HomeMy WebLinkAbout0105373-Building (roof) SHKOSH
ON THE WATER
Job Address 574 OAK ST
Designer
Category
Type
Zoning
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner STEVEN/KATHY FOLLETZ
Contractor OWNER
No 105373
Create Date 11/17/2003
Size
141 - Exterior Remodeling Plan
· Building C) sign (~) canopy (~) Fence (~ Raze
Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation · Poured Concrete O Floating Slab (~) Pier (~) Other
0 Concrete Block (~) Post (~ Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
0
0
Use/Nature
of Work
SFR/Tear off and replace existing roofing and wood decking on the house, due to old age and hail damage. Replace 2 existing skylights
same size and location). *NO STRUCTURAL WORK.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: (~._ ~/~
$5,000.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $40.00 Park Dedication $0.00
Date 11/17/2003 Final/O.P. 00/00/0000
[] Permit Voided J
In the performance of this work I agree to per[orm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this per,~applicatico within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and t~ se(cure ~y necessary.af~rovals before starting such activity.
Signature ~ ~,,/t~~, ~. Date \~--~
Address 574 OAK ST OSHKO0~- WI 54901 - 4621 Telephone N~;~i~ber
To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.