Loading...
HomeMy WebLinkAbout0105270 BOSHKOSH ON THE WATER .lob Address 643 MOUNT VERNON ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner LISAA SPANBAUER Contractor OWNER Category 141 - Exterior Remodeling No 105270 Create Date 11/12/2003 Plan Type IO Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection J Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq. Ft. Baths 0 Signs 0 Foundation O Poured Concrete (~ Floating Slab (~ Pier (~ Other (~ Concrete Block (~ Post (~ Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Replacing the front stairs. The stairs shall have uniform treads and risers and have handrails with intermediate rails installed. of Work HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $350.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 11/12/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 643 MOUNT VERNON ST OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.