Loading...
HomeMy WebLinkAbout09. 19-273 MAY 14, 2019 19-273 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT FOR SAWYER CREEK WATERSHED STORM WATER MANAGEMENT PLAN UPDATE / STRAND ASSOCIATES, INC. (+$30,000.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City and Strand Associates, Inc. previously entered into a professional services agreement in which Strand for updating the storm water management plan for the Sawyer Creek Watershed; and WHEREAS, additional services requested by City staff include: adding up to sixty (60) detention basins into the H & H model, preparing sensitivity analysis, updating the H&H models to modify the floodway,floodplain, and flood storage maps, assisting City with options to move forward with mapping without adopting flood storage districts in the County, and communicating with the Federal Emergency Management Agency and the Wisconsin Department of Natural Resources. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are authorized and directed pursuant to Section 12-16 of the Municipal Code to enter into an amended agreement with Strand Associates, Inc. and said City officials are authorized and directed to take those steps necessary to implement the terms and conditions of the final agreement. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 0561-2010-1799-00000 Storm Utility- Construction in Progress j} STRAND ASS0CIATES=' 1ECEIVED A�R�42ti19 tC WORKS UOJ)TS C� ti ,)13h `tiC()N`�1N April 4, 2019 Mr. James Rabe, P.E., CPESC, Director of Public Works City of Oshkosh—Storm Water Utility 215 Church Avenue Oshkosh, WI 54903-1130 Strand Associates, Inc® 910 West Wingra Drive Madison, Wi 53715 (() 608-251-4843 (F)608-251-8655 Re: Amendment No. 1 to the Engineering Services Proposal dated December 9, 2016 Sawyer Creek Watershed Stormwater Management Plan Update Dear Mr. Rabe: This is Amendment No. 1 to the referenced Proposal. Under Scope of Services, ADD the following: "14. Add up to 60 basins provided by City with 0.7 acre-feet or more of storage into the hydrology and hydraulic (H&H) model (approximate fee $7,500). 15. Prepare a sensitivity analysis of the minimum size of basins to remain in H&H model and be included in the flood storage districts (approximate fee $2,500). 16. Update the H&H models to modify the floodway, floodplain, and flood storage district maps after preparing the sensitivity analysis (approximate fee $5,000). 17. Assist City with options to move forward with mapping without adopting flood storage districts in the County (approximate fee $10,000). 18. Communicate with FEMA and WDNR regarding mapping options if flood storage districts in the County are not adopted (approximate fee $5,000)." Under Compensation, CHANGE $182,500 to "$212,500." Under Schedule, CHANGE December 31, 2017, to "June 30, 2019." Sincerely, STRAND ASSOCIATES, INC. r� Matthew A. Yentz, P.E. MAY:®c:mro\R:\MAD\Documems\Agreements\O\Oshkosh, City of(WD\SawyetCreekWatershedStormwaterMgmt2016WgrWnd\1382.071.I.Prysl.docz Arizona I l,linois 1 Indiana I Kentuclej 1 Ohio I Texas 1 Wisconsin wvrw.strand.eom City o� Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Co n Council FROM: James Rabe, Director of Public Works DATE: May 9, 2019 RE: Approve Amendment to Professional Services Agreement for Sawyer Creek Watershed Storm Water Management Plan Update / Strand Associates, Inc. (Strand) ($30,000) BACKGROUND A professional services agreement with Strand for updating the storm water management plan for the Sawyer Creek Watershed was approved by the Common Council on December 13, 2016. During the course of the project, additional services were requested by City staff. ANALYSIS The additional services requested include: Adding up to sixty (60) detention basins into the hydrology and hydraulic (H & H) model, preparing a sensitivity analysis of the minimum size of basins to remain in and be included in the flood storage districts, updating the H & H models to modify the floodway, floodplain, and flood storage district maps, assisting City with options to move forward with mapping without adopting flood storage districts in the County, and communicating with the Federal Emergency Management Agency and the Wisconsin Department of Natural Resources regarding mapping options if flood storage districts in the County are not adopted. FISCAL IMPACT Staff has reviewed the amendment and the costs. The amount of this amendment is not to exceed $30,000. This will raise the total agreement amount to $212,500. Funds for this project are included in the Storm Water section of the 2017 Capital Improvement Program. I:\Engineering\2017 CONTRACTS\17-09 Sawyer Page 1 of 2 Crk \ Project_Informa tion \ Correspondence \ Memo \ 17-09 Strand CA #1 -Sawyer Crk Wtrshed SWMP Update_5-9-19.docx RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed the amendment and in accordance with Section 12-16 of the Code, I am hereby recommending the Common Council approve this amendment. Approved, Mark A. Rohloff City Manager JG/t1t I:\Engineering\2017 CONTRACTS\17-09 Sawyer Page 2 of 2 Crk\Project_Information\Correspondence \ Memo \17-09 Strand CA #1 -Sawyer Crk Wtrshed SWMP Update_5-9-19.docx