HomeMy WebLinkAbout0105708-PlumbingOSHKOSH
ON THE WATER
.lob Address 1901 ALGOMA BLVD
Contractor 4WAY CONSTRUCTION
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Lndry Stndp
Res. Sink 0 Disposal
Bar Sink 0 Dishwasher
Water Heater 0 Sump Pump
Site Drain 0 Classrm Sink
Roof Drain 0 Breakrm Sink
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CITY OF OSHKOSH
Category 430 - Industrial-Exterior (laterals)
No 105708
Create Date 12/10/2003
Plan
0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
0 WaterSoftner 0 Drink Ftn 0 ServSink 0 Soda Disp 0
0 Local Waste 0 Wait. St. 0 ShampSink 0 Coffee Maker 0
0 CIothesWshr 0 Ice Chest 0 FIrNVst Sink 0 Int Grease Trap 0
0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
0 Beer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0
0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Use/Nature
of Work
RELAY SAN SEW
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type
6 Plastic Lateral
# Conn. Type
0
0
1 Relay
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $2,100.00 Plan Approval $0.00 Permit Fees $0.00 ~ Permit Voided
Issued By
Date
12/10/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address P.O. BOX 133 BERLIN WI 54923 - 0133 Telephone Number
920-361-1403
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.