HomeMy WebLinkAbout0105289-Building(~ CITY OF OSHKOSH
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
JobAddress 1215 PHEASANT CREEK DR Owner RUSCH HOMES LLC
Designer Contractor RUSCH HOMES LLC
Category 140 - Interior Remodeling
No 105289
Create Date 11/13/2003
Plan
Type 10 Building ~ Sign ~ Canopy ~ Fence ~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other
~ Concrete Block ~ Post ~ Treated Wood
Occupancy Permit Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature
of Work
SFR/Remodeling the lowest level of the quad level home to create 2 craft rooms. THESE ROOMS ARE NOT TO BE USED AS BEDROOMS
FOR THEY DO NOT MEET THE MINIMUM CODE REQUIREMENTS. A minimum of 7' ceiling height will be provided. This permit does not
include the heating or electrical permit.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
CONDON TOTAL COMFORT
CUMINGS ELECTRIC
Plumbing Contractor
$5,000.00 Plan Approval $0.00 Permit Fee Paid
$40.00 Park Dedication $0.00
Date 11/13/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address P O BOX 423 Omro WI 54963 - 0000 Telephone Number 685-0241
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.