HomeMy WebLinkAbout11. 19-275 MAY 14, 2019 19-275 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER NO. 2 FOR PUBLIC WORKS
CONTRACT NO. 17-19 AVIATION BUSINESS PARK WATER
MAIN LOOP (+$17,108.85)
INITIATED BY: PUBLIC WORKS DEPARTMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
following change Order, a copy of which is attached, is hereby approved:
VINTON CONSTRUCTION COMPANY, INC.
2705 N. Rapids Road
Manitowoc, WI 54221-1987
Net Increase to Contract: $17,108.85
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. Nos. 0541-1867-6401-08673 Water Utility- Maintenance of Mains
0317-0410-7480-03303 Special Assessments Fund - Water
0551-1910-1799-00000 Sewer Utility- Construction in Progress
0321-0410-2182-04719 Contract Control Fund - Sanitary Sewer
0321-0410-2183-04719 Contract Control Fund - Water
r,A
City
of
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager / City Engineer
DATE: May 9, 2019
RE: Change Order No. 2 for Public Works Contract No. 17-19
Aviation Business Park Water Main Loop
Vinton Construction Company, Inc. (+$17,108.85)
BACKGROUND
Change Order No. 2 for Contract 17-19 is scheduled for consideration by the Common Council at
the May 14, 2019 meeting. The contract was originally awarded to Vinton Construction
Company, Inc. in July of 2017, and Change Order No. 1 was approved in September of 2018. This
change order includes additional services requested by City staff and finalizing the contract
quantities so they match field conditions.
ANALYSIS
Following is a summary of the significant changes to each section of the CIP:
Water Main - Final quantities adjusted to match field conditions. Additional services
included additional water main fittings and restoration throughout the project.
FISCAL IMPACT
Contract Section
Change Order Amount
New Construction
Costs with Engr
CIP Budget Amount
Sanitary Sewer
$0.00
$126,496.00
$126,500.00
Water Main
$17,108.85
$1,637,484.65
$1,800,500.00
Total
$17,108.85
$1,763,980.65
$1,927,000.00
This work was funded from the Water Main section of the 2017 Capital Improvement Program.
Additional funding was previously transferred from the water main construction for the West
Murdock Avenue Project, which came in under budget.
1: \ Engineering \ 2017 CONTRACTS\17-19 Aviation Wtr Page 1 of 2
Mn \ Project_lnformation\ Correspondence \ Memo \ 17-19 Memo for CO #2_5-9-19.docx
RECOMMENDATIONS
I recommend approval of Change Order No. 2 to Contact No. 17-19 in the amount of +$17,108.85
to Vinton Construction Company., Inc.
Approved:
Mark A. Rohloff
City Manager
JG/tit
I:\Engineering\2017 CONTRACTS\17-19 Aviation Wtr Page 2 of 2
Mn \ Project_Information \ Correspondence \ Memo \ 17-19 Memo for CO #2_5-9-19.docx
TO: VINTON CONSTRUCTION COMPANY
P.O. BOX 1987
MANITOWOC, WI 54221-1987
CHANGE ORDER #2 (REVISED)
DATE: MAY 2, 2019
Your present contract with the City of Oshkosh, Contract No. 17-19, awarded July 25, 2017, is hereby amended
and changed as follows:
NET INCREASE: $17,108.85
NET DECREASE: $0.00
NET INCREASE TO CONTRACT $17,108.85
TOTALS
BID TOTAL $1,598,113.98 $1,598,113.98
CO #1 $137,990.00 $137,990.00
PREVIOUS BID TOTAL $1,736,103.98 $1,736,103.98
CO #2 $17,108.85 $17,108.85
CONTRACT TOTAL $1,753,212.83 $1,753,212.83
CITY OF OSHKOSH
BY:
City Manager
City Clerk
Approved and accepted:
ontractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT 17-19 CHANGE ORDER #2 FINAL (REVISED)
17-19
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
PRICE
PRICE
Clearing; complete as
1010
specified
Stations
3.80
4.50
0.70
$986.00
$690.20
Grubbing; complete as
1020
specified
Stations
3.80
4.50
0.70
$986.00
$690.20
Removing pavement;
Square
1100
complete as specified
Yards
790.00
667.70
-122.30
$2.50
$305.75)
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1120
specified
Feet
240.00
156.60
-83.40
$0.80
($66.72
Unclassified excavation;
Cubic
1200
complete as specified
Yards
219.00
149.90
-69.10
$16.50
$1,140.15
Restore gravel driveway/
Square
1372
apron; complete as specified
Yards
150.00
516.00
366.00
$4.00
$1,464.00
Sawing existing pavement;
Linear
1700
complete as specified
Feet
905.00
700.20
-204.80
$3.00
($614.40)
Tack coat; complete as
1900
specified
Gallons
56.00
0.00
-56.00
$5.05
$282.80)
5" asphaltic pavement with
10" CABC and grading;
Square
1905
complete as specified
Yards
790.00
667.70
-122.30
$44.65
($5,460.70)
4" asphaltic surface with 6"
CABC and grading; complete
Square
1916
as specified
Yards
240.00
156.20
-83.80
$48.14
$4,034.12)
Furnish and install 10" storm
Linear
2002
sewer; complete as specified
