Loading...
HomeMy WebLinkAbout2003-Building (wheelchair ramp) € 141 74") CITY OF OSHKOSH No 10559401— �U j( 12004 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Orr Job Address 1443 W 3RD AVE Owner FRANK/SHERRY HEISLER 11I Create Date 12/04/2003 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished /Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ❑ Projection Finished /Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use /Nature SFR/ LATE PERMIT/ Installation of a wheelchair ramp. The ramp has been constructed without frost protection and the owner is in of Work agreement to fix any racking problems due to frost. The grade of the property shall not affect the neighboring properties. Denise Bellmore was the contractor hired for the work. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,500.00 Plan Approval $0.00 Permit Fee Paid $45.00 Park Dedication $0.00 Issued By: Date 12/04/2003 Final /O.P. 00 /00 /0000 ❑ Permit Voided In the performance of this work 1 agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. ) Signature ,? ' t—.<- 74- Date X l2ly /G Agent/Owner / // Address 1443 W 3RD AVE OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.