HomeMy WebLinkAbout0104538-Plumbing (water meter) OSHKOSH
ON THE WATER
,Job Address 2440 HICKORY LN
Contractor SAMMONS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Use/Nature I~FR/
of Work
CITY OF OSHKOSH
Create Date
Plan
PLUMBING PERMIT - APPLICATION AND RECORD
Owner FLORENCE E T PETERSEN LIVING TRUS
Category 411 - Residential-Water Heaters
0 Gar Drain
0 Soda Disp
0 Coffee Maker
0_ Iht Grease Trap
0 Ext Grease Trap
0 RPZ Valve
0 Eye Wash Statn
0
0
0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink
0 Floor Drain 0 Water Soffner 0 Drink Ftn 0 Serv Sink
0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink --
0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink --
0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin --
0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn
I Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal
0 Ctassrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec --
0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker
Install gas water heater.
No t04538
10/02/2003
0
0
0
0
0
0
0
Valuation
Issued By
I Size Material Type #
Sanitary Sewer
Storm Sewer
Water Service
$450.00 Plan Approval $0.00 Permit Fees
Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 [] Permit Voided
Date 10/02/2003
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of OshkoSh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
AgenFOwner
Address 522W. MURDOCKAVE OSHKOSH W~I 54901 . - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.