Loading...
HomeMy WebLinkAbout0105178-Building (garage addition)OSHKOSH ON THE WATER .lob .Address 856 W 12TH AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner MARYS FREI Contractor PRECISION BUILDING PRODUCTS INC Category 152 - Addn/AIt to Accessory Building (Res) No 105178 Create Date 11/06/2003 Plan Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other (~) Concrete Block (~) Post (~) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Constructing a 16'x22' addition to the existing detached garage. The garage will be 3' from the lot line. All construction shall comply with of Work local and state building code requirements. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $5,400.00 Plan Approval $0.00 Permit Fee Paid $45.00 Park Dedication $0.00 Date 11/06/2003 Final/O.P. 00/00/0000 Permit Voided In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 295W SCOTT FOND DU LAC WI 54935 - 0000 Telephone Number 923-1000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ZONING/LAND USE COMPUANCE CHECKLIST JOB LOCATION: ~ PROPERTY OWN C~~CT~~ CONSTRUCTION D'ATA~: ~ New Construction · TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) Addition Alteration COMPLIANCE CHECKLIST DEFICIENT COMMENTS Use Lot Width Lot Ama Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Ama Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with p.C. or BZA Conditions of Approval ' Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or intedor work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows~ etc., when the use is conforming a_nd when no change is proposed. ~'~ ~:~^PPROVED DENIED Plan Commission Action Required .Vadance(s) Req~iT~..... REVIEWED BY: t