Loading...
HomeMy WebLinkAbout2003-Building (sign)OSHKOSH ON THE WATER Job Address 804 WITZEL AVE Designer Category 254 - Signs Type ~) Building · Sign Zoning Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation C) Poured Concrete C) Floating Slab C) concrete Block · Post CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner AUTO AUTHORITY Contractor BECK SIGNS Raze 0 Ft. C) Canopy C) Fence Class of Const: Rooms 0 Height Bedrooms 0 Stories Baths 0 O Pier O Other (~ Treated Wood No 104660 Create Date 10/08/2003 Plan Occupancy Permit Not Required Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures Use/Nature ~,uto Repair/Install a 18' tall pylon sign with 4x6 ilium sign cabinet. * Sign is being relocated from former location. of Work Size [] Projection Canopies 0 Signs 0 HVAC Contractor Electric Contractor Fees: Valuation ~$900.00 Issued By: Plan Approval $0.00 Permit Fee Paid [] Permit Voided Plumbing Contractor $20.00 Park Dedication $0.00 Date 10/08/2003 Final/O.P. 00/00/0000 In the pedormance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessaw approvals before starting such activity. Signature Date Address 2269 ALLERTON DR. Agen~Owner OSHKOSH WI 54904 - 0000 Telephone Number 231-1160 To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (Lc. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.