HomeMy WebLinkAbout10. 19-274 MAY 14, 2019 19-274 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 3 FOR PUBLIC WORKS CONTRACT NO. 17-06 CONCRETE SIDEWALK (NEW AND REHABILITATION) (+$22,719.83) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: AL DIX CONCRETE, INC. 401 Gertrude Street Kaukauna, WI 54130 Net Increase to contract: $22,719.83 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos. 0311-0410-7480-00000 Sidewalk Construction Fund 0317-0410-7480-03304 Special Assessment Fund - Sidewalks 0315-0410-7480-00000 Street Improvement Fund Expenditures 0541-1867-6401-08673 Water Utility- Maintenance of Mains 0541-1867-6401-08675 Water Utility- Maintenance of Services 0321-0410-2186-04706 Contract Control Fund - Sidewalk 0323-0740-7216-06316 Property/Equipment Improvement Fund - Land Improvement 0223-0460-6565-00000 Street Lighting Improvement Fund - Stone/Gravel/Concrete/Asphalt r,A City of Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: May 9, 2019 RE: Change Order No. 3 for Public Works Contract No. 17-06 Concrete Sidewalk (New and Rehabilitation) Al Dix Concrete, Inc. (+$22,719.83) BACKGROUND Change Order No. 3 for Contract 17-06 is scheduled for consideration by the Common Council at the May 14, 2019 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in March of 2017, Change Order No. 1 was approved by the Common Council in September of 2017, and Change Order No. 2 was approved by the Common Council in February of 2018. This change order includes finalizing the contract quantities so they match the field conditions. ANALYSIS Following is a summary of the significant changes to each section of the Capital Improvements Program (CIP): • Sidewalk - Final quantities adjusted to match field conditions. • Water Utility Operating - Final quantities adjusted to match field conditions. • Park Improvements - Final quantities adjusted to match field conditions. 1:\ Engineering \ 2017 CONTRACTS \ 17-06 Sidewalk Page 1 of 2 Prog \ Projed_Information \ Correspondence \ Memo \ 17-06 Memo for CO 713_5-9-19.docx FISCAL IMPACT Contract Section Change Order Amount New Contract Total CIP Budget Amount Concrete Paving $0.00 $72,841.65 $90,000.00 Sanitary Sewer $0.00 $10,098.00 $13,000.00 CIP - Sidewalk $30,757.81 $1,016,582.90 $1,016,825.00 Water Utility Operating -$8,802.10 $195,452.85 $226,352.00 Property Improvements $0.00 $72,090.44 $86,034.00 Park Improvements $764.12 $11,389.12 $11,900.00 Electrical Operating $0.00 $756.00 $756.00 Total $22,719.83 $1,379,210.96 $1,444,867.00 Funding for the sidewalk rehabilitation portion of this change order is being transferred from the Sidewalk CIP section of the Water Main and Lateral Relay project in the 2019 CIP. Funding for the 24th Avenue Boat Launch is available from the Park Improvements section of the 2013 CIP. RECOMMENDATIONS I recommend approval of Change Order No. 3 to Contact No. 17-06 in the amount of +$22,719.83 to Al Dix Concrete, Inc. Approved: Mark A. Rohloff City Manager Jc/t1t I:\Engineering\2017 CONTRACTS \ 17-06 Sidewalk Page 2 of 2 Prog \ Project_Information \ Correspondence \ Memo \ 17-06 Memo for CO #3_5-9-19.docx TO: AL DIX CONCRETE, INC. 401 GERTRUDE STREET KAUKAUNA, WI 54130 CHANGE ORDER #3 (FINAL) DATE: March 28, 2019 Your present contract with the City of Oshkosh, Contract No. 17-06, awarded March 28, 2017, is hereby amended and changed as follows: NET INCREASE TO: SECTION I $22,719.83 CITY OF OSHKOSH BY: City Manager City Clerk Appr ved a accepted: tonirractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller SECTION I TOTALS BID TOTAL $1,041,710.90 $1,041,710.90 CO #1 (N EAGLE ST) $82,939.65 $82,939.65 CO #2 $231,840.58 $231,840.58 PREVIOUS CONTRACT TOTAL $1,356,491.13 $1,356,491.13 CO #3 $22,719.83 $22,719.83 CONTRACT TOTAL $1,379,210.96 $1,379,210.96 CITY OF OSHKOSH BY: City Manager City Clerk Appr ved a accepted: tonirractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney