Loading...
HomeMy WebLinkAbout0105531 BOSHKOSH ON THE WATER .lob Address 1103 E PARKWAY AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner PETER J E WESTORT/MARYANN OFF Contractor STANLEY LEACH-BUILDER Category 140 - Interior Remodeling No 105531 Create Date 12/02/2003 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Repairing the floor and the wall behind the tub in the bathroom and installing a "solar tube." of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor *CALLIES JACK* $2,900.00 Plan Approval $0.00 Permit Fee Paid $30.00 Park Dedication $0.00 Date 12/02/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 5099 SHERMAN RD OSHKOSH WI 54901 - 9755 Telephone Number 235-2530 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.