HomeMy WebLinkAbout10. 19-274 MAY 14, 2019 19-274 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER NO. 3 FOR PUBLIC WORKS
CONTRACT NO. 17-06 CONCRETE SIDEWALK (NEW AND
REHABILITATION) (+$22,719.83)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
AL DIX CONCRETE, INC.
401 Gertrude Street
Kaukauna, WI 54130
Net Increase to contract: $22,719.83
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. Nos. 0311-0410-7480-00000 Sidewalk Construction Fund
0317-0410-7480-03304 Special Assessment Fund - Sidewalks
0315-0410-7480-00000 Street Improvement Fund Expenditures
0541-1867-6401-08673 Water Utility- Maintenance of Mains
0541-1867-6401-08675 Water Utility- Maintenance of Services
0321-0410-2186-04706 Contract Control Fund - Sidewalk
0323-0740-7216-06316 Property/Equipment Improvement Fund
- Land Improvement
0223-0460-6565-00000 Street Lighting Improvement Fund -
Stone/Gravel/Concrete/Asphalt
r,A
City
of
Oshkosh
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager / City Engineer
DATE: May 9, 2019
RE: Change Order No. 3 for Public Works Contract No. 17-06
Concrete Sidewalk (New and Rehabilitation)
Al Dix Concrete, Inc. (+$22,719.83)
BACKGROUND
Change Order No. 3 for Contract 17-06 is scheduled for consideration by the Common Council at the
May 14, 2019 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in March of 2017,
Change Order No. 1 was approved by the Common Council in September of 2017, and Change Order
No. 2 was approved by the Common Council in February of 2018.
This change order includes finalizing the contract quantities so they match the field conditions.
ANALYSIS
Following is a summary of the significant changes to each section of the Capital Improvements Program
(CIP):
• Sidewalk - Final quantities adjusted to match field conditions.
• Water Utility Operating - Final quantities adjusted to match field conditions.
• Park Improvements - Final quantities adjusted to match field conditions.
1:\ Engineering \ 2017 CONTRACTS \ 17-06 Sidewalk Page 1 of 2
Prog \ Projed_Information \ Correspondence \ Memo \ 17-06 Memo for CO 713_5-9-19.docx
FISCAL IMPACT
Contract Section
Change Order Amount
New Contract Total
CIP Budget Amount
Concrete Paving
$0.00
$72,841.65
$90,000.00
Sanitary Sewer
$0.00
$10,098.00
$13,000.00
CIP - Sidewalk
$30,757.81
$1,016,582.90
$1,016,825.00
Water Utility Operating
-$8,802.10
$195,452.85
$226,352.00
Property Improvements
$0.00
$72,090.44
$86,034.00
Park Improvements
$764.12
$11,389.12
$11,900.00
Electrical Operating
$0.00
$756.00
$756.00
Total
$22,719.83
$1,379,210.96
$1,444,867.00
Funding for the sidewalk rehabilitation portion of this change order is being transferred from the
Sidewalk CIP section of the Water Main and Lateral Relay project in the 2019 CIP. Funding for the 24th
Avenue Boat Launch is available from the Park Improvements section of the 2013 CIP.
RECOMMENDATIONS
I recommend approval of Change Order No. 3 to Contact No. 17-06 in the amount of +$22,719.83 to Al
Dix Concrete, Inc.
Approved:
Mark A. Rohloff
City Manager
Jc/t1t
I:\Engineering\2017 CONTRACTS \ 17-06 Sidewalk Page 2 of 2
Prog \ Project_Information \ Correspondence \ Memo \ 17-06 Memo for CO #3_5-9-19.docx
TO: AL DIX CONCRETE, INC.
