Loading...
HomeMy WebLinkAbout2003-Building (fence)OSHKOSH ON THE WATER .lob Address 4041 PRAIRIE LN Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID J/JOANN C BORLEE Contractor OWNER No 105491 Create Date 11/28/2003 Category 251 - Fences Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Garage 0 Sq. Ft. Baths 0 Foundation (~ Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Size ~J Projection I Canopies 0 Signs 0 Use/Nature Fence/Install 6ft high wood fence to enclose rear yard as per plan. Fence may not obstruct Storm Water Drainage. If fence is to provide of Work ~rotection for a pool - the gates shall be self closeing, self latching. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $1,083.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 11/28/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 4041 PRAIRIE LN OSHKOSH WI 54901 - 1283 Telephone Number 233-3042 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. C l,�es'� L�' G4h e / b i . 3k �/eL oi-o 1 l�cc I feS Al e u.) -4,n . 3 CO4e. ,7 - / _ o. } R�tc' 17'70 0 6d-e ..v ,; /-'* firirliY = xx) 4'etic _ — A r ____ '. t v c _i__,,,_,_.------- f' 1,4)V , ' ,/�'f / / aff/ 4 QS005# 5 :597 - /?). i 1_ .ret! v