HomeMy WebLinkAbout08. 19-137 MARCH 12, 2019 19-137 RESOLUTION
(CARRIED 7-0 LOST LAID OVER WITHDRAWN )
PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT
NOTICES AND HEARING IN CONNECTION WITH
IMPROVEMENTS— CASEY'S MEADOW FOURTH ADDITION
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED BY the Common Council of the City of Oshkosh that the Waiver
of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the Wisconsin
Statutes, for public improvements and services, for the premises described below and in
the attached Waiver is accepted and approved.
FOURTH ADDITION TO CASEY'S MEADOW SOUTH
Lots 77 through 114
-REGI QED
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66.0703, WISCONSIN STATLftW ot. U
0SHICOS11 13L1�. 14/
The undersigned, owner of property benefited by the following improvements to be made fr NS1cS
City of Oshkosh,Winnebago County, State of Wisconsin,to wit:
For public construction, surveying and inspection of concrete street light bases, concrete
sidewalk and terrace tree installation and installation of street light poles and fixtures.
For private construction and public inspection and survey for sanitary sewer, storm sewer,water
main, laterals, grading&graveling, asphalt recreation trail, sidewalk and concrete street
pavement.
In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I
hereby admit that such public improvement will benefit said property and consent to the levying
of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for
the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I
hereby waive all special assessment notices and hearings required by Section 66.0703 of the
Wisconsin Statutes; and I further agree and admit that the benefit of my property from the
construction of such improvements is in proportion to the footage thereof:
Description of Premises
Fourth Addition to Casey's Meadow South
Lots 77-114
Construction of Sage Crossing, Mockingbird Way,Wyatt Way and Casey Trail
1. Sanitary Sewer&Laterals (Private Construction)
Estimated Construction Cost $125,308.50 Private
6% Survey and Inspection $7,518.51 Payment
2, Water Main with Laterals (Private Construction)
Estimated Construction Cost $192,822.00 Private
6% Survey and Inspection $11,569.32 Payment
3. Storm Sewer w/Laterals (Private Construction)
Estimated Construction Cost $160,143.00 Private
6% Survey and Inspection $9,608.58 Payment
4. Grading, Graveling and Restoration(Private Construction)
Estimated Construction Cost $151,500.00 Private
6% Survey and Inspection $9,090.00 Payment
I:\Engineering\Waiver of Special Assessment\Waiver of Special Assess-by Subdivision\Casey's Meadow\Fmth Addition\Forth Addition Caseys Meadow Waiver.doc 2/22/2019
Fourth Addition to Casey's Meadow South
Page 2 of 5
5. Detention/Swale Grading and Restoration(Private Construction,Private Survey/Inspection)
Estimated Construction Cost $112,700.00 Private
6% Survey and Inspection $0.00 Private
6. Sidewalk(Public Construction)Assess
Assessment Rate=$27.50 per front foot of each lot
Includes 6%for Inspection and Surveying
Lot# Sidewalk Footage Sidewalk Cost Estimate
77 80.07 $2,201.93
78 80.08 $2,202.20
79 80.08 $2,202.20
80 80.01 $2,200.28
81 80.00 $2,200.00
82 80.00 $2,200.00
83 75.00 $2,062.50
84 73.56 $2,022.90
85 81.47 $2,240.43
86 80.70 $2,219.25
87 85.67 $2,355.93
88 61.00 $1,677.50
89 61.18 $1,682.45
90 61.03 $1,678.33
91 61.03 $1,678.33
92 61.03 $1,678.33
93 61.02 $1,678.05
94 61.00 $1,677.50
95 80.00 $2,200.00
96 215.70 $5,931.75
97 107.01 $2,942.78
98 61.10 $1,680.25
99 61.00 $1,677.50
100 61.00 $1,677.50
101 61.00 $1,677.50
102 61.00 $1,677.50
103 61.00 $1,677.50
104 198.27 $5,452.43
105 62.00 $1,705.00
106 189.27 $5,204.93
107 198.27 $5,452.43
108 61.00 $1,677.50
109 61.00 $1,677.50
110 81.00 $2,227.50
111 74.10 $2,037.75
112 73.30 $2,015.75
113 117.27 $3,224.93
114 225.99 $6,214.73
IAEugineering\Waiver of Special Assessment\Waiver of Specint Assess-by Subdivision\Case}+s MeadowToRb Addition\Forth Addition Caseys Meadow Waiver.doc 222/2019
