HomeMy WebLinkAbout0105277-Building (fence)(~ CITY OF OSHKOSH
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1175 PHEASANT CREEK DR Owner PETER S/JUDY K KORELL
Designer Contractor RAMMER FENCE
Category 251 - Fences
No 105277
Create Date 11/10/2003
Plan
Type
Building (~ Sign (~ Canopy O Fence ~ Raze
Zoning
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
Poured Concrete
Concrete Block
Not Required
0 Sq. Ft.
0 Sq. Ft.
0 Sq. Ft.
~ Floating Slab
~ Post
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~ Pier (~ Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures
Size
L~ Projection
Canopies
Signs
Use/Nature SFR/Installing 143' of 5' high chain link fence per the plan submitted. The fence will not be installed in the rear 10' drainage easement.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$1,765.00 Plan Approval $0.00 Permit Fee Paid
$20.00 Park Dedication $0.00
Date 11/12/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 3120 SHELDON DRIVE OSHKOSH WI 54904 - 0000 Telephone Number 233-2444
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.