HomeMy WebLinkAbout0105179 BOSHKOSH
ON THE WATER
.lob Address 30 WISCONSIN ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner D & F INVESTMENTS OF OSHKOSH LLP
Contractor PORTSIDE PROPERTIES INC
Category 256 - Parking Lots, Driveways
No 105179
Create Date 11/06/2003
Plan
Type I(~ Building (~ Sign (~ Canopy (~ Fence (~ Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~J Projection
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies
Garage 0 Sq. Ft. Baths 0 Signs
Foundation O Poured Concrete (~) Floating Slab (~) Pier (~) Other
(~) Concrete Block (~) Post (~) Treated Wood
Occupancy Permit Not Required Flood Plain No Height Permit Not Required
Park Dedication Not Required # Dwelling Units 0 # Structures 0
Use/Nature Parking lot/Construct parking lot expansion per plans approved by planning dept.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plumbing Contractor
$100,000.00 Plan Approval $0.00 Permit Fee Paid
$335.00 Park Dedication $0.00
Date 11/06/2003 Final/O.P. 00/00/0000
Permit Voided
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 923 S MAIN ST OSHKOSH WI 54902 - 0000 Telephone Number 426-1544
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
ZONING/LAND USE COMPLIANCE CHECKUST
JOB LOCATION: ~-~D
PROPERTY OVVNER/CONTRACTOR:
CONSTRUCTION DATA: JNew Construction
TYPE OF coNSTRUCTION: (i.e. fence, pool, paddng lot, sign, etc.)
ZONING
Addition
=,=
Alteration
COMPLIANCE CHECKLIST
· DEFICIENT
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
COMMENTS
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc.,
when the use is conforming and when no change is proposed.
APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY: ~
DATE: