.00 $7,000.00 $2,300.00 $2,300.00 Excavation special (storm);complete as 2931 specified Tons 230.00 $40.00 $9,200.00 $23.00 $5,290.00 Section 2: Alternate 1(Awarded) $981,464.00 $1,358,589.00 Removing pavement; 1100-1 complete as specified Square Yards 450.00 $10_00 $4,500.00 $4.00 $1,800 00 Removing concrete and asphalt sidewalk and driveway;complete as 1120-1 specified Square Feet 770.00 $1.00 S770.00 $4.00 $3,080.00 Adjust manholes and inlets;complete as 1360-1 specified Each 4.00 $900.00 $3,600.00 5625.00 52,500.00 4"concrete sidewalk with 3"CABC and grading; 1500-1 complete as specified _ Square Feet 770.00 $13.00 $10,011)00 S16.00 512,320.00 No.4 reinforcing rods- deformed;epoxy-coated; 1550-1 complete as specified Linear Feet 60.00 $4.00 $240.00 $11 00 5660 00 t\F^6laran'R\ruff COMhacr5,,9an Info1402 SW rsyaar Page 2 of 5 6/2;/220]9 Contract 19-02-Jeld-Wen/Stringham Watershed Outfall Reconstruction P6376379) Owner:Oshkosh WI,City of Solicitor.Oshkosh WI,City of Bid Opening: 06/24/2019 10:00 AM CDT Advance Construction Inc. PTS Contractors,Inc 2141 Woodale Avenue Green Bay,WI 54313 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Drilled No.4 sidewalk tie bars-deformed;epoxy- coated;complete as 1560-1 specified Each 4.00 $11.00 $44.00 $52.00 $208.00 Sawing existing pavement;complete as 1700-1 specified Linear Feet 190.00 $4.OU $760.00 $4.00 $760.00 Tack coat;complete as 1900-1 specified Gallons 85.00 $4.00 $340.00 54.00 $340.00 4"asphaltic surface LT with 6"CABC and grading;complete as 1916-1 specified Square Yards 335.00 $43.00 $14,405.00 545.00 $15,075.00 Furnish and install 12" storm sewer;complete as 2003-1 specified Linear Feet 40.00 $85.00 S3,400.00 5188.00 $7,520.00 Furnish and install 24" storm sewer;complete as 2015-1 specified Linear Feet 50.00 $105.00 $5,250.00 $220.00 $11,000.00 Furnish and install 6'x 12' box culvert storm sewer; 2088-1 complete as specified Linear Feet 282.00 $2,500.00 $705,000.00 $3,400.00 S958,800.00 Furnish and install 6'x 12' box culvert storm sewer with manhole or inlet riser;complete as 2112-1 specified Linear Feet 6.00 $2,700.00 $16,200.00 $2,600.00 $15,600.00 Furnish and install standard storm sewer manhole(5'diameter); 2202-1 complete as specified Vertical Feet 6.00 $850.00 $5,100.00 $360.00 $2,160.00 Incremental cost for modification associated with relocation and installation of storm sewer transition chamber M-2 to alternate location; 2225A-1 complete as specified Each 1.00 $5,000.00 $5,000.00 $78,400.00 $78,400.00 Ii ankW'9 CONTRACTS roa:64'wm°Wall Norc,_INNa,Contnel YJeusm lid T.nyu.ts Page 3 of 5 6/27/2019 Contract 19-02-Jeld-Wen/Stringham Watershed Outfall Reconstruction 06376379) Owner:Oshkosh WI,City of Solicitor.Oshkosh WI,City of Bid Opening: 06/24/2019 10:00 AM CDT Advance Construction Inc. PTS Contractors,Inc 2141 Woodale Avenue Green Bay,WI 54313 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install standard storm sewer manhole riser(4' diameter);complete as 2227-1 specified Vertical Feet 3.50 $850.00 52,975.00 $1,100.00 53,850 00 Furnish and install Type 1 inlet(with 18"sump); 2235-1 complete as specified Each 1.00 $5,000.00 $5,000.00 $2,200.00 S2,200.00 Furnish and install storm sewer clay dams; 2406-1 complete as specified Each 1.00 $2,000.00 $2,000.00 $600.00 $600.00 Furnish and install topsoil 6"depth; 2600-1 complete as specified Square Yards 340.00 $7.00 $2,380.00 $10.00 $3,400.00 Furnish and install turf grass;complete as 2620-1 specified Square Yards 340.00 $4.00 $1,360.00 $3.00 $1,020.00 Furnish and install annual cover crop; 2624-1 complete as specified Square Yards 340.00 $2.00 $680.00 $2.00 $680.00 Furnish and install Class I;Type A erosion control mat;complete as 2630-1 specified Square Yards 340.00 $2.50 $850.00 $3(10 y1,020 00 Connect to existing storm sewer main;complete as 2850-1 specified Each 4.00 $1,500.00 $6,000.00 $1,750.00 57,000 00 Excavation special (storm);complete as 2931-1 specified Tons 6,900.00 515.00 $103,500.00 $23.00 5156,700.00 Furnish and install 10" sanitary sewer(new); 3032-1 complete as specified Linear Feet 100.00 S500.00 $50,000.00 $430.00 $43,000.00 Furnish and install standard sanitary sewer manhole(5'diameter); 3102-1 complete as specified Vertical Feet 14.00 $1,000.00 $14,000.00 $1,100.00 $15,400.00 Furnish and install external sanitary sewer manhole chimney seal; 3114-1 complete as specified Each 1-00 5500 00 $500.00 $450.00 $450.00 �:16W^Rre'OM car+rucrs»m kid-Wen 0401•11\Itopainfonmusion\Cora.,w.uvm Bid r. e-u.ie i'.,gc4„It 6/27/2019 Contract 19-02-Jeld-Wen/Stringham Watershed Outfall Reconstruction 0:6376379) Owner.Oshkosh WI,City of Solicitor.Oshkosh WI,City of Bid Opening: 06/24/2019 10:00 AM CDT Advance Construction Inc. PTS Contractors,Inc 2141 Woodale Avenue Green Bay,WI 54313 Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Furnish and install sanitary sewer lateral marker balls;complete as 3236-1 specified Each 2 00 $50.00 $100.00 $23.00 $46.00 Furnish and install clay dams;complete as 3238-1 specified Each 1.00 $1,000.00 $1,000.00 $600.00 $600.00 Furnish and install 18" sanitary sewer open cut casing pipes;complete as 3410-1 specified Linear Feet 20.00 $450.00 $9,000.00 $140.00 $2,800.00 Furnish and install 12" water main gate valve; 4404-1 complete as specified Each 1(10 $7,500.00 $7,500.00 $7,600.00 $7,600.00 Section 3: Alternate 2(Awarded) $65,000.00 $330,000.00 Sediment stabilization; 1221-2 complete as specified Tom. 5,0O(1.00 $13.00 $65,000.00 $66.00 $330,000.00 Bid Total: I $2,901,799.00 $4,173,769.00 I\k pn.enng 1ww eoenxwC1,I,.lad we.,u,,,iw'r.o,,.,j,ao.,uonn1c.m...c,[No\ivmn 4 nn ea4-ia Page 5 of 5 6/27/2019