Loading...
HomeMy WebLinkAbout2003-Building (fence)OSHKOSH ON THE WATER .lob Address 1050 WITZEL AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner HURLEY PROPERTIES LLC Contractor WHIRLWIND POST HOLES & FENCES Category 251 - Fences No 105398 Create Date 11/19/2003 Plan Type Building (~ Sign (~ Canopy (~ Fence ~ Raze Zoning Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Poured Concrete Concrete Block Not Required 0 Sq. Ft. 0 Sq. Ft. 0 Sq. Ft. ~ Floating Slab ~ Post Class of Const: Rooms 0 Height 6 Ft. Bedrooms 0 Stories Baths 0 (~ Pier (~ Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures Size ~J Projection I Canopies 0 Signs 0 Use/Nature COMMERCIAL/Install 265 lin ft of 6' tall wood fence along North Property line. * Late Permit of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $5,600.00 Plan Approval $0.00 Permit Fee Paid $120.00 Park Dedication $0.00 Date 11/19/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 9151 APPLETON WI 54911 - 9151 Telephone Number 920-954-9650 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. JOB LOCATION: ZONING/LAND USE COMPUANCE CHECKUST PROPERTY OVVNEPJCONTRACTOR: CONSTRUCTION DATA: New Construction Addition TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) COMPLIANCE CHECKLIST DEFICIENT COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan ZONING Alteration REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. ~ APPROVED DENIED Plan Commission Action Required Variance(s) Requ~,~ REVIEWED BY: ,/~