401 GERTRUDE STREET
KAUKAUNA, WI 54130
CHANGE ORDER #3 (FINAL)
DATE: March 28, 2019
Your present contract with the City of Oshkosh, Contract No. 17-06, awarded March 28, 2017, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I
$22,719.83
CITY OF OSHKOSH
BY:
City Manager
City Clerk
Appr ved a accepted:
tonirractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
Comptroller
SECTION I
TOTALS
BID TOTAL
$1,041,710.90
$1,041,710.90
CO #1 (N EAGLE ST)
$82,939.65
$82,939.65
CO #2
$231,840.58
$231,840.58
PREVIOUS CONTRACT TOTAL
$1,356,491.13
$1,356,491.13
CO #3
$22,719.83
$22,719.83
CONTRACT TOTAL
$1,379,210.96
$1,379,210.96
CITY OF OSHKOSH
BY:
City Manager
City Clerk
Appr ved a accepted:
tonirractor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Approved as to form:
City Attorney
Comptroller
CONTRACT 17-06 CHANGE ORDER #3 (FINAL)
SECTION I:
Work Unit A
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Removing curb and gutter,
Linear
A-1110
complete as specified
Feet
750.00
1,532.70
782.70
$5.00
$3,913.50
Removing concrete and
asphalt sidewalk and
driveway, complete as
Square
A-1120
specified
Feet
119,616.28
128,327.00
8,710.72
$1.10
$9,581.79
7" concrete pavement
removal and replacement,
including sawing, pavement
ties, integral curb and fine
grading, turf restoration, and
traffic control, complete as
Square
A-1308
specified
Yards
1,000.00
153.08
-846.92
$63.00
$53,355.96)
8" concrete pavement
removal and replacement,
including sawing, pavement
ties, integral curb and fine
grading, turf restoration, and
traffic control, complete as
Square
A-1318
specified
Yards
1,200.00
1,968.95
768.95
$68.00
$52,288.60
8" concrete pavement HES
removal and replacement,
including sawing, pavement
ties, integral curb and fine
grading, turf restoration, and
traffic control, complete as
Square
A-1319
specified
Yards
500.00
315.77
-184.23
$71.00
$13,080.33
Adjust manholes and inlets,
A-1360
complete as specified
Each
19.00
0.00
-19.00
$300.00
($5,700.00
Turf restoration, complete as
Square
A-1370
specified
Yards
1,078.00
324.83
-753.17
$8.00
($6,025.36
12" radius curb with 6" CABC
and grading, complete as
Linear
A-1410
specified
Feet
250.00
0.00
-250.00
$8.00
($2,000.00
18" curb and gutter, 7" with 5"
CABC and grading, complete
Linear
A-1420
asspecified
Feet
250.00
352.00
102.00
$25.00
$2,550.00
30" curb and gutter, 7" with 5"
CABC and grading, complete
Linear
A-1440
asspecified
Feet
500.00
1,078.70
578.70
$27.00
$15,624.90
Sidewalk curb, complete as
Linear
A-1460
specified
Feet
445.00
190.00
-255.00
$25.00
$6,375.00
4" concrete sidewalk with 3"
CABC and grading, complete
Square
A-1500
asspecified
Feet
73,160.35
80,164.87
1 7,004.52
$3.70
$25,916.72
4" concrete sidewalk with 3"
CABC and grading, in
existing subdivisions,
Square
A -1500A
complete asspecified
Feet
18,000.00
18,175.20
175.20
$4.50
$788.40
4" concrete sidewalk with 3"
CABC and grading, water
department locations,
Square
A-1502
complete asspecified
Feet
2,000.00
2,236.30
236.30
$7.00
$1,654.10
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading, complete as
Square
A-1510
specified
Feet
55,914.49
58,976.69
3,062.20
$4.00
$12,248.80
Page 1 of 6
