Loading...
HomeMy WebLinkAbout0105373-Building (roof) SHKOSH ON THE WATER Job Address 574 OAK ST Designer Category Type Zoning CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner STEVEN/KATHY FOLLETZ Contractor OWNER No 105373 Create Date 11/17/2003 Size 141 - Exterior Remodeling Plan · Building C) sign (~) canopy (~) Fence (~ Raze Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete O Floating Slab (~) Pier (~) Other 0 Concrete Block (~) Post (~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 0 0 Use/Nature of Work SFR/Tear off and replace existing roofing and wood decking on the house, due to old age and hail damage. Replace 2 existing skylights same size and location). *NO STRUCTURAL WORK. HVAC Contractor Electric Contractor Fees: Valuation Issued By: (~._ ~/~ $5,000.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $40.00 Park Dedication $0.00 Date 11/17/2003 Final/O.P. 00/00/0000 [] Permit Voided J In the performance of this work I agree to per[orm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this per,~applicatico within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t~ se(cure ~y necessary.af~rovals before starting such activity. Signature ~ ~,,/t~~, ~. Date \~--~ Address 574 OAK ST OSHKO0~- WI 54901 - 4621 Telephone N~;~i~ber To schedule inspections please call the Inspection Request line at 236-5t28 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.