Loading...
HomeMy WebLinkAbout0105767-BuildingOSHKOSH ON THE WATER .lob.Address 1265 JUDY LEE CT Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TIM RUSCH Contractor RUSCH HOMES LLC Category 110 - New Single Family No 105767 Create Date 12/08/2003 Plan E1-155-1203R Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning R-1 Class of Const: 8 Size IRR Unfinished/Basement 910 Sq. Ft. Rooms 4 Height 18 Ft. ~J Projection Finished/Living 2262 Sq. Ft. Bedrooms 4 Stories Quad-level Canopies Garage 744 Sq. Ft. Baths 3 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Required # Dwelling Units 1 # Structures 1 Use/Nature NSFR/Quad-level home with a 3 car attached garage, 14'x20' rear patio, and 24' wide concrete driveway at the property line. of Work HVAC Contractor CONDON TOTAL COMFORT Plumbing Contractor HANSON QUALITY PLUMBING Electric Contractor CUMINGS ELECTRIC INC Fees: Valuation $125,000.00 Plan Approval $75.00 Permit Fee Paid $530.00 Park Dedication $200.00 Issued By: Date 12/17/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address P O BOX 423 Omro WI 54963 - 0000 Telephone Number 685-0241 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. OSHKOSH ON THE WATER Name TIM RUSCH GRADE STAKE FORM Address 1265 JUDY LEE CT Lot 71 Block Subdivision 1st Add to Pheasant Creek Zone Street Number Lot Dimensions Building Grade Elevation Stakes Set At Site 12/09/2003 Set By D.W.G. BK-593, P-27 Grade Stake Number 7074 Create Date 12/08/2003 Ward Sidewalk Existing Department of Public Works I, the undersigned, owner or agent of the above described property agree to have the grade established before excavation has commenced. Wisconsin Department of Industry, WISCONSIN UNIFORM Application No. Labor and Human Relations Safety and Buildings Division BUILDING PERMIT 0105767 P.O. Box 2509 APPLICATION Parcel No. Madison, WI 53701-2509 Wisconsin Statues 101.63, 101.73 [] Constr [] HVAC [] Elec [] Plbg [] Erosion [] Other: Owner's Name Mailing Address Telephone No. TIM RUSCH P O BOX 423 OMRO WI 54963 - 0000 Contractor: L~J Con~J Elec~J HVAC ~J Plbg Lic/Cert # Mailing Address Telephone No. RUSCH HOMES LLC O00000 P O BOX 423 Omro WI 54963 - 0 685-0241 Contractor: ~J Con ~J Elec~J HVAC~J Plbg Lic/Cert # Mailing Address Telephone No. CUMINGS ELECTRIC INC 170792 PO BOX749 NEENAH WI 54957 - 749 920-722-1240 Contractor: ~J Con ~J Elec~J HVAC [] Plbg Lic/Cert # Mailing Address Telephone No. CONDON TOTAL COMFORT 3202 PO BOX 184 RIPON W 54971 - 184 920-748-5050 Contractor: ~J Con [] Elec [] HVAC [] Plbg bio/Cart # Mailing Address Telephone No. HANSON QUALITY PLUMBING 550 N BLUEMOUND RD APPLETON WI 54914 - 0 730-0205 I Lot Area sq. ft. 1/4, 1/4,section ,T N,R E(or)W Building Address Subdivision Name Lot No. Block No. 1265 JUDY LEE CT 1st Add to Pheasant Creek 71 Zoning District(s) Zoning Permit No. Front ft. Rear Left Right Setbacks ft. ft ft ~R~ L~J New [] Repair [] Single Family Entrance Panel L~J Forced Air Furnace Fuel Nat. L.P. Oil Elec. Solid Sola [] Alteration [] Raze [] Two Family Size: 200 amp [] Radiant Baseboard or Panel Gas , [] Addition [] Garage Service: [] Heat Pump Space Htg [] [] [] [] [] [] [] Move [] Other (print): [] Overhead [] Boiler Water Htg [] [] [] [] [] [] [] Underground [] Central Air Conditioning * ~J Dwelling unit will have 3 kilowatt or [] Other: [] Other [] Site Constructed ~ concrete - more installed electric space heating equip. Infiltration control option is: [] Full sealing Unfinished [] Manufactured · Masonry Sewer of joints. [] Blower door test. [] Exterior Basement 910 Sq. ft. · Treated Wood [] Municipal air infiltration barrier. Living Area 2262 Sq. ft. [] 1-Story · Other Garage 744 Sq. ft. [] 2-Story ~ [] Septic Permit No. Envelope 29910 BTU/HR [] Other [] Seasonal Infiltration 19413 BTU/HR Quad-level [] Permanent [] Municipal Utility ~ ~ ~i ~ird~ ~ [] Plus Basement [] Other [] Private On-Site Well $200,000.00 The applicant agrees to comply with all applicable codes, statues and ordinances and with the conditions of this permit, understands that the issuance of the permit creates no legal liability, express or implied, on the Department or municipality; and certifies that all the above information is accurate. APPLICANT'S SIGNATURE DATE SIGNED This permit is issued pursuant to the following conditions. Failure to comply may result in suspension or APPROVAL CONDITIONS revocation of this permit or other penalty see standard conditions of approval I~I1'-,1~ [] Town [] Village [] City [] County ~J State of: Municipality Number of Dwelling Location: ~i~Bi~l~N City Of Oshkosh 7 0 - 2 6 6 ~ Construction Plan Review $75.00 _ HVAC Name Nicole Krahn Inspection Electrical Wis. Permit Seal $30.00 [] Plumbing Date 12/11/03 Other [] Erosion Total $105.00 · 292243 Cert. No. 248101 SBD-5823 (R. 07/92) OSHKOSH ON THE WATER ,Job Address 1265 JUDY LEE CT Name TIM RUSCH Address P O BOX 423 Subdivision 1st Add to Pheasant Creek Building Permit Number 0105767 Number of Dwelling Units Fee Required PARKLAND DEDICATION FEE COLLECTION RECORD Date 12/17/2003 OMRO WI 54963 Lot 71 1 Number of Structures $200.00 Fee Paid Owner's Signature Inspector's Signature Date Date CITY OF OSHKOSH STANDARD CONDITIONS OF APPROVAL Project Address _ ~ 2 LP~ ~'~ LJ ~C~. Permit # Please read the following information and sign at the bottom to acknowledge that you have read and agree to comply with these conditions. All habitable rooms must be provided with 8% light and 3.5% ventilation. Bedrooms located on the second floor or below ground level must be provided with egress windows in addition to the light and ventilation requirements. Basement windows are also required to have window well areas in accordance with ILHR 21.03. 