Loading...
HomeMy WebLinkAbout0104526-Plumbing (water heater)OSHKOSH ON THE WATER Job Address 1330 OTTER AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner MILDRED P LAMERE Category 411 - Residential-Water Heatem Bathtub 0 Shower 0 Ejector/Grtnd 0 DipWell 0 F Prep Sink Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 104526 Create Date 10/01/2003 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Iht Grease Trap 0 0 Ext GreaseTrap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work DUPLEX/Replace gas water heater. Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $450.00 Plan Approval $0.00 Permit Fees $20.00 _~ Permit Voided Issued By Date 10/02/2003 In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.