HomeMy WebLinkAbout13. 19-167 MARCH 26, 2019 19-167 RESOLUTION (CARRIED 7-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 18-06 CONCRETE SIDEWALK (NEW AND REHABILITATION /AL DIX CONCRETE, INC. (+$300,691.64) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: AL DIX CONCRETE, INC. 401 Gertrude Street Kaukauna, WI 54130 Net Increase to Contract: $300,691.64 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos. 0321-0410-6809-04904 Contract Control Fund -Traffic 0311-0410-7480-00000 Sidewalk Construction Fund 0317-0410-7480-03304 Special Assessment Fund - Sidewalks 0315-0410-7480-00000 Street Improvement Fund Expenditures 0317-0410-7480-03301 Special Assessments Fund - Streets 0541-1810-1799-00000 Water Utility- Construction in Progress 0541-1867-6401-08673 Water Utility- Maintenance of Mains 0541-1867-6401-08675 Water Utility- Maintenance of Services MARCH 26, 2019 19-167 RESOLUTION CONT'D 0322-1040-7216-05801 Enterprise Capital Fund - Land Improvement 0323-0740-7216-06516 Property/Equipment Improvement Fund Land Improvement 0321-0410-6806-04806 Contract Control Fund - Sidewalk 0321-0410-6801-04806 Contract Control Fund - Paving 0536-1040-7216 TIF#21/Land Improvement 0323-0801-6542-06803 Property/Equipment Improvement Fund - Traffic Signal Materials City fV Oshkosh MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer -a T DATE: March 21, 2019 RE: Change Order No.1 for Public Works Contract No. 18-06 Concrete Sidewalk (New and Rehabilitation) Al Dix Concrete, Inc. (+$300,691.64) BACKGROUND Change Order No. 1 for Contract 18-06 is scheduled for consideration by the Common Council at the March 26, 2019 meeting. The contract was originally awarded to Al Dix Concrete, Inc. in March of 2018. This change order adjusts quantities to match the necessary installation in the field and accounts for additional work that was requested during the course of construction. ANALYSIS Following is a summary of the significant changes to each section of the CIP/Operating Budget: • Streets - Additional restoration adjacent to handicap curb ramps and driveways and adjusting quantities to match field conditions. • Sidewalk - Additional sidewalk and driveways within the dense downtown area, construction of a ramp to assist in moving the voting equipment, and adjusting quantities to match field conditions. • Water Utility Operating Budget - Quantities adjusted to match field conditions. • Property Improvements - Quantities adjusted to match field conditions. • Community Development - Quantities adjusted to match field conditions, as well as additional work to install sidewalk for the Riverwalk off of Marion Road. • Traffic CIP - Extra work to pour new light bases adjacent to sidewalk being reconstructed within the rehabilitation area. I:\Engineering\2018 CONTRACTS\18-06 Sidewalk Page 1 of 2 Rehab \ Project_Information \ Correspondence \ Memo \ 18-06 Memo for CO 41_3-21-19.docx FISCAL IMPACT Note: Water Utility Operating Budget contains $1,029,200 for maintenance of Mains and Services. Only the amount needed for repairing concrete pavement is shown as the funds are used for all maintenance items. Note: the budget lines item denoted with an asterisk (*) include budget transfers from other projects that have come in under budget or are anticipated to come in under budget. Funding for the additional costs related to the Property Improvements — Community Development is available under TIF #21. Funding for the concrete work for the light bases is available in the Traffic Signal Equipment project in the 2018 CIP. Funding for the additional street and sidewalk costs is available from previous projects coming under budget. Property owners are invoiced for the cost of sidewalk and driveway apron repairs abutting their property. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 18-06 in the amount of +$300,691.64 to Al Dix Concrete, Inc. Approved: 91!