Loading...
HomeMy WebLinkAbout0105294 PCITY OF OSHKOSH 105294 No OSHKOSHPLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address2326 OREGON STOwnerLEONARD G/THERE SCHMICKCreate Date11/13/2003 ContractorMS PLUMBINGCategoryPlan 440 - Industrial-Interior Bathtub0Shower0Ejector/Grind0Dip Well0F Prep Sink1Gar Drain0 Whirlpool0Floor Drain1Water Softner0Drink Ftn0Serv Sink10 Soda Disp Lavatory20Local Waste0Wait. St.0Shamp Sink00 Lndry TrayCoffee Maker Toilet20Clothes Wshr0Ice Chest1Flr/Wst Sink0 0 Lndry Stndp Int Grease Trap Res. Sink00Bidet0Exam Sink0Catch Basin0 Disposal0 Ext Grease Trap Bar Sink001Wash Ftn0 Beer Tap0Sculry Sink Dishwasher RPZ Valve0 Water Heater100Urinal0 Sump PumpDent. Oper.0Hand Sink 0 Eye Wash Statn Site Drain000Standp Rec0 Classrm SinkLab Sink0Plaster Sink Roof Drain000Ice Maker0 Breakrm SinkSterilizer0Surgeons Sink Use/Nature Includes a gas water heater of Work SizeMaterialType#Conn. Type Sanitary Sewer0 0 0 0 0 Storm Sewer0 0 0 0 0 Water Service0 0 0 0 0 $0.00Permit Voided Valuation$10,000.00Plan ApprovalPermit Fees$60.00 Issued ByDate11/13/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner Address3660 CTY RD FFOMROWI54963-0000Telephone Number920-685-0473 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.