HomeMy WebLinkAbout2003-BuildingOSHKOSH
ON THE WATER
.lob Address 1118 W 4TH AVE
Designer
Category
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner SECRETARY OF HOUSING AND UBAN DEVEI Create Date
Contractor OWNER
150 - New Accessory Buildings-Garages (Residential) Plan
No 105319
11/14/2003
Type IO Building {~ Sign {~ Canopy {~ Fence {~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. L~ Projection J
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0
Garage 0 Sq. Ft. Baths 0 Signs 0
Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other
(~ Concrete Block (~ Post (~ Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature SFR/ Constructing a 24' x 26' detached garage in the rear yard. The driveway is existing gravel.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$9,500.00 Plan Approval $0.00 Permit Fee Paid
$65.00 Park Dedication $0.00
Date 11/14/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 5040 300ADDISON CIRCLE ADDISON TX 75001 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKIJST
JOB LOCATION:
PROPER~ONTRACTOR:
CONSTRUCTION DATA:
New Construction
' TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
ZONING
Addition
Z~ X ~'
Alteration
COMPLIANCE CHECKLIST
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
. Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards ,
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all planS, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc.,
when the use is conforming and when no change is proposed.
APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: ~/~
,DATE: /'~//"~/~..~
q,
~ ~... ~
..
~r..
~ 5~ ~.
~» h:
t
1118 w 4th 1 Taken by John Zarate
Violation(s) of at 1118 W 4th
1118 w 4th 2 Taken by John Zarate
Violation(s) of at 1118 W 4th
1118 w 4th 3 Taken by John Zarate
Violation(s) of at 1118 W 4th