CONTRACT 17-06 CHANGE ORDER #3 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading, water
department locations,
Square
A-1512
complete as specified
Feet
1,000.00
1,312.50
312.50
$8.00
$2,500.00
8" concrete sidewalk/
driveway/ramp, with 3" CABC
and grading, complete as
Square
A-1520
specified
Feet
500.00
2,870.60
2,370.60
$8.00
$18,964.80
Curb ramp detectable
warning field (natural/non-
painted), complete as
Square
A-1540
specified
Feet
668.00
480.00
-188.00
$30.00
$5,640.00
No. 4 reinforcing rods -
deformed, epoxy -coated,
Linear
A-1550
complete asspecified
Feet
1,000.00
3,820.00
2,820.00
$1.10
$3,102.00
Drilled No. 4 sidewalk tie bars
- deformed, epoxy -coated,
A-1560
Icomplete asspecified
Each
10,240.00
7,621.00
-2,619.00
$4.00
($10,476.00)
Cold weather covering
(sidewalk) - single visquine,
Square
A-1580
complete asspecified
Feet
1,000.00
89.89
-910.11
$0.05
$45.51
Cold weather covering
(sidewalk) - double visquine,
Square
A-1582
complete asspecified
Feet
1,000.00
84.66
-915.34
$0.05
$45.77
Cold weather covering
(sidewalk) - double visquine
with 6" hay, complete as
Square
A-1584
specified
Feet
500.00
0.00
-500.00
$0.05
$25.00
Up -charge for late season
concrete sidewalk, driveway,
or ramps, complete as
Square
A-1590
Ispecified
Feet
500.00
1 1,662.81
1,162.81
$1.00
1 $1,162.81
Up -charge for late season
concrete pavement, complete
Square
A-1591
asspecified
Yards
500.00
659.65
159.65
$5.00
$798.25
Sawing existing pavement,
Linear
A-1700
complete asspecified
Feet
3,000.00
4,459.10
1,459.10
$3.50
$5,106.85
Profile saw cut concrete curb,
Linear
A-1720
complete asspecified
Feet
150.00
4.00
-146.00
$40.00
$5,840.00
Re -grade existing gravel
driveways, complete as
A-1820
specified
Tons
75.00
0.00
-75.00
$20.00
$1,500.00
4" asphaltic pavement with
10" CABC and grading,
Square
A-1906
complete asspecified
Yards
1,155.00
904.43
-250.57
$45.00
$11,275.65
5" asphaltic surface with 6"
CABC and grading, complete
Square
A-1915
asspecified
Yards
500.00
0.00
-500.00
$55.00
$27,500.00
2" asphaltic surface with 6"
CABC and grading, complete
Square
A-1917
asspecified
Yards
1 100.00
1 13.20
1 -86.80
1 $45.00
$3,906.00
Page 2 of 6
CONTRACT 17-06 CHANGE ORDER #3 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE /N
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
I DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Remove and replace fence,
Linear
A-1999
complete ass ecified
Each
2.00
0.00
1.00
-2.00
$300.00
$5.00
$600.00
SECTION I - WORK UNIT A (BID ITEMS A-1110 -A-1999) -SUBTOTAL: $156,201.52 ($153,390.58)
NET INCREASE TO A: $2,810.94
Work Unit B
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Removing curb and gutter;
Linear
B-1110
complete as specified
Feet
45.00
46.00
1.00
$5.00
$5.00
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
B-1120
Ispecified
Feet
1 5,000.00
3,328.40
-1,671.60
$1.10
$1,838.76)
Unclassified excavation
(sidewalk); complete as
Cubic
B-1205
specified
Yards
50.00
525.00
475.00
$20.00
$9,500.00
Adjust manholes and inlets;
B-1360
complete as specified
Each
1.00
3.00
2.00
$300.00
$600.00
Turf restoration; complete as
Square
B-1370
specified
Yards
460.00
473.34
13.34
$8.00
$106.72
30" curb and gutter; 7"; with
5" CABC and grading;
Linear
