Loading...
HomeMy WebLinkAbout0105870-Building (platform)OSHKOSH ON THE WATER .lob Address 826 JEFFERSON ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner RICHARD A LEMME Contractor KRONBERG IMPROVEMENTS Category 142 - Decks, Patios, Ramps No 105870 Create Date 12/29/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Installing a 4'x6'6" platform with frost protection and a temporary handicap ramp off this platform. The ramp will be required for 6 months. of Work If the ramp becomes permanent, frost protection will be required for the ramp portion. NOTE: All construction shall comply with minimum state building code requirements. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $900.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 12/29/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1005 S WEBSTER OMRO WI 54963 - 0000 Telephone Number 685-2674 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: ~;~-~,_o P ROPE RTY OWN~ ONTRAC_~T~ CONSTRUCTION DATA: 'J~ New Construction Addition TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)-- COMPLIANCE CHECKLIST ZONING., Alteration DEFICIENT COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is conforming and when no change in use is proposed. (2) Mainte~nance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. ._.~ APPROVED ~ DENIED Plan CommiSSion Action Required .Variance(s) Required