�7 John Fitzpatric - Assistant City Manager / Director of Administrative Services JG/ttt I:\Engineering\2018 CONTRACTS\18-06 Sidewalk Page 2 Of 2 Rehab \ Project_fnformation \ Correspondence \ Memo \ 18-06 Memo for CO 171_3-21-19.docx Estimated Total CIP Section Change Order Amount Construction Cost CIP Budget Amount CIP - Street $110,936.66 $312,296.06 *$313,000.00 CIP - Sidewalk $230,834.85 $1,201,615.03 *$1,202,000.00 Water Utility Operating -$10,961.25 $206,747.91 $220,000.00 Property Improvements - Community Development $1,015.00 $4,825.45 $5,050.00 Property Improvements - General Services -$32,134.12 $35,400.27 $75,000.00 CIP - Traffic $1,000.50 $1,030.52 $1,031.00 Total $300,691.64 $1,725,027.12 $1,816,081.00 Note: Water Utility Operating Budget contains $1,029,200 for maintenance of Mains and Services. Only the amount needed for repairing concrete pavement is shown as the funds are used for all maintenance items. Note: the budget lines item denoted with an asterisk (*) include budget transfers from other projects that have come in under budget or are anticipated to come in under budget. Funding for the additional costs related to the Property Improvements — Community Development is available under TIF #21. Funding for the concrete work for the light bases is available in the Traffic Signal Equipment project in the 2018 CIP. Funding for the additional street and sidewalk costs is available from previous projects coming under budget. Property owners are invoiced for the cost of sidewalk and driveway apron repairs abutting their property. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 18-06 in the amount of +$300,691.64 to Al Dix Concrete, Inc. Approved: 91!�7 John Fitzpatric - Assistant City Manager / Director of Administrative Services JG/ttt I:\Engineering\2018 CONTRACTS\18-06 Sidewalk Page 2 Of 2 Rehab \ Project_fnformation \ Correspondence \ Memo \ 18-06 Memo for CO 171_3-21-19.docx TO: AL DIX CONCRETE, INC. 401 GERTRUDE STREET KAUKAUNA, WI 54130 CHANGE ORDER #1 DATE: MARCH 1, 2019 Your present contract with the City of Oshkosh, Contract No. 18-06, awarded March 27, 2018, is hereby amended and changed as follows: NET INCREASE TO UNIT A: $328,464.53 NET DECREASE TO UNIT B: ($1,540.00) NET DECREASE TO UNIT C: ($33,545.40) NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: $7,312.51 NET INCREASE TO CONTRACT $300,691.64 SECTION I TOTALS BID TOTAL $1,279,130.00 $1,279,130.00 CO #1 $300,691.64 $300,691.64 CONTRACT TOTAL $1,579,821.64 $1,579,821.64 CITY OF OSHKOSH BY: City Manager City Clerk Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 18-06 CHANGE ORDER #1 18-06 \A10PK I ]MIT A ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Removing concrete and asphalt sidewalk and driveway, complete as Square A-1120 specified Feet 90,000.00 133,796.74 43796.74 $1.50 $65,695.11 7" concrete pavement removal and replacement, including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square A-1308 as specified Yards 1,000.00 91.27 -908.73 $68.00 ($61,793.64) 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading, turf restoration; and traffic control; complete Square A-1318 as specified Yards 1,500.00 1,740.77 240.77 $75.00 $18,057.75 8" concrete pavement HES removal and replacement, including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration, and traffic control; complete Square A-1319 as specified Yards 500.00 181.17 -318.83 $83.00 ($26,462.89) Adjust manholes and inlets; A-1360 complete as specified Each 10.00 6.00 -4.00 $400.00 ($1,600.00) Turf restoration; complete as Square A-1370 specified Yards 400.00 94.97 -305.03 $12.00 ($3,660.36) Up -charge for late season cold weather concrete pavement; complete as Cubic A-1390 specified Yards 500.00 171.32 -328.68 $9.00 $2,958.12 12' radious curb with 6" CABC and grading, complete Linear A-1410 as specified Feet 250.00 0.00 -250.00 $12.00 $3,000.00) 18" concrete curb and gutter removal and replacement, including sawing; pavement ties; dowel bars; bond breaker, integral curb and