Comptroller CONTRACT 17-06 CHANGE ORDER #3 (FINAL) SECTION I: Work Unit A ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing curb and gutter, Linear A-1110 complete as specified Feet 750.00 1,532.70 782.70 $5.00 $3,913.50 Removing concrete and asphalt sidewalk and driveway, complete as Square A-1120 specified Feet 119,616.28 128,327.00 8,710.72 $1.10 $9,581.79 7" concrete pavement removal and replacement, including sawing, pavement ties, integral curb and fine grading, turf restoration, and traffic control, complete as Square A-1308 specified Yards 1,000.00 153.08 -846.92 $63.00 $53,355.96) 8" concrete pavement removal and replacement, including sawing, pavement ties, integral curb and fine grading, turf restoration, and traffic control, complete as Square A-1318 specified Yards 1,200.00 1,968.95 768.95 $68.00 $52,288.60 8" concrete pavement HES removal and replacement, including sawing, pavement ties, integral curb and fine grading, turf restoration, and traffic control, complete as Square A-1319 specified Yards 500.00 315.77 -184.23 $71.00 $13,080.33 Adjust manholes and inlets, A-1360 complete as specified Each 19.00 0.00 -19.00 $300.00 ($5,700.00 Turf restoration, complete as Square A-1370 specified Yards 1,078.00 324.83 -753.17 $8.00 ($6,025.36 12" radius curb with 6" CABC and grading, complete as Linear A-1410 specified Feet 250.00 0.00 -250.00 $8.00 ($2,000.00 18" curb and gutter, 7" with 5" CABC and grading, complete Linear A-1420 asspecified Feet 250.00 352.00 102.00 $25.00 $2,550.00 30" curb and gutter, 7" with 5" CABC and grading, complete Linear A-1440 asspecified Feet 500.00 1,078.70 578.70 $27.00 $15,624.90 Sidewalk curb, complete as Linear A-1460 specified Feet 445.00 190.00 -255.00 $25.00 $6,375.00 4" concrete sidewalk with 3" CABC and grading, complete Square A-1500 asspecified Feet 73,160.35 80,164.87 1 7,004.52 $3.70 $25,916.72 4" concrete sidewalk with 3" CABC and grading, in existing subdivisions, Square A -1500A complete asspecified Feet 18,000.00 18,175.20 175.20 $4.50 $788.40 4" concrete sidewalk with 3" CABC and grading, water department locations, Square A-1502 complete asspecified Feet 2,000.00 2,236.30 236.30 $7.00 $1,654.10 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading, complete as Square A-1510 specified Feet 55,914.49 58,976.69 3,062.20 $4.00 $12,248.80 Page 1 of 6 CONTRACT 17-06 CHANGE ORDER #3 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading, water department locations, Square A-1512 complete as specified Feet 1,000.00 1,312.50 312.50 $8.00 $2,500.00 8" concrete sidewalk/ driveway/ramp, with 3" CABC and grading, complete as Square A-1520 specified Feet 500.00 2,870.60 2,370.60 $8.00 $18,964.80 Curb ramp detectable warning field (natural/non- painted), complete as Square A-1540 specified Feet 668.00 480.00 -188.00 $30.00 $5,640.00 No. 4 reinforcing rods - deformed, epoxy -coated, Linear A-1550 complete asspecified Feet 1,000.00 3,820.00 2,820.00 $1.10 $3,102.00 Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated, A-1560 Icomplete asspecified Each 10,240.00 7,621.00 -2,619.00 $4.00 ($10,476.00) Cold weather covering (sidewalk) - single visquine, Square A-1580 complete asspecified Feet 1,000.00 89.89 -910.11 $0.05 $45.51 Cold weather covering (sidewalk) - double visquine, Square A-1582 complete asspecified Feet 1,000.00 84.66 -915.34 $0.05 $45.77 Cold weather covering (sidewalk) - double visquine with 6" hay, complete as Square A-1584 specified Feet 500.00 0.00 -500.00 $0.05 $25.00 Up -charge for late season concrete sidewalk, driveway, or ramps, complete as Square A-1590 Ispecified Feet 500.00 1 1,662.81 1,162.81 $1.00 1 $1,162.81 Up -charge for late season concrete pavement, complete Square A-1591 asspecified Yards 500.00 659.65 159.65 $5.00 $798.25 Sawing existing pavement, Linear A-1700 complete asspecified Feet 3,000.00 4,459.10 1,459.10 $3.50 $5,106.85 Profile saw cut