Loading...
HomeMy WebLinkAbout2003-Plumbing (water heater) OSHKOSH ON THE WATER Job Address 1425 W 4TH AVE Contractor SAMMONS PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Lndry Stndp Res. Sink 0 Disposal Bar Sink 0 Dishwasher Water Heater I Sump Pump Site Drain 0 Classrm Sink Roof Drain 0 Braakrm Sink Use/Nature IFR/ Installgas water heater. of Work CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JEROME C RATCHMAN Category 410 - Residential-Interior 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 WaterSoftaer 0 Drink Ftn 0 Sen/Sink 0 Local Waste 0 Wait. St. 0 ShampSink -- 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink ' 0 Bidet 0 Exam Sink 0 Catch Basin -- 0 Beer Tap 0 SculrySink 0 Wash Ftn 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Lab Sink 0 Plaster Sink 0 Standp Rec -- 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 104542 Create Date 10/02/2003 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Size Sanitary Sewer Storm Sewer Water Service Material Type # 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Valuation $450.00 Plan Approval $0.00 Permit Fees Issued By Conn. Type $20.00 [] Permit Voided Date 10/02/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement resthctions of which it is not a party, Jf you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522W. MURDOCKAVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not pe~ormed within two business days from the time the project is ready.