Loading...
HomeMy WebLinkAboutHVAC (Plan No. 78-12-0208-B) 01/18/1979 € 's`: �'-";� r � r [ r �t�te o� �'Visc�onsin \ Department of Industry, Labor and Human Relations = € � Please Reply to: ' : January 18, 1979 SAFETY & BUILDINGS DIV. : File Number E-86969 � 201 E. Washington Avenue P.O. Box 7946 Madison, Wisconsin 53707 � P. 0. Box 7969 � Marx Heating & Air Conditioning ; 3705 Waukau Avenue Oshkosh, Wisconsin 5�+901 Home Improvement Center �' C. Lueek, Jr. ���706�outh Main �6�hkosh, Winnebago County Plan Number 78-12-0208-B $44 Inspection Fee Paid ` 3 Tom Sizelove, HV Supervising Designer � Heating, ventilating and air conditioning plans have been reviewed by the s Department of Industry, Labor and Human Relations for compliance with the important code requirements. The drawings are stamped "Conditionally Approved" and construction may proceed subject to local regulations, but all items that are required to be changed by this letter must be corrected before commencing that part of the work. You are hereby advised that the owner as defined in Chapter 101 .01 (2) (i) of the Wisconsin State Statutes is responsible for all code requirements not specifically cited herein. Code requirements are set forth in Chapters 50 to 64 of the Rules of the Department. The building will be inspected during construction and a final inspection will be made after construction by a deputy of this Department to insure complete compliance with Wisconsin Codes. Evidence of approval. The architect, professional engineer, designer, builder or owner shall keep at the building, one set of plans bearing the stamp of approval. Sincerely, Ronald Tilley Staff Engineer RT:TH0701/1 cc: Re on 3, Bries Mr. L. Thomas Sizelove, Jr. �L. Reimer, Bldg. Insp. Lennox Industries, Inc. Post Office Box �3�7 Mr. C. Lueck, Jr. Madison, Wisconsin 53705 69-1A West Fourth Avenue Oshkosh, Wisconsin 54901 . DILHR-ADM-5120