concrete curb, Linear A-1720 complete asspecified Feet 150.00 4.00 -146.00 $40.00 $5,840.00 Re -grade existing gravel driveways, complete as A-1820 specified Tons 75.00 0.00 -75.00 $20.00 $1,500.00 4" asphaltic pavement with 10" CABC and grading, Square A-1906 complete asspecified Yards 1,155.00 904.43 -250.57 $45.00 $11,275.65 5" asphaltic surface with 6" CABC and grading, complete Square A-1915 asspecified Yards 500.00 0.00 -500.00 $55.00 $27,500.00 2" asphaltic surface with 6" CABC and grading, complete Square A-1917 asspecified Yards 1 100.00 1 13.20 1 -86.80 1 $45.00 $3,906.00 Page 2 of 6 CONTRACT 17-06 CHANGE ORDER #3 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE /N DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE I DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Remove and replace fence, Linear A-1999 complete ass ecified Each 2.00 0.00 1.00 -2.00 $300.00 $5.00 $600.00 SECTION I - WORK UNIT A (BID ITEMS A-1110 -A-1999) -SUBTOTAL: $156,201.52 ($153,390.58) NET INCREASE TO A: $2,810.94 Work Unit B ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Removing curb and gutter; Linear B-1110 complete as specified Feet 45.00 46.00 1.00 $5.00 $5.00 Removing concrete and asphalt sidewalk and driveway; complete as Square B-1120 Ispecified Feet 1 5,000.00 3,328.40 -1,671.60 $1.10 $1,838.76) Unclassified excavation (sidewalk); complete as Cubic B-1205 specified Yards 50.00 525.00 475.00 $20.00 $9,500.00 Adjust manholes and inlets; B-1360 complete as specified Each 1.00 3.00 2.00 $300.00 $600.00 Turf restoration; complete as Square B-1370 specified Yards 460.00 473.34 13.34 $8.00 $106.72 30" curb and gutter; 7"; with 5" CABC and grading; Linear B-1440 complete as specified Feet 45.00 46.00 1.00 $27.00 $27.00 Sidewalk curb; complete as Linear B-1460 specified Feet 25.00 39.00 14.00 $25.00 $350.00 4" concrete sidewalk with 3" CABC and grading; complete Square B-1500 as specified Feet 9,475.00 10,014.70 539.70 $4.50 $2,428.65 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square B-1510 specified Feet 1,435.00 2,289.90 854.90 $5.00 $4,274.50 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete Square B-1524 asspecified Feet 1,020.00 947.50 -72.50 $5.50 ($398.75) Curb ramp detectable warning field (natural/non- painted); complete as Square B-1540 specified Feet 16.00 24.00 8.00 $30.00 $240.00 Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; B-1560 complete asspecified Each 40.00 20.00 -20.00 $4.00 $80.00 Sawing existing pavement; Linear B-1700 complete asspecified Feet 750.00 917.50 167.50 1 $3.50 $586.25 4" asphaltic pavement LT with 10" CABC and grading; Square B-1906 complete asspecified Yards 100.00 157.67 57.67 $45.00 $2,595.15 5" asphaltic surface MT with 6" CABC and grading; Square B-1915 complete asspecified Yards 508.00 492.78 -15.22 $55.00 $837.10 Page 3 of 6 CONTRACT 17-06 CHANGE ORDER #3 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1-D-1110 Furnish and install standard Feet 18.60 18.60 $5.00 storm sewer inlet manhole (4' diameter); complete as Vertical B-2213 specified Feet 3.50 3.50 190.12 $575.00 $209.13 SECTION I -WORK UNIT B (BID ITEMS B-1110- B-2213) -SUBTOTAL: NET INCREASE TO B: Work Unit C $20,713.27 ($3,154.61) $17,558.66 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER Removing curb and gutter; Linear QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 1-D-1110 Removing concrete and Feet 18.60 18.60 $5.00 asphalt sidewalk and driveway; complete as Square C-1120 specified Feet 300.00 490.12 190.12 $1.10 $209.13 1-D-1120 Unclassified excavation Feet 225.00 225.00 $1.10 (sidewalk); complete as Cubic C-1205 specified Yards 100.00 0.00 -100.00 $20.00 ($2,000.00) Crushed aggregate base course; complete as C-1340 specified Tons 200.00 0.00 -200.00 $15.00 $3,000.00) 30" curb and gutter; 7"; with 5" CABC and grading; Linear C-1440 complete as specified Feet 30.00 0.00 -30.00 $32.00 $960.00) 