HomeMy WebLinkAbout0105870-Building (platform)OSHKOSH
ON THE WATER
.lob Address 826 JEFFERSON ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner RICHARD A LEMME
Contractor KRONBERG IMPROVEMENTS
Category 142 - Decks, Patios, Ramps
No 105870
Create Date 12/29/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/Installing a 4'x6'6" platform with frost protection and a temporary handicap ramp off this platform. The ramp will be required for 6 months.
of Work If the ramp becomes permanent, frost protection will be required for the ramp portion. NOTE: All construction shall comply with minimum state
building code requirements.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$900.00 Plan Approval $0.00 Permit Fee Paid
$20.00 Park Dedication $0.00
Date 12/29/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1005 S WEBSTER OMRO WI 54963 - 0000 Telephone Number 685-2674
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKLIST
JOB LOCATION: ~;~-~,_o
P ROPE RTY OWN~ ONTRAC_~T~
CONSTRUCTION DATA: 'J~ New Construction Addition
TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)--
COMPLIANCE CHECKLIST
ZONING.,
Alteration
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is
conforming and when no change in use is proposed. (2) Mainte~nance items, e.g. siding, windows, etc.,
when the use is conforming and when no change is proposed.
._.~ APPROVED ~ DENIED
Plan CommiSSion Action Required
.Variance(s) Required