HomeMy WebLinkAbout0105405-Building (basement remodel) � CITY OF OSHKOSH No �osaos :
� �
d nx����GO� !E
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD �. ,,� _ �'i:
ON THE WATER
Job Address 2480 SECURITY DR Owner JOHN A/AMY T SCHIEK Create Date 11/20/2003
Designer Contractor DAVIS CONCRETE CONSTRUCTION
Category 140-Interior Remodeling Plan
Type � Building 0 Sign � Canopy � Fence _ � Raze ;,
Zoning Class of Const: Size
Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection
Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq.Ft. Baths 0 Signs 0
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post 0 Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature j�FR/Remodeling the basement to create a family room,play room,and bathroom.
of Work
I
I
i
HVAC Contractor BREWER HEATING Plumbing Contractor COMPLETE PLUMBING INC
Electric Contractor CUMINGS ELECTRIC
Fees: Valuation $12,300.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00
Issued By:�-- Date 11/20/2003 Final/O.P. 00/00/0000
� Permit Voided ''',
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit appli ' n within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and t re ny n a y�pr Is before starting such activity.
la.— 1! U D
Signature V Dat�
AgenUOwner �
Address 2740 LEILA MAE LN OSHKOSH WI 54902 - 0000 Telephone Number 426-3339 426-1609
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
t