Feet
25.00
20.00
-5.00
$44.50
($222.50)
Furnish and install 12" storm
Linear
2003
sewer; complete as specified
Feet
85.00
69.50
-15.50
$46.50
($720.75)
Furnish and install 15" storm
Linear
2006
sewer; complete as specified
Feet
35.00
34.00
-1.00
$48.50
($48.50)
Furnish; install; maintain; and
remove Type D modified inlet
protection; complete as
2508
specified
Each
2.00
2.00
$150.00
Sediment removal - Type D
modified inlet protection;
2510
complete as specified
Each
2.00
0.00
-2.00
$100.00
($200.00
Furnish; install; maintain; and
remove stone tracking pad;
2512
complete as specified
Each
2.00
0.00
-2.00
$1,500.00
($3,000.00
Furnish; install; maintain, and
remove stone bag; complete
2516
as specified
Each
10.00
0.00
-10.00
$150.00
($1,500.00)
Furnish; install; maintain; and
remove 12" diameter
sediment logs; complete as
Linear
2518
specified
Feet
40.00
10.00
-30.00
$10.00
$300.00)
Furnish; install; maintain; and
remove ditch check;
2522
complete as specified
Each
77.00
66.00
-11.00
$250.00
($2,750.00)
Install salvaged topsoil 6"
Square
2602
depth; complete as specified
Yards
9,184.00
8,851.50
-332.50
$4.00
($1,330.00)
Furnish and install native
seeding; complete as
Square
2610
specified
Yards
9,184.00
13,250.05
4066.05
1
$1.011
$4,106.71
Page 1 of 3
CONTRACT 17-19 CHANGE ORDER #2 FINAL (REVISED)
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
PRICE
PRICE
Furnish and install Class I;
Type A erosion control mat;
Square
2630
complete as specified
Yards
9,184.00
13,250.05
4066.05
$1.85
$7,522.19
Furnish and install 8" sanitary
sewer (new); complete as
Linear
3030
specified
Feet
300.00
298.00
-2.00
$28.20
$56.40)
Furnish and install standard
sanitary sewer manhole (4'
diameter); complete as
Vertical
3100
specified
Feet
14.76
14.00
-0.76
$179.00
($136.04)
Furnish and install internal
sanitary sewer manhole
chimney seal; complete as
3118
specified
Each
1.00
1.00
$382.00
Furnish and install internal
sanitary sewer manhole
chimney seal extension;
3120
complete as specified
Each
1.00
0.00
-1.00
$186.00
$186.00)
Core into existing manhole;
3332
complete as specified
Each
1.00
1.00
1
$990.00
Trenchless 18" sanitary
sewer casing pipe; complete
Linear
3500
as specified
Feet
240.00
240.00
$370.00
Closed circuit televising;
Linear
3700
complete as specified
Feet
300.00
298.00
-2.00
$3.00
($6.00)
Furnish and install new 6"
ductile iron water main with
polywrap; complete as
Linear
4020
specified
Feet
132.00
163.60
31.60
$45.70
$1,444.12
Furnish and install new 16"
ductile iron water main with
polywrap, complete as
Linear
4028
specified
Feet
10,990.00
10,993.00
3.00
$83.42
$250.26
Furnish and install new 16"
ductile iron water main with
polywrap and TR Flex
restrained joints; complete as
Linear
4029
specified
Feet
380.00
380.00
$78.80
Furnish and install
connections to existing 16"
water main; complete as
4066
specified
Each
2.00
2.00
$1,679.00
Furnish and install 16" x 6"
water main tee; complete as
4137
specified
Each
14.00
16.00
2.00
$1,481.00
$2,962.00
Furnish and install 6" 45
degree water main bend;
4236
complete as specified
Each
28.00
20.00
-8.00
$321.00
($2,568.00)
Furnish and install 16" 45
degree water main bend;
4240
complete as specified
Each
14.00
14.00
$1,371.00
Furnish and install 6" water
main gate valve; complete as
4401
specified
Each
14.00
16.00
2.00
$1,086.00
$2,172.00
Furnish and install 16" water
main gate valve; complete as
4405
specified
Each
14.00
16.00
2.00
$7,006.00
$14,012.00
Page 2 of 3
CONTRACT 17-19 CHANGE ORDER #2 FINAL (REVISED)
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
Install the Ripple Avenue
PRICE
PRICE
Furnish and install 16" x 16"
tapping valve and sleeve;
4459
complete as specified
Each
1.00
1.00
$13,788.00
Furnish and install hydrant;
1
4500
complete as specified
Each
14.00
16.00
2.00
$3,362.00
$6,724.00
Jack and bore 30" steel water
main casing pipe; complete
Linear
4704
as specified
Feet
380.00
380.00
$417.00
SECTION (BID ITEMS 1010 - 4704) - SUBTOTAL:
NET INCREASE TO SECTION
ADDITIONAL WORK REQUIRED: CO #1
$42,037.68 ($24,928.83)
$17,108.85
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INGHLA L: IN
DLUHLA�5LIN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
Install the Ripple Avenue
Pressure Regulating Valve
(PRV) Station; complete as
F01
specified
Stations
1.00
1.00
$137,990.00
ADDITIONAL WORK: CO #1 (BID ITEM F01) - SUBTOTAL:
NET DECREASE TO SECTION:
$0.00 $0.00
$0.00
NET INCREASE TO SECTION $17,108.85
NET DECREASE TO SECTION $0.00
NET INCREASE TO CONTRACT: $17,108.85
Page 3 of 3