HomeMy WebLinkAboutItem VII PLAN COMMISSION STAFF REPORT MARCH 19,2019
ITEM VII: PUBLIC HEARING: OFFICIAL MAPPING FOR 30 FOOT WIDE RIVERWALK
ALONG THE NORTH SHORE OF THE FOX RIVER AT 1005 HIGH AVENUE
(AXLETECH INTERNATIONAL)
GENERAL INFORMATION
Applicant: City of Oshkosh
Owner: Axletech International,Inc.
Action(s) Requested:
The City of Oshkosh requests approval to officially map a 30 foot wide corridor for future
riverwalk development along the north shore of the Fox River at the Axletech property, 1005
High Avenue. The proposed newly mapped riverwalk corridor would eventually replace the
existing 15 foot wide pedestrian easement that currently runs through the property and is
developed with a gravel trail.
Applicable Ordinance Provisions:
Section 62.23(6)(b) of the Wisconsin Statutes regulates official mapping by municipalities.
Section 2-52 of the Municipal Code and Article XII of the Zoning Ordinance designate a
function and duty of the Plan Commission to make recommendation on the establishment and
amendment to the City's Official Map.
Property Location and Background Information:
The subject site consists of Axletech International's manufacturing plant which occupies
approximately 2,150 feet of the northerly shore of the Fox River. The southern 3/4 of the
property is developed with the industrial building, storage, off-street parking and a segment of
the WIOUWASH State Recreation Trail. The northerly 1/4 is undeveloped with exception of the
aforementioned WIOUWASH Trail which veers from the shoreline and cuts through the middle
of the undeveloped property.
The surrounding area consists of mostly medium to high density residential uses to the east, a
marina to the north,manufacturing to the south(south of the proposed mapping area) and the
Fox River to the west.
Subject Site
Existing Land Use Zoning
Vacant Land(proposed mapping area)/Industrial Urban Industrial with Riverfront
Overlay (UI-RFO)
Page 1
Adjacent Land Use and Zoning
Existing Uses Zoning
Riverfront Mixed-Use with Riverfront
North.-..._Commercial(Marina) _ __ ..._Overll(RMU-RFO)........--........_..........................__........_.............._.._
.............. ........ .....................................__..._..........._.__. ......
Institutional with Planned
South University of Wisconsin-O_s_hkosh i Development Overlay —
East Multi-Family Residential Multi-Family Residential 20 (MR 20)
_..._............................ ._...._...----...............-_...Y_............_.....__.............................._-_............_.. . . ..._ ......................................._..........._.-....._...--......
--........................_...__.......__............_........._................
West Fox River I N/A
Comprehensive Plan Land Use Recommendation Land Use
2040 Land Use Recommendation Mixed-Use
ANALYSIS
Official mapping is the process by which a municipality can designate or reserve areas for
specific public uses for future acquisition and/or development. Once officially mapped,those
areas are protected from development that may interfere with future city plans within the
officially mapped area unless otherwise authorized by the local legislative body. In Wisconsin,
municipalities may use official mapping to establish an official street network and future
streets,historic districts,parks and playgrounds,railroad right-of-way,public transit facilities
and waterways.
The Winnebago County Parks Department is currently responsible for upkeep and maintenance
of this segment of the WIOUWASH Trail. The trail currently runs along the shore for most of
the Axletech property, then heads northeasterly away from the shoreline heading through the
middle of the undeveloped portion of the property and outside of the designated easement
area. The county has budgeted to move the trail into an existing pedestrian easement owned by
the city. The easement veers east away from the river along the north side of Axletech's parking
lot up to the rear lot lines of the multi-family developments along High Avenue. The easement
then runs along the rear lot lines northwesterly towards W. New York Avenue.
Instead of relocating the trail to the existing easement area, the city would prefer to realign the
trail to the proposed mapping area which runs it parallel to the river for as long as practical
before swinging back along the Spellman marina property and to the existing trail easement.