2. Garage spaces shall be separated from the dwelling unit in accordance with ILHR 21.08. The door and frame assembly between the dwelling unit and an attached garage shall be labeled by an independent testin a ency as having a minimum fire-resistive rating of 20 minutes. All drywall joints are required to be taped/sealed unless the joints are fitted so that the gap is no more than a dimes thickness (1/20-inch) and backed by solid wood or drywall with the joints staggered. 3. All penetrations in exterior walls must be sealed prior to the insulation inspection. This includes holes in the top and bottom plates, gaps around heating ducts, and holes in the return air spaces. 4. Smoke detectors are required on every floor and within 6' of all bedrooms. The smoke detectors are required to be hardwired and interconnected. 5. Hydromassage tubs are required to have an access panel to motor. The access panel must be accessible without removing the finish of the house. 6. All overframing must be designed by the truss manufacturer, according to standards set by the truss plate institute, or structural calculations must be provided prior to the rough building inspection. 7. Truss plans must be submitted and approved prior to framing the roof. 8. Truss plans including the truss layout must be provided on site at the rough building inspection. In addition to the truss plans, microlam calculations must be provided on site at the rough building inspection for all microlams with point loads on them. 9. Calculations must be provided for all cantilevered floors with point loads. Floor trusses and TJI's must be designed for the cantilevered areas. 10. The property owner and applicant is responsible for compliance with ILHR 21.125 (Erosion Control). When installing access drives, a minimum of 2"-3" diameter stone is required in addition to a minimum of 6" depth, 30'-50' length, and 14'-20' width. Erosion control measures must be maintained until the lawn is established. 11. All storm sewer inlets must be protected with approved erosion control devices. Tracking (i.e. sediment) must be removed from the street at the end of each workday. Repair any siltation or erosion damage to adjoining surfaces and drainageways resulting from land development or disturbing activities. 12. The building placard must be posted on site at all times. Once the rough framing is up the placard must be posted on the patio door or on a kitchen window. If the placard is not present at any inspection, stop work orders will be posted. Additional placards can be obtained through our department if the cards are misplaced. 13. All mechanicals must be roughed in prior to requesting the rough building inspection. If on the inspection the mechanicals are not roughed in, the inspection will fail and a $100 re-inspection fee will be charged. 14. Attached is a copy of the final inspection checklist. At the final inspection all items on this list must be completed to avoid the $100 re-inspection fee per inspection. 15. When requesting final inspections please note that a minimum of 2 days notice is needed from the time the inspection is ready. Furniture is only allowed to be placed in the center of the garage floor and a minimum of a 3' pathway must be provided around the walls of the garage. At the final inspection no furniture or personal belongings are allowed in the house. Appliances such as the stove, refrigerator, washer, and dryer are not to be set in place due to the electrical inspector needing to look at the power serving the appliances. A 6' stepladder must be on site at the final inspection to provide access to the attic. 16. The building placard must remain on the patio door or on a kitchen window until occupancy is approved. Occupancy is not allowed prior to the placard having all of the final inspection approved stickers on the backside. If occupancy occurs prior to the inspections being approved daily citations will be issued with no further notice being given. 17. All site grading must be done in accordance with the approved drainage plan on file in the public works office, 3rd floor. ~~// ~~ - c j~ ~ic~naEure o~_/drrCicanE: ~-~ l oCJate: 115.31 ~ ~ '~ ;tiooA f ~,- X90. '+S' .. ~:.~~~ ~~-- ~ o ly X 20 ~~TIo ~'~ ~~ a-~ ~; -~ Z `~ G ~' ~qo; _' ~- ;~ ~ ~ ~,, ~,~~` ~, 56 ' '1~a,5 ,.. 13'6'' gl,ao v N 3b'b'' ~ a?~6 -~ '6' 1~ ao` ~ ~~ ~~~ ,~ ~ 75.0 'x x x ~ x ~ ~ ~~~ m ~ $ ~~~~~ O (p ~ n n H 2 ~^ ~ ~ tm~DiQy~~,~m c=~ N mf p7 yip ~ c v ~ n `^ 7 ~G ~ ~ J fli W ~ [~~ ~ N c Oc~n::Rr~S.v.~f° f' C T ~ 1A O ~Gm`G Q W ~ ~,d 61 _~ SU ~ y~ ~ ~ Z O ~ O~ sC O m J ~'~ ~ ~ tl1 L y m~~ ~os,~ m N o ~ ~~g~~~ a O w ~ ~ N _'~ ~~om,n~.~~n ~ o m N - O fn ~t3'~,~t~a~~ rt N Aga a N W Wm~~f°,'~m~'o a ~ ~, /TN~ 'VJ V , ~/~ r 70.22'1 12 65.00' ~r O N `~^F' ''A' / V~ m a Q ~ ~ ~ O