HomeMy WebLinkAbout0104526-Plumbing (water heater)OSHKOSH
ON THE WATER
Job Address 1330 OTTER AVE
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MILDRED P LAMERE
Category 411 - Residential-Water Heatem
Bathtub 0 Shower 0 Ejector/Grtnd 0 DipWell 0 F Prep Sink
Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink
Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink
Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink
Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin
Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn
Water Heater 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec
Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
No 104526
Create Date 10/01/2003
Plan
0 Gar Drain 0
0 Soda Disp 0
0 Coffee Maker 0
0 Iht Grease Trap 0
0 Ext GreaseTrap 0
0 RPZ Valve 0
0 Eye Wash Statn 0
0
0
Use/Nature
of Work
DUPLEX/Replace gas water heater.
Sanitary Sewer
Storm Sewer
Water Service
Size Material Type #
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Valuation $450.00 Plan Approval $0.00 Permit Fees $20.00 _~ Permit Voided
Issued By
Date 10/02/2003
In the pertormance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Date
Signature
Address 522 W. MURDOCK AVE
Agent/Owner
OSHKOSH WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.