4" concrete sidewalk with 3" CABC and grading; complete Square C-1500 asspecified Feet 4,700.00 2,764.80 -1,935.20 $4.50 ($8,708.40) 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square C-1510 specified Feet 200.00 3,090.00 2,890.00 $5.00 $14,450.00 Curb ramp detectable warning field (natural/ non -painted); complete as Square C-1540 specified Feet 24.00 16.00 -8.00 $30.00 $240.00) Sawing existing pavement; Linear C 1700 complete as specified Feet 75.00 0.00 -75.00 $3.50 $262.50) 4" asphaltic transition LT with 10" CABC and grading; Square C-1911 complete asspecified Yards 30.00 0.00 -30.00 $45.00 $1,350.00 SECTION I - WORK UNIT C (BID ITEMS C-1120 - C-1911) - SUBTOTAL: NET DECREASE TO C: SECTION I - ADDITIONAL WORK REQUIRED: CO #1 (WORK UNIT D - N EAGLE ST) $14,659.13 ($16,520.90) ($1,861.77) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE Removing curb and gutter; Linear 1-D-1110 complete as specified Feet 18.60 18.60 $5.00 Removing concrete and asphalt sidewalk and driveway; complete as Square 1-D-1120 specified Feet 225.00 225.00 $1.10 Page 4 of 6 CONTRACT 17-06 CHANGE ORDER #3 (FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 8" concrete pavement removal and replacement; including sawing; pavement Square 2-A-1524 ties; integral curb and fine Yards 557.50 557.50 1 $5.50 grading; turf restoration; and traffic control; complete as Square 1-D-1318 specified Yards 1,064.10 1,064.10 $66.00 8" concrete pavement HES removal and replacement; including sawing; pavement Linear 2-B-1318 ties; integral curb and fine Feet 16.67 16.67 $68.00 grading; turf restoration; and traffic control; complete as Square 1-D-1319 specified Yards 140.70 140.70 $69.00 Pavement ties; complete as 1-D-1350 Ispecified Each 8.00 1 8.00 $7.00 30" curb and gutter, 7"; with 5" CABC and grading; Linear 1-D-1440 complete as specified Feet 18.60 18.60 $27.00 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square 1-D-1510 specified Feet 225.00 225.00 $4.00 Curb ramp detectable warning field (natural/non- painted); complete as Square 1-D-1540 specified Feet 8.00 8.00 $30.00 Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; 1-D-1560 complete asspecified Each 4.00 4.00 $4.00 Sawing existing pavement full Linear 1-D-1710 depth; complete asspecified Feet 21.10 21.10 $3.50 Base aggregate dense; 3/4', 1-D-1800 complete ass ecified Tons 62.30 62.30 $14.00 SECTION I - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-D-1110 - 1-D-1800) - SUBTOTAL $0.00 $0.00 NET INCREASE TO D: $0.00 SECTION I - ADDITIONAL WORK REQUIRED: CO #2 ITEM DESCRIPTIONUNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete Square 2-A-1524 asspecified Yards 557.50 557.50 1 $5.50 8" concrete pavement removal and replacement; including sawing; pavement ties; integral curb and fine grading; turf restoration; and traffic control; complete as Linear 2-B-1318 specified Feet 16.67 16.67 $68.00 No. 4 reinforcing rods - deformed, epoxy -coated, Linear 2-C-1550 complete as specified Feet 1,000.00 1,000.00 $1.10 Page 5 of 6 CONTRACT 17-06 CHANGE ORDER #3 (FINAL) ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Drilled No. 4 sidewalk tie bars 3-A-1350 - deformed, epoxy -coated, Each 0.00 468.00 468.00 $9.00 $4,212.00 2-C-1560 complete as specified Each 4.00 4.00 $4.00 SECTION I -(ADDITIONAL WORK REQUIRED: CO #2 ITEMS 2-A-1524 -2-C-1550) -SUBTOTAL NET INCREASE TO: CO #2 SECTION I - ADDITIONAL WORK REQUIRED: CO #3 $0.00 $0.00 $0.00 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Pavement ties; complete as 3-A-1350 specified Each 0.00 468.00 468.00 $9.00 $4,212.00 SECTION I -(ADDITIONAL WORK REQUIRED: CO #3 ITEMS 3-A-1350 -3-A-1524) -SUBTOTAL NET INCREASE TO: CO #3 NET INCREASE TO A NET INCREASE TO B NET DECREASE TO C NET INCREASE TO D NET INCREASE TO ADDITIONAL WORK REQUIRED: NET INCREASE TO CONTRACT: Page 6 of 6 $4,212.00 $0.00 $4,212.00 $2,810.94 $17,558.66 ($1,861.77) $0.00 $4,212.00 $22,719.83