Loading...
HomeMy WebLinkAbout0104543-Plumbing (water heater) OSHKOSH ON THE WATER Job Address 2342ALLERTON DR Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Use/Nature IFR/ of Work CITY OF OSHKOSH Create Date Plan PLUMBING PERMIT - APPLICATION AND RECORD Owner GARY R WERNER Category 411 ~ ResidentJal-Watar Heaters No 104543 1010212003 0 Shower 0 Ejector/Grind 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 LndryTray 0 LocaIWaste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 LndryStndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink 0 Int GreaseTrap -- 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Dishwasher 0 BeerTap 0 SculrySink 0 WashFtn 0 RPZValve 1 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn' 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 install gas water heater. 0 0 0 0 0 0 0 Size Material Type # Sanitary Sewer Storm Sewer Water Service Valuation $450.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 [] Permit Voided Date 10/02/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgentJOwner Address 522W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5'128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.