Fourth Addition to Casey's Meadow South
Page 3 of 5
7. Asphalt Recreation Trail
Estimated Construction Cost $5,000.00 Private
6% Survey and Inspection $300.00 Payment
8. Concrete Street Paving(Private)—Paving completed by July 31, 2022.
Native backfill to be used in utility trenches. No paving until trenches have
settled for three full winter seasons.
2,029 Center Line Feet of Roadway at$220/lf=$446,380.00
Nine (9)Handicapped Ramps at$600.00 each=$5,400.00
271 Feet Sidewalk along lot not in plat=$7,452.50
(NW corner Sage Cr and Mockingbird Way)
Estimated Construction Cost $459,232.50 Private
6% Survey and Inspection $27,553.95 Payment
9. Street Lighting
Lighting fixture/equipment acquisition $15,606.51 Private
Installation of underground conduit $30,330.00 Private
Estimated Construction Cost(Public) $3,250.00 Payment
Includes installing bases,poles and fixtures
6% Survey and Inspection $1,819.80 Payment
10, Terrace Trees (Public Construction)Assess
Assessment Rate=$300 per tree
Lot Number Estimated Number of Estimated Cost
Terrace Trees
77 1 $300.00
78 2 $600.00
79 1 $300.00
80 2 $600.00
81 2 $600.00
82 2 $600.00
83 2 $600.00
84 1 $300.00
85 1 $300.00
86 2 $600.00
87 2 $600.00
88 1 $300.00
89 2 $600.00
90 1 $300.00
91 1 $300.00
92 2 $600.00
93 1 $300.00
L01gineering\Waiver of Special Assessment\Waiver of Special Assess-by Subdivision\Casey's MeadowTorth AdditionTorth Addition Caseys Meadow Waiver.doc 2/22Y_2019
Fourth Addition to Casey's Meadow South
Page 4 of 5
94 1 $300.00
95 1 $300.00
96 4 $1,200.00
97 1 $300.00
98 1 $300.00
99 1 $300.00
100 1 $300.00
101 1 $300.00
102 1 $300.00
103 2 $600.00
104 4 $1,200.00
105 1 $300.00
106 3 $900.00
107 3 $900.00
108 1 $300.00
109 1 $300.00
110 1 $300.00
111 2 $600.00
112 2 $600.00
113 2 $600.00
114 4 $1,200.00
11. Final Plat Monuments (Private)
Estimated Construction Cost $4,000.00 Private
BEngineering\Waiver of Special Assessment\Waiver of Special Assess-by SubdivisionTasey's MeadowTortb AdditionTortb Addition Caseys Meadow Waivendoc 222/2019
Fourth Addition to Casey's Meadow South
Page 5 of 5
Summary of Cost Calculations
Dev Agree Waiver Private Engr. and Inspection Public
Section Cost (Public) Construction
1 $125,308.50 $7,518.51
2 $192,822.00 $11,569.32
3 $160,143.00 $9,608.58
4 $151,500.00 $9,090.00
5 $112,700.00
6
7 $5,000.00 $300.00
8 $459,232.50 $27,553.95
9 $45,936.51 $1,819.80 $3,250.00
10 $0.00
11 $4,000.00
Totals $1,256,642.51 $67,460.16 $3,250.00
4—Year Irrevocable Letter of Credit or Bond for Private Construction=$1,256,642.51
Cash Payment for Public Engineering, Inspection and Construction=$70,710.16
2—Year Irrevocable Letter of Credit after Acceptance of Private Construction=$251,328.50
Signature of Owner or Authorized Representative:
Name Date
I:\Engineering\Waiver of Special Assessment\Waiver of special Assess-by Subdivision\Casey's Meadow\Forth Addition\Forth Addition Caseys Meadow Waiver.doc 2/22/2019