Loading...
HomeMy WebLinkAbout0105101 POSHKOSH ON THE WATER ,Job Address 1390-1398 W SOUTH PARK AVE Contractor O'NEILL ENTERPRISE INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner O'NEILL ENTERPRISES INC Category 410- Residential-Interior Bathtub 5 Shower 5 Ejector/Grind 0 DipWell 0 F Prep Sink __ Whirlpool 0 Floor Drain 5 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 10 LndryTray 0 Local Waste 0 Wait. St. 0 Shamp Sink __ Toilet 10 LndryStndp 0 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 5 Disposal 5 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 5 Beer Tap 0 Sculry Sink 0 Wash Ftn Water Heater 5 Sump Pump 5 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 105101 Create Date 10/09/2003 Plan C5-67-1003-P 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Iht Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 EyeWash Statn 0 0 0 Use/Nature ~IEW 5-UNIT CONDO PLUMBING of Work Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 Valuation $35,000.00 Plan Approval $0.00 Permit Fees $350.00 [] Permit Voided Issued By Date 11/03/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5575 CTY RD N PICKETT WI 54964 - 0000 Telephone Number 428-4700 589-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.