Loading...
HomeMy WebLinkAbout0105290-Building e OSHKOSH ON THE WATER Job Address 2125 W 20TH AVE CITY OF OSHKOSH No 105290 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES A/MARY L MORGAN Create Date 11/13/2003 Designer Contractor FLUOR BROS CONSTRUCTION CO Category 209 - New Industrial Plan J8-122-1103 Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning M3 Class of Const: 2Bibc Size 28x45 Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~ Sq. Ft. Bedrooms 0 Stories 1 Garage ~ Sq. Ft. Baths 0 U Projection 1 Canopies 0 Signs 0 Foundation 0 Poured Concrete 8 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures Contractor Shop/ Install a 1260 sf storage warehouse and expand parking 10t.'Conditions of Permit issuance: Lot to be paved by 10-31-04. Landscape plan to be submitted and approved by 11-30-03. Landscaping to be completed by 10-31-04. Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $50,000.00 Plan Approval $0.00 Permit Fee Paid $210.00 Park Dedication $0.00 Issued By: Date 11/13/2003 Final/O.P. 00/00/0000 U Permit Voided 1 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 203 OTTER AVE Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 231-6260 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: 2125 W. 20th Avenue PROPERTY OWNER/CONTRACTOR: Tower Mechanical CONSTRUCTION DATA: 0 NewConstruction ¡:g Addition ZONING: ~ 0 Alteration TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc. .1260 sa.ft Storaae Building. Parking Lot Addition COMPLIANCE CHECKLIST DEFICIENT 0 Use 0 Lot Width 0 Lot Area 0 Lot Area Per Family 0 Flood Plain 0 FrontYard 0 Front Yard Side Street DEFICIENT 0 RearYard 0 Side Yards 0 Building Area 0 Parking Standards 0 Off-Street Loading Standards 0 Vision Clearance 0 Transitional Yard Standards COMMENTS: DEFICIENT .I8J. Landscape Standards 0 Height 0 Conditions of Approval 0 Compliance with P.C. or BZA Conditions of Approval 0 Signage Standards 0 Mechanical Equip. Screening 0 Parking Lot Lighting 1. The off-street parking lot is being expanded in excess of 50% of the existing parking area, which requires the entire parking lot comply with the City's parking lot landscaping standards. The parking lot is comprised of 720 linear feet of parking lot perimeter, which requires 15 trees and 72 shrubs. Please resubmit two (2) copies of an updated landscape plan, for review. 2. Per the submitted plan, no parking spaces are depicted in the new rear asphalt area. This area may not be used for parking of any vehicles, trailers or equipment, and may not be used for open storage of materials unless enclosed by a minimum of a 6' tall solid fence. REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. 0 APPROVED Plan Commission Action Required Variance(s) Required we- REVIEWED BY: Matt Tucker I' ) JZl DENIED DATE: 11-6-03 ZONINGILAND USE COMPLIANCE CHECKUST JOB LOCATION: 'Z ,::::£ tV è.~ PROPERTY OWNER/CONTRACTOR: CONSTRUCTION DATA: ;( ZONING 1r)---3 New Construction Addition Alteration . TYPE OF CONSTRUCTION: (I.e. fence, pool, parking lot, sign, etc.) ¿g)C~r .:Ç-k h~':5'" COMPLIANCE CHECKLIST DEFICIENT Use Lot Width Lot Area Lot Area Per Family - Floodplain Front Yard Front Yard Side Street Rear Yard - Side Yards - Building Area - Parking Standards - Off-Street Loading Standards Vision Clearance - Transitional Yard Standards Landscape Standards - Height Conditions of Approval == Compliance with P.C. or BZA Conditions of Approval - Signage Standards - Drainage Plan ß~, COMMENTS ~ 'S i'k y ~;\. }A. ~ tkj'<-:& YV.:t .~ ~~~-Þf\-Y c..(J\o-.\.-t'\,-\~5.I) ~ ~~ WJP. ìC......- a1'LN a r-"t"A- 1'$ JlttJ+ .sÁ<9<&1<- a...$ e¡Cf.s:¡f...!: -J-od1' REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. - APPROVED )( DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: ,/Â')/;Z DATE: /¡J- ¿2--Q3 OISCLAIMER City of Oshkosh Wisconsin Community Development ~ O.lJj~JH N A Th. m.p;, m;"~"'" ""'""" m""... """"'Md;';""";,""'d..""..~d,"M. Th;,d'M;.....œmp""mof~œnl"".. ""'mr.........I~";.,ori'mci"œM' Md""""'~Md"""mœ,.ff~.., "'mœ"w'Md;.;...........r..ref~œ pmp~'ooly. T..a,.r"'bI.."h;....re- .po..;bI,r"My¡m'œ""",h~;,œ.""œd. If..........,""~r""'.ø_'_d'" c",.r"'"""" 2125 W. 20th Ave. ]" ~ 60' Created by - MT 11/0512003 , Inc. stria! Development Corporation 375 City Center, Suite M Oshkosh, WI 54901 920-232-9786 . 920-232-4954 Fax Email: chamco@chamco.org November 6, 2003 Mr. Allyn Dannhoff Chief Building Inspector City of Oshkosh P. O. Box 1130 Oshkosh, WI 54903-1130 Dear Allyn: Please accept this letter as confirmation of Cham co's approval of the expansion plans of Tower Mechanical, submitted by Richard Paulsen of Fluor Brothers Construction Company, as they pertain to a new parking lot, storage facility and fenced area at their location on 20th Avenue in our Southwest Industrial Park. Our approval is contingent upon the following conditions: . The parking lot will be paved as soon as weather permits in 2004 . The fence offers full screening and is understood to be a slotted cyclone fence . Any access tö the proposed storage building and fenced in area will be paved as soon as weather permits in 2004 . Upon completion, all future outdoor storage must be screened. Trailers for such use will no longer be permitted. I appreciate the fact that all parties are in a hurry to commence with this project. Our approval has been unfortunately delayed due to an enormous number of additional time sensitive issues. We apologize for this untimely response. Please feel free to call with any further questions or if! can help in any other way. Cc: Douglas C. Pearson, Chamco Executive Director David Borsuk, Chamco Site Plan Review Committee Chair Richard Paulsen, President, Fluor Brothers Construction Company Matt Tucker, Assistant Planner, City of Oshkosh James Morgan, President, Tower Mechanical Services, Inc. Dean Arganbright, Chamco President Advancing the Industrial Development of Oshkosh Since 1960 CITY HALL 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 ~ OfHKOfH ON '"' WAm (920) 236-5065 Mr. John Davel, P.E. Davel Engineering 1811 Racine Street Menasha, WI 54952 October 31, 2003 Re: Tower MechanicallRevised Drainage Plan Dear Mr. Davel, The revised drainage plan for Tower Mechanical has been reviewed and approved. (Plan Date 9/23/03). lfyou have not already reviewed the parking lot expansion with the City of Oshkosh Planning Department, it will be necessary to do so. Please obtain all necessary permits for the project ~ cott rickson Ass!. Director Public Warks Cc: David C. Patek, Director of Public Works Ed Potempa, Civil Engineer II Allyn Darmhoff, Chief Building Inspector Matt Tucker, Associate Planner