Loading...
HomeMy WebLinkAbout0105904-Building (remove paneling & install drywall)OSHKOSH ON THE WATER .lob.Address 449 W SOUTH PARKAVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner ERIC D ABRAHAM Contractor OWNER Category 140 - Interior Remodeling No 105904 Create Date 12/31/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Removing the paneling in two first floor bedrooms and the living room and installing drywall. All construction shall comply with building of Work =ode requirements. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 12/31/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 449W SOUTH PARKAVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.