fine grading; turf restoration; and traffic control, complete Linear A-1428 as specified Feet 750.00 304.30 -445.70 $65.00 ($28,970.50) 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Linear A-1448 as specified Feet 750.00 2,985.60 2235.60 $68.00 $152,020.80 Sidewalk curb; complete as Linear A-1460 specified Feet 100.00 538.70 438.70 $50.00 $21,935.00 Page 1 of 5 CONTRACT 18-06 CHANGE ORDER #1 ITEM CONTRACT INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 4" concrete sidewalk with 3" CABC and grading; complete Square A-1500 aspecified Feet 65,000.00 90,513.67 25513.67 $4.50 $114,811.52 4" concrete sidewalk with 3" CABC and grading, in existing subdivisions; Square A -1500A complete a specified Feet 1,500.00 8,910.30 7410.30 $5.25 $38,904.08 4" concrete sidewalk with 3" CABC and grading; water dept. locations, complete a Square A-1502 specified Feet 1,500.00 1,832.69 332.69 $8.00 $2,661.52 6" concrete sidewalk/driveway /ramp with 3" CABC and grading; Square A-1510 complete as specified Feet 25,000.00 40,156.33 15156.33 $5.25 $79,570.73 6" concrete sidewalk/driveway /ramp with 3" CABC and grading; water dept. locations; complete as Square A-1512 specified Feet 1,000.00 976.78 -23.22 $8.75 ($203.18) 8" concrete sidewalk/driveway /ramp with 3" CABC and grading; Square A-1520 complete as specified Feet 500.00 3,709.85 3209.85 $8.25 $26,481.26 6" concrete sidewalk with 3" CABC and grading; London Paver Pattern; complete as Square A-1526 specified Feet 300.00 62.80 -237.20 $65.00 $15,418.00) Curb ramp detectable warning field (natural/non- painted), complete as Square A-1540 specified Feet 500.001 560.00 60.00 1 $35.00 $2,100.00 No. 4 reinforcing rods - deformed, epoxy -coated; Linear A-1550 complete as specified Feet 1,000.00 544.00 -456.00 $2.50 ($1,140.00) Drilled No. 4 sidewalk tie bars - deformed, epoxy -coated; A-1560 complete as specified Each 10,000.00 9,298.00 -702.00 $6.50 $4,563.00 Cold weather covering (sidewalk) - single visquine; Square A-1580 complete as specified Feet 1,000.00 0.00 -1,000.00 $1.00 ($1,000.00 Cold weather covering (sidewalk) - double visquine; Square A-1582 complete as specified Feet 1,000.00 0.00 -1,000.00 $1.00 ($1,000.00 (sidewalk) - double visquine with 6" hay; complete as Square A-1584 specified Feet 500.00 0.00 -500.00 $1.00 ($500.00) Up -charge for late season cold weather concrete sidewalk; complete as Cubic A-1590 specified Yards 500.00 0.00 -500.00 $9.00 $4,500.00) Sawing existing pavement; Linear A-1700 complete as specified Feet 3,000.00 2,046.40 -953.60 $5.00 $4,768.00) Profile saw cut concrete curb; Linear A-1720 complete as specified Feet 150.00 39.00 -111.00 $50.00 ($5,550.00) Re -grade existing gravel driveways; complete as Square A-1820 specified Feet 75.00 0.00 -75.00 $20.00 ($1,500.00) Page 2 of 5 CONTRACT 18-06 CHANGE ORDER #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 5" asphaltic surface MT with 6" CABC and grading, Square A-1915 complete as specified Yards 500.00 0.00 -500.00 $65.00 ($32,500.00 C-1120 4" asphaltic surface LT with Feet 500.00 784.00 284.00 $1.50 $426.00 6" CABC and grading, Square A-1916 complete as specified Yards 500.00 494.13 -5.87 $65.00 ($381.55 2" asphaltic surface LT with Square B-1308 6" CABC and grading; Square 830.00 818.30 818.30 -11.70 $68.00 ($795.60 A-1917 complete as specified Yards 100.00 218.40 118.40 $65.00 $7,696.00 WORK UNIT A (BID ITEMS A-1120 - A-1917) - SUBTOTAL: $529,933.77 ($201,469.24) NET INCREASE TO WORK UNIT A: $328,464.53 WORK UNIT B TEM I DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE 7" concrete pavement removal and replacement; including sawing; pavement Square C-1120 ties; dowel bars; bond Feet 500.00 784.00 284.00 $1.50 $426.00 breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square B-1308 as specified Yards 830.00 818.30 818.30 -11.70 $68.00 ($795.60 Crushed aggregate base course; complete as B-1340 specified Tons 130.00 112.78 112.78 -17.22 $20.00 ($344.40) C-1318 Adjust manholes and inlets; Yards 200.00 407.90 207.90 $75.00 $15,592.50 B-1360 complete as specified Each 1.00 0.00 0.00 -1.00 $400.00 ($400.00 WORK UNIT B (BID ITEMS B-1308 - B-1360) - SUBTOTAL: $0.00 ($1,540.00) NET DECREASE TO WORK UNIT B: ($1,540.00) WORK UNIT C TEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE Removing concrete and asphalt sidewalk and driveway; complete as Square C-1120 specified Feet 500.00 784.00 284.00 $1.50 $426.00 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square C-1318 as specified Yards 200.00 407.90 207.90 $75.00 $15,592.50 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Square C-1319 las specified I Yards 1 300.001 0.00 1 -300.00 1 $80.00 ($24,000.00 Page 3 of 5 CONTRACT 18-06 CHANGE ORDER #1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Crushed aggregate base course; complete as Square C-1340 specified Tons 200.00 46.70 617.86 -153.30 $25.00 $2,162.51 ($3,832.50 Adjust manholes and inlets; C-1360 complete as specified Each 3.00 0.00 -3.00 $400.00 ($1,200.00 18" concrete curb and gutter removal and replacement; Lump 1-10000 including sawing; pavement Sum 0.00 1.00 1 1.00 1 1 $2,000.00 1 $2,000.00 ties; dowel bars; bond breaker, integral curb and Lump 1-10001 fine grading; turf restoration, Sum 0.00 1.00 1.00 $2,900.00 $2,900.00 and traffic control; complete Linear C-1428 as specified Feet 200.00 0.00 -200.00 $65.00 $13,000.00) 30" concrete curb and gutter removal and replacement; including sawing, pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete Linear C-1448 as specified Feet 200.00 100.00 -100.00 $68.00 ($6,800.00) 4" concrete sidewalk with 3" CABC and grading; complete Square C-1500 a specified Feet 500.001 457.20 -42.80 $4.50 ($192.60) 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as Square C-1510 specified Feet 500.00 326.80 -173.20 $5.25 $909.30) Curb ramp detectable warning field (natural/non- painted); complete as Square C-1540 specified Feet 6.00 24.00 18.00 $35.00 $630.00 Drilled No. 4 sidewalk tie bars - deformed; epoxy -coated; C-1560 complete as specified Each 20.00 32.00 12.00 $6.501 $78.00 Sawing existing pavement; Linear C-1700 complete as specified Feet 75.00 7.50 -67.50 $5.00 ($337.50) WORK UNIT C (BID ITEMS C-1120 - C-1700) - SUBTOTAL: $16,726.50 ($50,271.90) NET DECREASE TO WORK UNIT C: ($33,545.40) ADDITIONAL WORK REQUIRED: ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INUHLASL IN CONTRACT ULUHLA�;L IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE opjr= Cold Weather Covering (concrete pavement) - Single Square 1-1380 Visquine Yards 0.00 617.86 617.86 $3.50 $2,162.51 Extra time and materials to remove and fill the vaults within the righ-of-way on Brown Street and High Lump 1-10000 Avenue Sum 0.00 1.00 1 1.00 1 1 $2,000.00 1 $2,000.00 Extra time and materials to pour light bases within Lump 1-10001 sidewalk rehab areas Sum 0.00 1.00 1.00 $2,900.00 $2,900.00 Page 4 of 5 CONTRACT 18-06 CHANGE ORDER #1 ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 1-1380 - 1-10002) - SUBTOTAL: $7,312.51 $0.00 NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: $7,312.51 NET INCREASE TO WORK UNIT A NET DECREASE TO WORK UNIT B NET DECREASE TO WORK UNIT C NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: NET INCREASE TO CONTRACT: Page 5 of 5 $328,464.53 ($1,540.00) ($33,545.40) $7,312.51 $300,691.64 INCREASEIN DECREASEIN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Extra work for using a power buggy to transport concrete Lump 1-10002 through side yards Sum b.00 1 1.00 1 1.00 1 $250.00 $250.001 1 ADDITIONAL WORK REQUIRED: CO #1 (BID ITEMS 1-1380 - 1-10002) - SUBTOTAL: $7,312.51 $0.00 NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: $7,312.51 NET INCREASE TO WORK UNIT A NET DECREASE TO WORK UNIT B NET DECREASE TO WORK UNIT C NET INCREASE DUE TO ADDITIONAL WORK REQUIRED: NET INCREASE TO CONTRACT: Page 5 of 5 $328,464.53 ($1,540.00) ($33,545.40) $7,312.51 $300,691.64