HomeMy WebLinkAbout0105581-BuildingOSHKOSH
ON THE WATER
.lob ,Address 3300 N MAIN ST
Designer Raasch Associates
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner WIS PUBLIC SERVICE CORP
Contractor MIRON CONSTRUCTION CO INC
Category 211 - Alteration Industrial
No 105581
Create Date 11/26/2003
Plan J9-125-1203
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: liB Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature Office & Shop/Remodel office area per State Transaction ID # 935911
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
UNKNOWN????
$30,421.00 Plan Approval $0.00
Plumbing Contractor
Permit Fee Paid
$128.00 Park Dedication $0.00
Date 12/03/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 509 NEENAH WI 54957 - 0509 Telephone Number 920-969-7053
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.