B-1440
complete as specified
Feet
45.00
46.00
1.00
$27.00
$27.00
Sidewalk curb; complete as
Linear
B-1460
specified
Feet
25.00
39.00
14.00
$25.00
$350.00
4" concrete sidewalk with 3"
CABC and grading; complete
Square
B-1500
as specified
Feet
9,475.00
10,014.70
539.70
$4.50
$2,428.65
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
B-1510
specified
Feet
1,435.00
2,289.90
854.90
$5.00
$4,274.50
8" concrete sidewalk/
driveway/ramp (HES) with 3"
CABC and grading; complete
Square
B-1524
asspecified
Feet
1,020.00
947.50
-72.50
$5.50
($398.75)
Curb ramp detectable
warning field (natural/non-
painted); complete as
Square
B-1540
specified
Feet
16.00
24.00
8.00
$30.00
$240.00
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
B-1560
complete asspecified
Each
40.00
20.00
-20.00
$4.00
$80.00
Sawing existing pavement;
Linear
B-1700
complete asspecified
Feet
750.00
917.50
167.50
1
$3.50
$586.25
4" asphaltic pavement LT
with 10" CABC and grading;
Square
B-1906
complete asspecified
Yards
100.00
157.67
57.67
$45.00
$2,595.15
5" asphaltic surface MT with
6" CABC and grading;
Square
B-1915
complete asspecified
Yards
508.00
492.78
-15.22
$55.00
$837.10
Page 3 of 6
CONTRACT 17-06 CHANGE ORDER #3 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
1-D-1110
Furnish and install standard
Feet
18.60
18.60
$5.00
storm sewer inlet manhole (4'
diameter); complete as
Vertical
B-2213
specified
Feet
3.50
3.50
190.12
$575.00
$209.13
SECTION I -WORK UNIT B (BID ITEMS B-1110- B-2213) -SUBTOTAL:
NET INCREASE TO B:
Work Unit C
$20,713.27 ($3,154.61)
$17,558.66
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
Removing curb and gutter;
Linear
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
1-D-1110
Removing concrete and
Feet
18.60
18.60
$5.00
asphalt sidewalk and
driveway; complete as
Square
C-1120
specified
Feet
300.00
490.12
190.12
$1.10
$209.13
1-D-1120
Unclassified excavation
Feet
225.00
225.00
$1.10
(sidewalk); complete as
Cubic
C-1205
specified
Yards
100.00
0.00
-100.00
$20.00
($2,000.00)
Crushed aggregate base
course; complete as
C-1340
specified
Tons
200.00
0.00
-200.00
$15.00
$3,000.00)
30" curb and gutter; 7"; with
5" CABC and grading;
Linear
C-1440
complete as specified
Feet
30.00
0.00
-30.00
$32.00
$960.00)
4" concrete sidewalk with 3"
CABC and grading; complete
Square
C-1500
asspecified
Feet
4,700.00
2,764.80
-1,935.20
$4.50
($8,708.40)
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
C-1510
specified
Feet
200.00
3,090.00
2,890.00
$5.00
$14,450.00
Curb ramp detectable
warning field (natural/
non -painted); complete as
Square
C-1540
specified
Feet
24.00
16.00
-8.00
$30.00
$240.00)
Sawing existing pavement;
Linear
C 1700
complete as specified
Feet
75.00
0.00
-75.00
$3.50
$262.50)
4" asphaltic transition LT with
10" CABC and grading;
Square
C-1911
complete asspecified
Yards
30.00
0.00
-30.00
$45.00
$1,350.00
SECTION I - WORK UNIT C (BID ITEMS C-1120 - C-1911) - SUBTOTAL:
NET DECREASE TO C:
SECTION I - ADDITIONAL WORK REQUIRED: CO #1 (WORK UNIT D - N EAGLE ST)
$14,659.13 ($16,520.90)
($1,861.77)
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT PRICE
DECREASE IN
CONTRACT PRICE
Removing curb and gutter;
Linear
1-D-1110
complete as specified