This would require working with the property owner to release the existing easement
(removing the development restriction in that area) and obtaining an easement in the newly
mapped area. The mapping follows along an existing 20 foot wide city sanitary sewer easement
running along the shoreline which is also appears to follow an ATC easement so the mapped
area is relatively undevelopable for building development. Staff feels the proposed relocation
of the trail will heighten the recreational experience for the public by having the trail in closer
proximity to the river, similar to most of the riverwalk the city has constructed in recent years.
The Comprehensive Plan recommends the subject site suitable for mixed-use development.
Staff is of the opinion that the proposed mapping action is consistent with the Plan's
recommendation as it will provide additional public access to waterfront amenities. The city
Item VII—Official Mapping—Rivmvalk—1005 High Avenue 2
Page 2
envisions an eventual connection of this trail to the trail system currently being designed for
Lakeshore Park.
RECOMMENDATION/CONDITIONS
Planning staff recommends approval of the official map action as requested.
Item WI—Official Mapping—Rivenualk—1005 High Avenue 3
Page 3
4kl I
�9! a
�I
I GO�G� � � REED Pv
n
1r,
OO,
rIi � ,yes M k:
A >�t'V 1 Ir
g, '9G GO
� N
n
I
. lu
v,
r
�a
A .
4
a�
F
u
a .
T {6S
x
ADAMS AV
x
PIERCE AVrr
4.
\
i
�o 0
W-NEW R-K-Aa! -NEW-Y—ORJ-AN
/ i
o a
\1
\ A
1
oouoG u \
N
tin=0.04mi
1 in=200ft
tv
City of Oshkosh maps and data are intended to be used for general identification purposes only,and Cit},
the City of Oshkosh assumes no liability for the accuracy of the information. Those using the cog
information are responsible for verifying accuracy. For full disclaimer please go to Printing Date:3/4/2019 ^^ t�Q
www,ci,oshkosh.wi.us/GlSdisclaimer Prepared by:City of Oshkosh,WI 0 J h J
TGISTIanningTlan Commission Site Plan Map TemplateRan Commission Site Plan Map Template.mxd User:minak
Page 5
SR-3 SR=5
T �
M -.20f PI !'
-PD i
UMU-RFO
SR-5 SR-9` �
CO I-P-D ✓ , , , ; ; ;
SR-5
h UMU
MR-20-RFO
G�
•0
RMU `
MR'-20"
®Iffl
IN I
� t
RMU-RFO
_.. _ SR-5
i �1'R=10
MR-20
_ ._._. ...... M�R•12UT
i
SR-5-UTO
t.. ..... . . I-PD J I-PD-UTO
RMU UI-RFO
SR•9 � !
i
! j
RMU-PD
TAFT AV
i 'iy'. 1-1
.....{..... �....._. _.............
e i r..l•L S^��
anti I
t 1 ,i((f Ii 1T(lI I1 x.
UMU I-PD11RM � IlI
owl]
N
1 in=0.09mi
1 in=500ft
City of Oshkosh maps and data are intended to be used for general identification purposes only,and (-ity,
the City of Oshkosh assumes no liability for the accuracy of the information. Those using the 0'
information are responsible for verifying accuracy. For full disclaimer please go to Printing Date:3l4/2019 #_( �Oshkosh
www.ci.oshkosh.wi.us/GlSdisclaimer Prepared by:City of Oshkosh,WI os
J1G&PIanningman Commission Site Plan Map TemplateRan Commission Site Plan Map Template.mxd User:minak
Page 6
i
ar+^� per—m-
s
i
l.
Y
NY
VIN
r
Y
{
1W 4 1
`, �. k A +
r 1 in 0.03 mi
tin= 180ft G,
City of Oshkosh maps and data are intended to be used for general identification purposes only,and city;
the City of Oshkosh assumes no liability for the accuracy of the information. Those using the ar
information are responsible for verifying accuracy. For full disclaimer please go to Printing Date:3/4/2019 0.1��
www.ci.oshkosh.wi.us/GlSdisclaimer Prepared by:City of Oshkosh,WI 0 s �
7GIST anningRan Commission Site Plan Map Template\Plan Commission Site Plan Map Template.mxd User:minak
Page 7