Loading...
HomeMy WebLinkAbout0104540-Plumbing (kitchen sink)OSHKOSH ON THE WATER Job Address 404 S MEADOW ST Contractor SAMMONS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 1 Disposal Bar Sink 0 Dishwasher Water Heater 0 Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Breakrm Sink Use/Nature ~SFPJ Install kitchen sink. of Work CITY OF OSHKOSH No 104540 PLUMBING PERMIT -APPLICATION AND RECORD Owner WALLACE/SANDRA GREENMAN FAM.TRUST Create Date 10/02/2003 Category 410- Residential-Interior Plan 0 Ejector/Grtad 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 0 Water Softner 0 Drink Ftn 0 ServSink 0 Soda Disp 0 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int Grease Trap 0 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Seer Tap 0 SculrySink 0 Wash Ftn 0 RPZValve 0 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Size Sanitary Sewer Storm Sewer Water Service Valuation $700.00 Plan Approval $0.00 Permit Fees Issued By Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit VoidedI Date 10/02/2003 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.