Feet
18.60
18.60
$5.00
Removing concrete and
asphalt sidewalk and
driveway; complete as
Square
1-D-1120
specified
Feet
225.00
225.00
$1.10
Page 4 of 6
CONTRACT 17-06 CHANGE ORDER #3 (FINAL)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
8" concrete pavement
removal and replacement;
including sawing; pavement
Square
2-A-1524
ties; integral curb and fine
Yards
557.50
557.50
1
$5.50
grading; turf restoration; and
traffic control; complete as
Square
1-D-1318
specified
Yards
1,064.10
1,064.10
$66.00
8" concrete pavement HES
removal and replacement;
including sawing; pavement
Linear
2-B-1318
ties; integral curb and fine
Feet
16.67
16.67
$68.00
grading; turf restoration; and
traffic control; complete as
Square
1-D-1319
specified
Yards
140.70
140.70
$69.00
Pavement ties; complete as
1-D-1350
Ispecified
Each
8.00
1 8.00
$7.00
30" curb and gutter, 7"; with
5" CABC and grading;
Linear
1-D-1440
complete as specified
Feet
18.60
18.60
$27.00
6" concrete sidewalk/
driveway/ramp with 3" CABC
and grading; complete as
Square
1-D-1510
specified
Feet
225.00
225.00
$4.00
Curb ramp detectable
warning field (natural/non-
painted); complete as
Square
1-D-1540
specified
Feet
8.00
8.00
$30.00
Drilled No. 4 sidewalk tie bars
- deformed; epoxy -coated;
1-D-1560
complete asspecified
Each
4.00
4.00
$4.00
Sawing existing pavement full
Linear
1-D-1710
depth; complete asspecified
Feet
21.10
21.10
$3.50
Base aggregate dense; 3/4',
1-D-1800
complete ass ecified
Tons
62.30
62.30
$14.00
SECTION I - (ADDITIONAL WORK REQUIRED: CO #1 ITEMS 1-D-1110 - 1-D-1800) - SUBTOTAL $0.00 $0.00
NET INCREASE TO D: $0.00
SECTION I - ADDITIONAL WORK REQUIRED: CO #2
ITEM
DESCRIPTIONUNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
8" concrete sidewalk/
driveway/ramp (HES) with 3"
CABC and grading; complete
Square
2-A-1524
asspecified
Yards
557.50
557.50
1
$5.50
8" concrete pavement
removal and replacement;
including sawing; pavement
ties; integral curb and fine
grading; turf restoration; and
traffic control; complete as
Linear
2-B-1318
specified
Feet
16.67
16.67
$68.00
No. 4 reinforcing rods -
deformed, epoxy -coated,
Linear
2-C-1550
complete as specified
Feet
1,000.00
1,000.00
$1.10
Page 5 of 6
CONTRACT 17-06 CHANGE ORDER #3 (FINAL)
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Drilled No. 4 sidewalk tie bars
3-A-1350
- deformed, epoxy -coated,
Each
0.00
468.00
468.00
$9.00
$4,212.00
2-C-1560
complete as specified
Each
4.00
4.00
$4.00
SECTION I -(ADDITIONAL WORK REQUIRED: CO #2 ITEMS 2-A-1524 -2-C-1550) -SUBTOTAL
NET INCREASE TO: CO #2
SECTION I - ADDITIONAL WORK REQUIRED: CO #3
$0.00 $0.00
$0.00
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASE IN
DECREASE IN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT PRICE
CONTRACT PRICE
Pavement ties; complete as
3-A-1350
specified
Each
0.00
468.00
468.00
$9.00
$4,212.00
SECTION I -(ADDITIONAL WORK REQUIRED: CO #3 ITEMS 3-A-1350 -3-A-1524) -SUBTOTAL
NET INCREASE TO: CO #3
NET INCREASE TO A
NET INCREASE TO B
NET DECREASE TO C
NET INCREASE TO D
NET INCREASE TO ADDITIONAL WORK REQUIRED:
NET INCREASE TO CONTRACT:
Page 6 of 6
$4,212.00 $0.00
$4,212.00
$2,810.94
$17,558.66
($1,861.77)
$0.00
$4,212.00
$22,719.83