HomeMy WebLinkAbout0105769-Plumbing (scullery sink)OSHKOSH
ON THE WATER
.lob Address 2251 WESTOWNE AVE
Contractor PETERS MECHANICAL INC
Bathtub 0 Shower 0
Whirlpool 0 Floor Drain 0
Lavatory 0 Lndry Tray 0
Toilet 0 Lndry Stndp 0
Res. Sink 0 Disposal 0
Bar Sink 0 Dishwasher 0
Water Heater 0 Sump Pump 0
Site Drain 0 Classrm Sink 0
Roof Drain 0 Breakrm Sink 0
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner HOLIDAY INN EXPRESS & SUITES
Category 440- Industrial-Interior
Ejector/Grind 0 DipWell 0 F Prep Sink
Water Softner 0 Drink Ftn 0 Serv Sink
LocaIWaste 0 Wait. St. 0 Shamp Sink
CIothesWshr 0 Ice Chest 0 FIr/Wst Sink
Bidet 0 Exam Sink 0 Catch Basin
Beer Tap 0 SculrySink 1 Wash Ftn
Dent. Oper. 0 Hand Sink 0 Urinal
Lab Sink 0 Plaster Sink 0 Standp Rec
Sterilizer 0 Surgeons Sink 0 Ice Maker
No 105769
Create Date 12/17/2003
Plan
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0 Int Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 EyeWash Statn
0
0
0
0
0
0
0
0
0
Use/Nature
of Work
INSTALL 4 COMP SCULLERY SINK TO COMPLY WITH HEALTH DEPT REGULATIONS
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $2,000.00 Plan Approval $0.00 Permit Fees $20.00 ~ Permit Voided
Issued By
Date
12/17/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 1421 S WEBSTER AVE OMRO WI 54963 - 0000 Telephone Number
HOME 685-2694
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.