HomeMy WebLinkAbout11. 19-359 JUNE 25, 2019 19-359 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: RESCIND RESOLUTION 18-549 AWARDING BID TO NORTHERN
METAL & ROOFING INC. / ROOF REPLACEMENT /
WASTEWATER TREATMENT PLANT ($2774.80)
INITATED BY: PURCHASING DEPARTMENT
WHEREAS, the Common Council previously approved Resolution 18-549 to
award the WWTP Headworks and Digester Building Roof Replacement bid to Northern
Metal & Roofing; and
WHEREAS, after the bid award it was determined that additional work would be
required to complete the proposed project and it was therefore necessary to revise the
specifications; and
WHEREAS, it is therefore necessary to rescind the prior resolution and re-bid the
project.
NOW, THEREFORE, BE IT RESOLVED by the Common Council for the City of
Oshkosh that Resolution 18-549 is hereby rescinded and shall have no further force and
effect.
Money to pay costs associated with this rescission shall be appropriated from the
following:
Acct. No. 0551-1946-1731-XXXXX Sewer Utility- Treatment Structures &
Improvement
0322-1910-7206-05814 Capital Construction- Digester Roof
Replacement
111
of
Oshkosh
TO: Honorable Mayor and Members of the Common Council
FROM: Jon Urben, General Services Manager
DATE: June 13,2019
RE: Rescind Resolution 18-549 Awarding Bid to Northern Metal&Roofing Inc./Roof
Replacement/Wastewater Treatment Plan ($2,774.80)
BACKGROUND
At their November 14, 2018 meeting the Common Council approved resolution 18-549 to award the
WWTP Headworks and Digester Building Roof Replacement bid to Northern Metal&Roofing.
ANALYSIS
After the bid award the roofing contractor determined they would need to remove the two large
HVAC rooftop units to complete the roofing to meet manufacture's specifications. These units provide
circulation for areas of the wastewater treatment plant that are exposed to dangerous gas
accumulations. As the need to maintain circulation was not included in the contract documentation
and the cost to remove and reset the units would have exceeded 15% of the contract dollar amount the
decision was made to cancel the contract,revise the specifications and then re-bid the project.
FISCAL IMPACT
Cancellation of the contract will result in a fiscal impact of$2,774.80 in costs to the contractor for labor,
restocking fees and performance bond. This project was assigned to A/N#: 05511946 1731 XXXXX and
03221910 7206 05814.
RECOMMENDATION
Purchasing recommends the Common Council rescind resolution 18-549.
Respectfully Submitted, Approved:
Jon G.Urben,General Services Manager Mark A. Rohloff,City Manager